AS PLANNED DRAWING

BAKTI - LTE 4G PROJECT

SITE ID : MLA00204

SITE NAME : ONA

TOWER HEIGHT : GUYED MAST TUBULAR 32M

ADDRESS : ONA, SULABESI BARAT, KEPULAUAN SULA,


MALUKU UTARA

COORDINATE : LONG : 125.88391


LAT : -2.15055
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

SITE MAP LOCATION


Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

01
LEGEND

W E

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

SITE LAYOUT
Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

02
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

CIVIL WORK GENERAL DRAWING


Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

03
LEGEND
600
24
68 92.8 92.8 92.8 92.8 92.8 68

100

120
50
600 600 600 20-D16

BOTTOM BAR D16-200


∅10-150

1000
PENGIKAT ANGKUR
600
TOP BAR D16-200

600
500
∅10-150
A A
- -

BOTTOM BAR D16-200


TOP BAR D16-200
120 COLOR CODE

1800
600

50
SECTION B
SCALE : NTS -

BAR BENDING SCHEDULE Keterangan


600

4-D16(spacer) Note

1800

FOUNDATION LAYOUT (MAST SUPPORT) BAKTI


SCALE NTS

600 600 600

B EL.(+) 0.30
-
300

20-D16
∅10-150 EL.(±) 0.00 Tanggal
Date

COMPACTED COMPACTED
BACKFILL SOIL BACKFILL SOIL DRAWING APPROVAL
KEMITRAAN APPROVE
600

D16-200
1300

PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

SPASER
4-D16
Tanggal Tanggal
Date Date
400

EL.(-) 1.00
50
100

LEAN CONCRETE GUYED MAST TUBULAR 32M


1800 50mm
Nama Proyek
COMPACTED SAND Project Name
100mm BAKTI - LTE 4G
SECTION A
SCALE : NTS - NOTE : Nama Gambar
Drawing Name
Qc = 10 kg/cm2
TOWER FOUNDATION DETAIL (MAIN TOWER)
Depth of foundation excavation = 1m
Site name Site ID
Reinforcement shall be use : Site Nama Site ID

Deformed bar : Fy = 390 MPa ONA MLA00204


Fu = 560 MPa Kordinat Hub Revisi
Coordinated Hub Revision
Plain bar : Fy = 235 MPa
Fu = 380 MPa
Concrete shall be use : Ref. Peta
Map Ref.
No. Gambar
Drawing No.
K-225 (Characteristic Compressive Strength = 225 kg/cm²)
f 'c = 18.675 MPa
Arah Skala
Direction
N Scale

Please use the proper method during construction 1:100


according to correct standard Halaman
Page
All dimension are in mm 04
600 LEGEND
68 92.8 92.8 92.8 92.8 92.8 68
800 600 800
200

50
M24
20-D16

100
A A

120
- - ∅10-200
PENGIKAT ANGKUR

1000
800

600
500
∅10-200

100

50
2200
600

SECTION B COLOR CODE

SCALE : NTS -

BAR BENDING SCHEDULE


800

Keterangan
Note

2200
FOUNDATION LAYOUT (GUYED SUPPORT)
SCALE NTS
BAKTI

800 600 800

Tanggal
Date

DRAWING APPROVAL
B EL.(+) 0.30 KEMITRAAN APPROVE

- PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI


300

20-D16
∅10-200 EL.(±) 0.00
COMPACTED COMPACTED
Tanggal Tanggal
BACKFILL SOIL BACKFILL SOIL Date Date
600

D16-200
1300

SPASER
8-D16
GUYED MAST TUBULAR 32M
400

Nama Proyek
Project Name
BAKTI - LTE 4G
EL.(-) 1.00 NOTE :
10050

Nama Gambar
Qc = 10 kg/cm2 Drawing Name

LEAN CONCRETE Depth of foundation excavation = 1m TOWER FOUNDATION DETAIL (SLING TOWER)
2200 50mm Reinforcement shall be use : Site name Site ID
Site Nama Site ID
COMPACTED SAND Deformed bar : Fy = 390 MPa
SECTION A 100mm ONA MLA00204
SCALE : NTS - Fu = 560 MPa
Kordinat Hub Revisi
Plain bar : Fy = 235 MPa Coordinated Hub Revision

