Annual Implementation Programme 2021 - (Provincial Fund (PSDG))


EPC
Ministry : Ministry of Agriculture and Irrigation
Agency : Dept. of Irrigation (Dept of Irrigation)
Month : August Rs ,000
Code Allo. Project Cum.Exp
Activity Description DS Division Status TCE Phy. Pro.
No Current Year Cost. Current Year

District : Trincomalee

Priority Component 1:.Improving the availability of irrigation water for agriculture


Strengthening of Tank bund including rip-rap
21/T/01 protection chainage from 0+100 - 0+363 and 0+395 - Kuchchaveli New 8,500 8,500 8,400 0 Ongoing 25%
0+425 at Neelapanikan Irrigation scheme
Strengthening of Tank bund including rip-rap
21/T/02 protection chainage from 0+900- 1+200 at Kuchchaveli New 8,000 8,000 7,800 0 Ongoing 25%
Periyakulam irrigation scheme
Strengthening of Tank bund including rip-rap
21/T/03 protection chainage from 0+000 to 0+320 and 0+800- Kuchchaveli New 8,000 8,000 7,800 0 Ongoing 25%
1+000 at Periyaelumpuruki irrigation scheme
Strengthening of Tank bund including rip- rap
21/T/04 protection chainage from 0+330 to 0+600 at Kinniya New 12,500 12,500 12,400 2,253 Ongoing 25%
Kurankupanchan Irrigation scheme
Strengthening of Tank bund including rip-rap
21/T/05 protection chainage from 0+780 to 1+550 at Gomarankadawela New 25,000 25,000 24,800 0 Ongoing 25%
Mahakalampattu Irrigation scheme
Improvements to main channel from 2+600m to
21/T/06 Kuchchaveli New 5,000 5,000 4,800 0 Ongoing 25%
5+400 m at Neelapanikan irrigation scheme
Sub Total 67,000 67,000 66,000 2,253

Priority Component 2:.Capacity development


Conducting Training Programmes for farmers &
21/T/07 All DS Division New 300 300 280 27 Ongoing 75%
Irrigation relevant staff
Sub Total 300 300 280 27

District Total 67,300 67,300 66,280 2,280

District : Batticaloa

Priority Component 1:.Improving the availability of irrigation water for agriculture


Construction of Salt Water Exclusion Bund chainage
from 0+000m to 1+500m including construction of
21/B/01 Vellavely New 3,718 3,718 3,718 0 Awarded
drainage outlets structures at Palugamam
Periyakulam
Strengthening of Tank Bund (D/S) and widening of
21/B/02 Kiran New 6,613 6,613 6,613 0 Ongoing 75%
Co spill from 0+000m to 1+000m of Tharavai Tank
Construction of New LB Tower Sluice at 0+215 m
21/B/03 and strengthening of tank bund at Kirimichaiodai Vaharai New 7,756 7,756 7,756 0 Ongoing 25%
Tank
Construction and Strengthening the upstream
Manalpitty Anicut, Construction at downstream
21/B/04 Sinnachchenai Anicut and Concrete from 0+120m to Paddipalai New 7,889 7,889 7,889 0 Awarded
0+220 at RB of Sinnachchenai Anicut at Pulugunawi
scheme
Construction of Retaining wall at Pathirakal anicut
and Construction of Retaining wall at
21/B/05 Vavunativu New 6,601 6,601 6,601 0 Awarded
Periyakalapoddamadu kilal anicut at Adachchakal
scheme
Construction of Retaining wall, Concrete lining and
21/B/06 Down stream secondary cushion and plank bund of Kiran New 5,208 5,208 5,208 0 Awarded
Aliyaodai anicut at Meiyankal Scheme

1 of 3 18/08/2021, 10:41
CAIP Report View https://dataepc.lk/CAIP/caip_reportview.php?tcinsid=0&tyear=2021&ts...

