Estimasi Anggaran Biaya Perbaikan STP

NO URAIAN PEKERJAAN QTY UNIT HARGA SATUAN RP TOTAL


1 Submersible Ebara 50 DVS 51.5 1 Set 15,910,000 15,910,000
2 Exhaust Fan CKE FA-50 1 Set 2,567,000 2,567,000
3 Motor Blower FuTsu TB 50 1 Set 28,500,000 28,500,000
4 Floating Switch 5 Meter 2 Set 150,000 300,000
5 Casual 2 orang @150 ribu 2 Hari 300,000 600,000
Total Pekerjaan 47,877,000

NB :

Term Of Payment :

Prepared By,

Christofer Mangindaan
Chief Engineering