Fu = 380 MPa
Concrete shall be use : Ref. Peta No. Gambar
Map Ref. Drawing No.
K-225 (Characteristic Compressive Strength = 225 kg/cm²)
f 'c = 18.675 MPa
Arah Skala

Please use the proper method during construction


Direction
N Scale

1:100
according to correct standard
Halaman

All dimension are in mm Page

05
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

SINGLE LINE DIAGRAM


Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

06
LEGEND

2 mm TYP 5°
105 PL12*170
450 10

12
1 1

80
106 PL8*50 106 PL8*50

3 0°
DET A
500

102 RB Ø19 107 PL8*80
PLAT. BEND

18
75X45X 2mm

7.5
107 PL8*80 COLOR CODE

60°

75
103 RB Ø16
104 RB Ø19
500

18
105 PL12*170

7.5
4*D18 Keterangan
Note
50
R.2 6 4*D18
ADDITIONAL TRAY VERTICAL 15

6
1 - 1
500

15
80

20
450 6
BAKTI
2 2
120 15
DET B

60
170
60
3500

DETAIL - 106

°
500

PLAT. BEND DETAIL - A
18

75X45X 2mm DETAIL - 105
1:5
7.5

390
75

297 Tanggal
Date
18

DRAWING APPROVAL
7.5
500

KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI
6

200
R.2 2 - 2
ADDITIONAL TRAY VERTICAL
Tanggal Tanggal
290 Date Date

Cha 20*45°
500

R 60
33 232 32
GUYED MAST TUBULAR 32M
30°

DETAIL B
1:5 DETAIL - 110
Nama Proyek
Project Name
108 RB Ø19 BAKTI - LTE 4G
Nama Gambar

2 mm TYP 1*D28 Drawing Name


29
500

SECTION 1
0

110 PL10*200
200

Site name Site ID


Site Nama Site ID

3 3 for pipe 2'' ONA MLA00204


20

Kordinat Hub Revisi


290 3 - 3 Coordinated Hub Revision

410 109 PL20*371
Ref. Peta No. Gambar
Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

07
LEGEND

2 mm TYP
205 PL12*170 TOP - 450 50
80 12

4*D18 15

15
206 PL8*50
1 1

20

80
540
408

FP/2 PL10*100 120
15
FP/3 PL14*120 170
DETAIL 206 COLOR CODE
DETAIL 205 1:5

1*D22

FP/1 PL10*100
494

DET C 206 PL8*50 205 PL12*170


4*D18 Keterangan
Note
207 PL8*80
6

6
°
30
PLAT. BEND
506

°
105
18
75X45X 2mm BAKTI
DET B
7.5
60°
75
3000

DETAIL A
2 2
18
DETAIL B
7

1:7.5
.5
500

Tanggal
Date
203 RB Ø16

R.2 1 - 1 DRAWING APPROVAL


ADDITIONAL TRAY VERTICAL KEMITRAAN APPROVE
A1 FP/3 PL14*120 FP/2 PL10*100A1 PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

14
50 70
450
Tanggal Tanggal

200
Date Date
500

204 RB Ø19

40

85

°
60
°
60

1*D22 GUYED MAST TUBULAR 32M


PLAT. BEND A1 - A1
18

75X45X 2mm FP/1 PL10*100 Nama Proyek


7

Project Name
.5

BAKTI - LTE 4G
DETAIL C
202 RB Ø19 60° 1:7.5 Nama Gambar
0
45

Drawing Name
408

75

SECTION 2
Site name Site ID
DET A Site Nama Site ID
18

206 PL8*50
ONA MLA00204
7.5
12 80

Kordinat Hub Revisi


Coordinated Hub Revision
1 205 PL12*170 1
2 mm TYP 2 - 2 Ref. Peta No. Gambar
R.2 Map Ref. Drawing No.
BOTTOM - 450
ADDITIONAL TRAY VERTICAL
Arah Skala
Direction
N Scale

