Technical Query for Pitch Handling and Storage at GEP Are


S.N. NTL Query

All interconnecting pipelines within compressed air station’s


1 battery limit shall remain under Tenderer’s scope of supply (page
No.12 of 241 of PDF), we are unable to understand, please clarify.

Which type of spillage pit shall be considered (i.e. RCC with tiles
or carbon steel tank with 2 m3 capacity is sufficient)? Is thermic
2 fluid heating is required? After spillage the pitch material will not
solidify or how the fluidity from floor to tank. Pit operation shall
consider manually or automatic based on level.

3 What kind of moisture separators is required on tank?

Do we require control system in the thermic fluid line to maintain


4 constant temp. of vessel/tank or with constant temperature of
thermic fluid system continuously flow through tank coils.

What kind of fire hydrant system should be considered in the


5 HOB and Pitch Area, Dry or wet?

6 What is stand for HOB system…is it Thermic fluid system?

7 Please provide HOB system specification.

8 Please provide of Pitch buffer tank specification.


9 What is the purpose of return pump?

10 What will be the equipment MOC?

11 What will be the MOC of pitch handling pipe lines?

12 What will be LDO tank specification?

13 Two HOB systems shown in layout, please clarify?

14 Two stack shown in the layout? Please explain?


6 nos. pitch pump shown in layout and in Flow diagram, it is 5
15 nos. (2 nos. Pitch transfer pumps, 2 nos. Pitch unloading pumps, 1
nos. pitch return pump) please clarify?

Please explain wet dust/fume collection system, how far is this


installation i.e. scrubber? Or we need to install if yes then what
16 kind of scrubber is require for this system. As per flow diagram
some gases is coming from Erich mixer, what will be the quantity
and composition?

What will be the physical properties of Pitch fluid like specific


17
heat to select the thermic fluid system?
What will be solid pitch physical properties like particle size, bulk
18
density etc.?
19 What will be EOT capacity?

As per flow diagram limpet coil shown on pitch metler vessel,


20
pitch storage tank and jacket on buffer tank. Please confirm.

Client to provide all battery limit co-ordinate/battery limit point.


21 Are utilities will provide with isolation valve at battery limit or we
need to consider it.
Material & Energy balance with temp. & pressure shall be
22
provided by client
23 Please provide all utilities specification.
Commissioning and running spares to be provided for two (2)
24 years normal working of each equipment as recommended by
manufacturer.

Consumable, chemicals and other free issue materials like water,


25 Erection power supply etc. will be provided by the client at
battery limit of project to NTL. Client to confirm.
26 Civil work is not in our scope of NTL, Please confirm.

Type of Electrical switch gear selection for PMCC panel &


27 distribution panel will finalised during detailed engineering
protection shall be comply as per tender specification.

All junction and motor control boxes shall be flame proof as per
28 electrical Indian standard codes.

Level transmitters shall be Radar type intrinsically safety not


29 consideration of explosion proof for pitch storage tanks, pitch
melting vessels and buffer tank. Please confirm
DOC. NO. : NTL-PROP-TQ1-1039 Rev.00
Date : 11.07.2021
PREP BY : SS
CHKD BY : NNS
APPVD BY : NNS

Handling and Storage at GEP Area


Client Reply

Instead of Compressed Air Station, it is to be read as pitch handling


and storage premises . However, thermic fluid lines are not in scope
of this vendor

Further discussion is necessary .

This is vendor's discretion

Thermic fluid line is out of scope of this tender. However , the vendor
may check further from site conditions .

This is vendor's discretion . However, vendor may check from site


conditions .

HOB is part of Thermic Fluid system. It is out of scope of this tender

HOB is part of Thermic Fluid system. It is out of scope of this tender

GA drgs will be provided shortly


Question not clear
GA drgs of all equipment will be provided. However, tenderer may
check from site conditions
Tenderer may check General specification . He may also check
existing site conditions
LDO tank is out of scope for this tender
HOB system is part of Thermic fluid package and is out of scope for
this tender
The stacks are for HOB and thermic fluid system, not in the scope of
this package
Please follow flow diagram

Dust collection/ fume extraction is out of scope of this tender

Thermic fluid system is out of scope of this tender

Please follow the tender spec


EOT will be supplied separately, not by this vendor

Further discussion is necessary .

All utilities will be provided at Battery Limits


Question not clear

Question not clear

ok

ok, confirmed
Civil work, is out of scope of this tender

Tenderer to follow spec.

ok

Tenderer to follow spec.