You are on page 1of 1

PFFP 

Material Dispatched Details Sep. ‐ 2020
Sr. no. Date Material Description Weight in KG Weight In MT Remarks
1 18.09.2020 PFFP Structure 7920 7.92
2 23.09.2020 PFFP Structure & PFFP Pipe Spools ‐ Lot 01 13850 13.85
3 29.09.2020 PFFP Pipe Spools Lot‐02 4260 4.26
4 29.09.2020 PFFP Pipe Spools Lot‐03 8380 8.38
Total Weight 34410 34.41

PFFP Material Dispatched Details Oct. ‐ 2020
Sr. no. Date Material Description Weight in KG Weight In MT Remarks
Inspection Done On Date:‐ 06.10.2020, 
1 06.10.2020 PFFP Structure ( HandRail, Instruments Supports) 4000 ‐ 5000 Approx. 4 ‐ 5 Wrapping Of Material In process.

2 06.10.2020 PFFP Structure Balanced Qty. 06 Beam 1000 ‐ 1500 Approx. 1 ‐ 1.5 Balance as per instructions


Balance Due To crossing Height in 
3 06.10.2020 PFFP Pipe Spools Balanced Qty. 04  1500 approx. 1.5 Transporting Vehical.
Total Weight  5000 ‐ 7000 Approx. 5 ‐7 Approx.

You might also like