1:100
Halaman
Page

08
LEGEND

DET A 2 mm TYP
450
205 PL12*170
80 12

1 1

206 PL8*50

206 PL8*50 205 PL12*170
4*D18
408

202 RB Ø19 207 PL8*80

COLOR CODE

°
30 PLAT. BEND °
105

18
75X45X 2mm

7.5
204 RB Ø19
500

60° 6 Keterangan

75

6
Note

18
7.5
203 RB Ø16
500

BAKTI

R.2 1 - 1

ADDITIONAL TRAY VERTICAL DETAIL A
DETAIL B
3000

2 2 1:7.5
450

DET B
500

Tanggal
Date
°
50
60

15 DRAWING APPROVAL
PLAT. BEND 4*D18
18

15
KEMITRAAN APPROVE
75X45X 2mm
7.5

PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

20

80
0
45
75

60°
120 Tanggal Tanggal
500

Date Date

15
18
7.5

170
DETAIL 206
DETAIL 205 1:5
GUYED MAST TUBULAR 32M
2 - 2
Nama Proyek
202 RB Ø19 R.2 Project Name
BAKTI - LTE 4G
ADDITIONAL TRAY VERTICAL
408

Nama Gambar
Drawing Name
207 PL8*80
SECTION 3
Site name Site ID
1 206 PL8*50 1 Site Nama Site ID
12 80

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision
205 PL12*170
2 mm TYP
450
Ref. Peta No. Gambar
Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

09
LEGEND

2 mm TYP
205 PL12*170 TOP - 450
80 12 50
4*D18 15

15
206 PL8*50
1 1

20

80
540
FP/2 PL10*100
408

120
15
FP/3 PL14*120 170
DETAIL 206
DETAIL 205 1:5 COLOR CODE

1*D22

FP/1 PL10*100
494

DET C 206 PL8*50 205 PL12*170


4*D18
207 PL8*80 Keterangan
Note
6

6
°
30
PLAT. BEND °
105

18
75X45X 2mm
506

DET B

7.5
BAKTI

60°
75
3000

DETAIL A
2 2 18 DETAIL B
7.5
1:7.5
500

203 RB Ø16 Tanggal
Date

R.2 1 - 1
ADDITIONAL TRAY VERTICAL DRAWING APPROVAL
A1 FP/3 PL14*120 FP/2 PL10*100A1 KEMITRAAN APPROVE

14
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

50 70
450

200
500

204 RB Ø19 Tanggal Tanggal

40
Date Date

85

°
60
°
60

1*D22
PLAT. BEND A1 - A1 GUYED MAST TUBULAR 32M
18

75X45X 2mm FP/1 PL10*100
7.5

Nama Proyek
DETAIL C Project Name
202 RB Ø19
408

BAKTI - LTE 4G
60° 1:7.5
0
45
75

Nama Gambar
Drawing Name

DET A SECTION 4
18

206 PL8*50 Site name Site ID


7.5

Site Nama Site ID


12 80

ONA MLA00204

1 205 PL12*170 1 Kordinat Hub Revisi


Coordinated Hub Revision
2 mm TYP 2 - 2
BOTTOM - 450 R.2 Ref. Peta No. Gambar
Map Ref. Drawing No.
ADDITIONAL TRAY VERTICAL
Arah Skala
Direction
N Scale

1:100
Halaman
Page

10
LEGEND

DET A 2 mm TYP
450
205 PL12*170
80 12

1 1

206 PL8*50

206 PL8*50 205 PL12*170
4*D18
408

202 RB Ø19 207 PL8*80

COLOR CODE

°
30
PLAT. BEND °
105

18
75X45X 2mm

7.5
204 RB Ø19
500

60° 6

75
Keterangan

6
Note

18
7.5
203 RB Ø16
500

BAKTI
R.2 1 - 1
ADDITIONAL TRAY VERTICAL
DETAIL A
DETAIL B
3000

2 2 1:7.5
450

DET B
500

Tanggal
Date
°
50
60

PLAT. BEND 4*D18 15 DRAWING APPROVAL

15
18

75X45X 2mm KEMITRAAN APPROVE


7.5

PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

20

80
0
45
75

60°
120
500

Tanggal Tanggal
Date Date
15
18
7.5

170
DETAIL 206
DETAIL 205 1:5
GUYED MAST TUBULAR 32M
2 - 2
202 RB Ø19 R.2 Nama Proyek
Project Name
ADDITIONAL TRAY VERTICAL BAKTI - LTE 4G
408