Code Allo. Project Cum.Exp


Activity Description DS Division Status TCE Phy. Pro.
No Current Year Cost. Current Year
Construction of concrete lining of Panichchayady
Anicut and Construction of concrete lining (chainage
21/B/07 Paddipalai New 6,960 6,960 6,960 4,941 Ongoing 75%
from 0+000m to 0+200m) at RB main channel of
Valavady Anicut at Pulugunawi scheme
Construction of 3 bay regulator at Chainage 1+300m
21/B/08 including retaining wall in Naatpathuveddai Main Paddipalai New 4,006 4,006 4,006 1,275 Ongoing 75%
Channel at Pulugunawi scheme
Construction of Vented Causeway at Chainage
21/B/09 0+448m of Thanthamalai main road in Mavadi Paddipalai New 4,518 4,518 4,518 0 Awarded
munmari kandam at Pulugunawi scheme
Construction of Valaikalai anicut (chainage from
0+075m to 0+135m) and Construction of Valaikalai
21/B/10 Paddipalai New 4,425 4,425 4,425 1,622 Ongoing 50%
Anicut to Thanthamalai Main Road at Pulugunawi
scheme
Construction of concrete and earthern channel of RB
21/B/11 main channel from 0+500 to 1+200m at Meiyankal Kiran New 4,605 4,605 4,605 2,189 Ongoing 50%
Scheme
Construction of concrete surfacing to access road
21/B/12 from Thantha junction to Pulugunawi tank (Chainage Paddipalai New 4,507 4,507 4,507 3,997 Ongoing 75%
from 0+000m to 0+500m) at Pulugunawi scheme
Construction of concrete surfacing to Kampipalam
road (Manalpitty junction to Kadukkamunai inlet
21/B/13 Paddipalai New 4,476 4,476 4,476 3,716 Ongoing 75%
channel) chainage from 0+000m to 1+800m at
Pulugunawi scheme
Construction of small Bridge across spill way of
21/B/14 Vaharai New 4,987 4,987 4,987 0 Ongoing 25%
Anaisuttakattu Tank
Strengthening the Radial Gated Spill Structure of
21/B/16 Pulugunawi and Kankaniyar kulam in Pulugunawi Paddipalai New 12,500 12,500 12,500 2,480 Ongoing 50%
Scheme
Sub Total 88,769 88,769 88,769 20,220

Priority Component 2:.Capacity development


Conducting Training Programmes for farmers &
21/B/15 All DS Division New 300 300 0 0 Prep.level
Irrigation relevant staff
Sub Total 300 300 0 0

District Total 89,069 89,069 88,769 20,220

District : Ampara

Priority Component 1:.Improving the availability of irrigation water for agriculture


Construction of retaining wall at Down stream of LB
21/A/01 (20m) & RB (20m) sides at Neendakarai Anicut at Sammanthurai New 5,000 5,000 4,901 0 Awarded
Chadayanthalawa Scheme
Reconstruction of Bismillah Anicut in Thonikkal
21/A/02 Alaiyadivembu New 15,000 15,000 14,985 0 Awarded
Scheme
Construction of concrete channel lining at D2 &
21/A/03 meegasthalawa channels at critical locations in Mahaoya New 5,000 5,000 4,904 0 Awarded
Boropola scheme
Construction of retaining wall in LB channel 0+000 -
0+015m and construction of concrete lining in RB
21/A/04 Padiyatalawa New 5,000 5,000 4,861 0 Awarded
channel 0+100 - 0+250 m and renovation of
Thalapitioya Anicut gate in Thalapity Oya scheme
Construction of 3 bays regulator at inlet channel (LB
21/A/05 end of tank bund) and Improvements of tank bund Alaiyadivembu New 15,000 15,000 13,997 0 Awarded
from 2+225m to 2+640m at Sagamam scheme
Improvements to Agriculture access Road and
21/A/06 Construction concrete lining to main channel in Lahugala New 5,000 5,000 4,996 0 Awarded
Naulla scheme
Construction of concrete lining channel in RB main
channel at 0+000 to 0+400 m and Construction of RB
21/A/07 Thirukovil New 19,400 19,400 0 0 Prep.level
Low level sluice in 3rd bund in Kanchikudicharu
Scheme
Construction of chenaikadu 1st kandam and
Construction ofThalaiviyar Vaikakal Palavarkka
21/A/08 Thirukovil New 5,000 5,000 4,278 0 Awarded
kandam and Construction of sellaiyah access road at
stn 0+090 m in Unavu porul kandam at Rufus

2 of 3 18/08/2021, 10:41
CAIP Report View https://dataepc.lk/CAIP/caip_reportview.php?tcinsid=0&tyear=2021&ts...

Code Allo. Project Cum.Exp


Activity Description DS Division Status TCE Phy. Pro.
No Current Year Cost. Current Year
Scheme
Construction of Weerathidal access road up to
21/A/09 Navithanvali New 17,500 17,500 16,220 0 Awarded
Weeramunai anicut (650m)
Sub Total 91,900 91,900 69,142 0

Priority Component 2:.Capacity development


Conducting Training Programmes for farmers &
21/A/10 All DS Division New 300 300 250 0 Awarded
Irrigation relevant staff
Sub Total 300 300 250 0

District Total 92,200 92,200 69,392 0

District : Head Office

Priority Component 2:.Capacity development


Conducting Training Programmes for farmers &
21/E/01 All Division New 800 800 0 0 Prep.level
Irrigation relevant staff
Sub Total 800 800 0 0

District Total 800 800 0 0

Total 249,369 249,369 224,441 22,500