You are on page 1of 3

Minera y Metalurgica del Boleo S.A. de C.V.

Status date: 08-FEB-2013


BOLEO PROJECT Contract: 00007351
Sta. Rosalía, BCS

TAG COVER SHEET


_____________________________________________________________________________________________
Date Received: 07-FEB-2013
Supplier: Man Diesel
Document Title: ENGINEERING FLOW DIAGRAM STANDARD SYMBOLS

Supplier Doc. No.: B2-52-P-PD-I-001 Sheet: Rev:


BOLEO PROJECT
ICA FLUOR Cont'l No.:
4-0303-01-00002-3

Equip/Tag: Equip/Tag: Equip/Tag: Equip/Tag: Equip/Tag:


52-GN-003 52-GN-002 52-GN-001 52-BV-002
SYSTEM GROUP
DESCRIPTION NUMBER
RANGE

APPROVED
FOR CONSTRUCTION

ENGINEERING FLOW DIAGRAM STANDARD


SYMBOLS

9591 008-001
ENGINEERING FLOW DIAGRAM STANDARD
SYMBOLS

9591 008-001

You might also like