Nama Gambar
207 PL8*80 Drawing Name

SECTION 5
1 206 PL8*50 1 Site name Site ID
Site Nama Site ID
12 80

ONA MLA00204
Kordinat Hub Revisi
205 PL12*170 Coordinated Hub Revision
2 mm TYP
450
Ref. Peta No. Gambar
Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

11
LEGEND

2 mm TYP
205 PL12*170 TOP - 450 50
80 12

4*D18 15

15
206 PL8*50
1 1

20

80
408

540
FP/2 PL10*100 120
15
FP/3 PL14*120 170
DETAIL 206 COLOR CODE
DETAIL 205 1:5

1*D22

FP/1 PL10*100
494

DET C 206 PL8*50 205 PL12*170


4*D18
Keterangan
207 PL8*80 Note

6
°
30
506

PLAT. BEND °
105
18
75X45X 2mm
DET B

7.5
BAKTI

60°
75
3000

2 2
18 DETAIL A
7.5 DETAIL B
1:7.5
500

203 RB Ø16
Tanggal
Date

R.2 1 - 1
ADDITIONAL TRAY VERTICAL DRAWING APPROVAL
A1 FP/3 PL14*120 FP/2 PL10*100A1
APPROVE

14
KEMITRAAN
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

50 70
450

200
500

204 RB Ø19

40
Tanggal Tanggal
Date Date

85

°
60
°
60

1*D22
PLAT. BEND A1 - A1
18

75X45X 2mm FP/1 PL10*100 GUYED MAST TUBULAR 32M


7.5

DETAIL C
202 RB Ø19 Nama Proyek
408

60° 1:7.5
0

Project Name
45

BAKTI - LTE 4G
75

Nama Gambar
Drawing Name
DET A
18

206 PL8*50 SECTION 6
7.5
12 80

Site name Site ID


Site Nama Site ID

1 205 PL12*170 1 ONA MLA00204


2 mm TYP 2 - 2 Kordinat Hub Revisi
Coordinated Hub Revision

BOTTOM - 450 R.2
ADDITIONAL TRAY VERTICAL Ref. Peta No. Gambar
Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

12
LEGEND

DET A 2 mm TYP
450
205 PL12*170
80 12

1 1

206 PL8*50

206 PL8*50 205 PL12*170
4*D18
408

202 RB Ø19 207 PL8*80
COLOR CODE

°
30 PLAT. BEND °
105

18
75X45X 2mm

7.5
204 RB Ø19
500

60° 6 Keterangan

75
Note

6
18
7.5
203 RB Ø16
500

BAKTI
R.2 1 - 1
ADDITIONAL TRAY VERTICAL
DETAIL A
DETAIL B
3000

2 2 1:7.5
450

DET B
500

Tanggal
Date
°
50
60

PLAT. BEND 4*D18 15 DRAWING APPROVAL

15
18

75X45X 2mm APPROVE
7.5

KEMITRAAN
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

20

80
0
45
75

60°
120
500

Tanggal Tanggal

15 Date Date
18
7.5

170
DETAIL 206
DETAIL 205 1:5

2 - 2 GUYED MAST TUBULAR 32M


202 RB Ø19 R.2
Nama Proyek
ADDITIONAL TRAY VERTICAL Project Name
408

BAKTI - LTE 4G

207 PL8*80 Nama Gambar


Drawing Name

1 206 PL8*50 1 SECTION 7
Site name Site ID
12 80

Site Nama Site ID

ONA MLA00204
205 PL12*170 Kordinat Hub Revisi
450 2 mm TYP Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

13
LEGEND

2 mm TYP
205 PL12*170 TOP - 450 50
80 12

4*D18 15

15
206 PL8*50
1 1

20

80
540
FP/2 PL10*100
408

120
15
FP/3 PL14*120 170 COLOR CODE
DETAIL 206
DETAIL 205 1:5

1*D22

FP/1 PL10*100
494

DET C 206 PL8*50 205 PL12*170 Keterangan


4*D18 Note

207 PL8*80
6

6
°
30 PLAT. BEND
506

° BAKTI
DET B
18
7.5
75X45X 2mm 105

60°
75
3000

DETAIL A
2 2
18

DETAIL B
7.5

1:7.5
500

Tanggal
Date

203 RB Ø16
R.2 1 - 1 DRAWING APPROVAL
KEMITRAAN APPROVE
ADDITIONAL TRAY VERTICAL PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI
A1 FP/3 PL14*120 FP/2 PL10*100A1

