You are on page 1of 2
FRESH WATER FLUSH Pas & v7 {OW PRESSURE FI V8 LP PX SYSTEM OUTLET BRINE DISPOSAL caRTRDGE FuLTER % > a Low pressure ge a? SEE NOTE 15 Tm FEED WATER LP PX. SYSTEM INLET sc pps sc ve - 1 sc SS k sit wre 9 veo] oy SEE NOTE 11 , TREATED FEED WATER —_— M) As Hc} pRessuRE Q FEED WATER . SEE NOTE 8 oo vio [ o \Z PP SYSTEN OUTLET mm xm FRESH WATER FLUSH V6 sc HIGH PRESSURE. A — = — — 4 oft M) }- — — — 5 nt om A carTnoce mur & _ Wot messune L aD WATE SEE NOTE 15 | jr” J A t vi - ‘SEE NOTE 9 x Pa sc ™ mu @ "WeATED FEED WATER enue WATER a0 ae oe et pee Gri) ENERGY RECOVERY INC, | _PIPING AND INSTRUMENT DIAGRAM Sten eA RRERNETT ees pope 7 NR ti Sn te 97 et sermon sms PX SYSTEM INSTALLATION a FER Spepae EmemE ee eee TYPICAL CONFIGURATION z T 7 T z 1 3 * z T zl T 2 T 3 L 7 i 6 I 5 + 4 3 i z 1 MISCELLANEOUS LINE SYMBOLS SYMBOLS NOTES PROCESS LINES 1. MH PRESSURE FLOW RATE THROUGH PRESSURE EXCHANGERS SHOULD evans > Belts Gshe MO ote 9 el MESURE ow COMME sae wer uses Peewee wate nes Nive Oh oRCOAON PO 2 Asia PSEEE QO Poor FLOW MATE AY 8 vA « JBUSTGLE BY pce hv NE T0 MAN HP PAP 2 WER LMS fal wes lf coon 10 Kee soe ec {Ho leans ras OF BOLOGeM Gown Suan Exo SMibomt Se sar wo Sts sets WS WA (BREROY RECOVERY _ ‘FLOW ARROW “4, -A-FLOW METER IS REQUIRED ON THE PX SYSTEM HP IN UNE OR PX VALVES AND CONTROL — tone tow Jct ao Ine aoa oe tre We SACHA FP a VALVES Hones ov me won ou UNE ss Bstine Swiss Ao ler VANES sou 2 WSTALED Mc ESSE to Lon Ret Pomron oF SEA Ae EOURED SE orucle Srey SMOMS FA UPI LE L INSTALLED IT SHOULD BE INSTALLED IN THE LP IN LINE. et — ey vat ABSp sr vate Q AN OeTiONAL HH PRESSURE 8Y=PA85 VALVE MaY-BE APPLIED AT THE asso. reac Curr of Te Ro wows Tor Mtn. MO/oe ATUAT wocaor on ste [VED ae oxo atSconton ah ePeogeON ae OF 0 Show, "anepar tt on ved ¢ 1 ‘yon wt CB US A Se OTS ek MLTR UT AE em we YA] even mse ‘ous see SOC NasGt BOD) MO ef * _ Q 8. ved ST PND Oa A ANTS SUL Be ry OLED AT HE HERS rob THE Px SEM PRESSURE M) ne carmose mime INLE"/o PPG AND LOW PRESSURE UCT PING TO FACLITATE an vet Ya M Parcs Gente rege now sae 10 wens fi, Rite Saute Ne a ted EE ovens oP Reuse {uive vit 1 TPA BUT SATIN CAUSE SASRED BY OTE al MEANS). INSTRUMENTATIONILOGIC/FUNCTION COMPONENT 11, Hor bog ca ae epaccn wy cRCUATON Poe OTR 1 fe atnstcatute MONE Heim AAR 0 A TO. SYMBOLS IDENTIFICATION 13, TMS PRD IS FOR CONCEPT ONLY. 1 fap Moe roman doo sine sre ro em poset wy ESWATE/eWER VANE NUE soso OF coc EXERT ECVE Me (0) RN ok Me va. BUNT cl Sete wt COWL AED PAP GF RESEND FED 2 gene maa Fars For MP Pes 8 ‘5 ‘FULL FLOW CLEANING LOOP VALVE Ye MMU a SE We Lona cao AE 7 pxvaea ts hau bw coxtac Ate Wo Sou FoF Sr cue wae Yo ew ae wt Bluow ye So SIA Statens | Bi MESURE, MAN WP Pu et Pe RESURE NOEATOR MENDES Mow Pesan A HESUne NDEAOR PC Ste Lov PSS Pfc esiee Cacia Re PMA en resi TOM A Mo Metra Pe HOW MERE Mek oe kT PE FLOW EME x tte HP OULET (EE NTE 8) Bl Ho Mes tae a mt euroouté paar a [are = ‘sae ERI) ENERGY RECOVERY INC. LEGEND SHEET Soe rnsesaoRSmT —— 7 au PX SYSTEM INSTALLATION [OPED ES FEUER = = gy Ne So en th snare, o[ woes [2 Bourg iste we eaten men Fee, TYPICAL CONFIGURATION ae Tae @ T 7 T g T A t 7 T 5 T z T 7

You might also like