14
50 70
450

200
Tanggal Tanggal
Date Date
500

204 RB Ø19

40

85

°
60
°
60

GUYED MAST TUBULAR 32M


1*D22
PLAT. BEND A1 - A1
18

75X45X 2mm FP/1 PL10*100 Nama Proyek


7.5

Project Name
BAKTI - LTE 4G
DETAIL C
408

202 RB Ø19 60° 1:7.5 Nama Gambar


0

Drawing Name
45
75

SECTION 8
Site name Site ID
DET A Site Nama Site ID
18

206 PL8*50
ONA MLA00204
7.5
12 80

Kordinat Hub Revisi


Coordinated Hub Revision
1 205 PL12*170 1
2 mm TYP 2 - 2
R.2 Ref. Peta
Map Ref.
No. Gambar
Drawing No.
BOTTOM - 450 ADDITIONAL TRAY VERTICAL
Arah Skala
Direction
N Scale

1:100
Halaman
Page

14
LEGEND

DET A 2 mm TYP
450
205 PL12*170
80 12

1 1

206 PL8*50

206 PL8*50 205 PL12*170
4*D18
408

202 RB Ø19 207 PL8*80

COLOR CODE

°
30
PLAT. BEND °

18
75X45X 2mm 105

7.5
204 RB Ø19
500

60° 6

75

6
Keterangan
Note

18
7.5
203 RB Ø16
500

R.2 1 - 1 BAKTI


ADDITIONAL TRAY VERTICAL DETAIL A
DETAIL B
3000

2 2 1:7.5
450

DET B
500

° 50
60
Tanggal
Date

PLAT. BEND 4*D18 15

15
18

75X45X 2mm
7.5

DRAWING APPROVAL
KEMITRAAN APPROVE

20

80
0
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

45
75

60°
120
500

15
18
7.5

170 Tanggal
Date
Tanggal
Date
DETAIL 206
DETAIL 205 1:5

R.2 2 - 2
202 RB Ø19 ADDITIONAL TRAY VERTICAL GUYED MAST TUBULAR 32M
408

Nama Proyek
Project Name
207 PL8*80 BAKTI - LTE 4G

1 206 PL8*50 1 Nama Gambar


Drawing Name
12 80

SECTION 9
Site name Site ID
Site Nama Site ID
205 PL12*170
2 mm TYP ONA MLA00204
450
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

15
LEGEND

perubahan posisi assy 50
2 mm TYP
305 PL12*170 TOP - 450 R.1 rounbar 4*D18 15

15
80 12

20
306 PL8*50 1

80
1

540
408

120
15
170
DETAIL 306 COLOR CODE
1*D22 DETAIL 305 1:5
500

DET C

306 PL8*50 305 PL12*170
4*D18
Keterangan
500

307 PL8*80 Note

6
6

°
30
PLAT. BEND °

18
sambungan welding
105
500

75X45X 2mm

7.5
2 mm TYP BAKTI
60°

75
2 2
R.2
3485

4500
500

ADDITIONAL TRAY VERTICAL
18
7.5 DETAIL A
DETAIL B
1:7.5
Tanggal
Date
500

DET B 1 - 1
304 RB Ø19
DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI
A1 FP/3 PL14*120 FP/2 PL10*100A1

14
303 RB Ø16 450

50 70
500

Tanggal Tanggal

200
Date Date

85
°
60

°
60
40
500

PLAT. BEND GUYED MAST TUBULAR 32M


18

FP/2 PL10*100 75X45X 2mm
7.5

FP/3 PL14*120 1*D22 FP/1 PL10*100 A1 - A1 Nama Proyek


Project Name
60° BAKTI - LTE 4G
0

DETAIL C
45
75

FP/1 PL10*100 1:7.5 Nama Gambar


408

Drawing Name
302 RB Ø19
475

SECTION 10
18

DET A Site name Site ID


7.5

306 PL8*50 Site Nama Site ID


12 80

ONA MLA00204
1 305 PL12*170 1 Kordinat Hub Revisi
Coordinated Hub Revision
2 mm TYP 2 - 2
R.2
BOTTOM - 450 Ref. Peta No. Gambar
ADDITIONAL TRAY VERTICAL Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

16
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

SPLITZEN MOUNTING BRACKET


Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

17
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

OBL MOUNTING BRACKET


Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

18
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

STAYGUY BRACKET
Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

19
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name GUYED MAST 32M
GUY WIRE FITTINGS
Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

19A
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

ANTENNA MOUNTING BRACKET


Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

20
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

RRU MOUNTING BRACKET


Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

21
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

GPS MOUNTING BRACKET


Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

22
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

DC CABINET FOUNDATION
Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

23
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
VSAT FOUNDATION
Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

24
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
VSAT FOUNDATION
Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

25
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
VSAT FOUNDATION
Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

26
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

BARBENDING VSAT FOUNDATION


Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

27
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

FENCE FOUNDATION
Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

28
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
FENCE FOUNDATION DETAIL
Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

29
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

BARBENDING SCHEDULE FENCE


Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

30
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
DOOR DETAIL
Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

31
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name
FENCE SIDE VIEW
Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

32
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

YARD LAMP
Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

33
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

GROUNDING CONTROL BOX


Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

34
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

GROUNDING SYSTEM LAYOUT


Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

35
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

GROUNDING DETAIL
Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

36
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

ACPDB PANEL
Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

37
LEGEND

COLOR CODE

CABLE DUCT 35 X 45

Keterangan
Note

CABLE DUCT 35 X 45
CABLE DUCT 35 X 45

BAKTI

CABLE DUCT 35 X 45

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

ACPDB PANEL
Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

38
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

ACPDB WIRING DIAGRAM


Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

39
LEGEND

N T S R T S R N KWH METER
2 1 PLN

GENSET PLN

CABLE DUCT 40 x 40
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

KWH METER
PLN Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

KWH PANEL
Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

40
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

KWH WIRING DIAGRAM


Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

41
LEGEND

OBL Lamp Lightning Rod

32 m
450

NO Deskripsi Unit Jumlah Dimensi (L*W*H) Keterangan

1 Kamera Set 2

2 NVR Set 1

3 Lampu Taman Set 1

4 OBL Lamp Set 1


COLOR CODE
5 GPS Set 1

Remarks:
1. Pemancar luar ruangan terdiri dari 2 kamera pengintai dan 1 perangkat NVR.
Sebuah kamera akan digunakan untuk memantau kabinet stasiun BTS,
memantau status peralatan dan anti-pencurian
Kamera lain akan digunakan untuk memantau lingkungan sekitar stasiun BTS Keterangan
posisi pemasangan ditentukan sekitar 3-5 meter di atas permukaan tanah. Note

2. Lampu Penjaga ditenagai oleh panel surya produk itu sendiri .

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Camera 1
Mengawasi Sekitar Pagar &
Pintu Masuk
Tanggal Tanggal
Yard Lamp Date Date

6m
GPS
5m
Camera 2
Sudut Pandang Kamera pada Perangkat GUYED MAST TUBULAR 32M
4m
Nama Proyek
Project Name
3m BAKTI - LTE 4G
Nama Gambar
Fence ACPDB PAGAR Drawing Name

OBL Panel R S T
CCTV LAYOUT
Cabinet Site name Site ID
X

X
X

X
X

X
X

Site Nama Site ID


X

X
X

X
X

ONA MLA00204
X

X
X

X
X

0m
X

X
X

Kordinat Hub Revisi


Coordinated Hub Revision

CCTV Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

42
LEGEND

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PT.FIBERHOME, TELKOM INFRA, MTD PMO BAKTI

Solar Solar
Controller Battery
Tanggal Tanggal
Date Date

DCPD
SWITCH
NVR GUYED MAST TUBULAR 32M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

CABLE TRAY
Site name Site ID
Site Nama Site ID

ONA MLA00204
Kordinat Hub Revisi
Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction
N Scale

1:100
Halaman
Page

43