You are on page 1of 2

CONSTRUCTION OF ROB ITS APPROACHES IN LIEU OF EXISTING LEVEL CROSSING AT GATE NO.

SK-192/ (E)
SL.NO. TITLE DWG. NO.
1 GAD ROB/B/6/2/2019
2 BEARING LAYOUT DRAWING ROB/B/6/17/2019
3 DETAILS OF BEARING FORCES ROB/B/6/18/2019
4 GENERAL NOTES FOR STEEL GIRDER ROB/B/6/19/2019
5 REINFORCEMENT DETAILS OF DECK SLAB ROB/B/6/16/2019
6 DETAIL OF END LIFTING BEAM AND INTERMEDIATE X-FRAME ROB/B/6/15/2019
7 DETAIL OF SPLICE JOINT AND STUD SHEAR CONNECTOR ROB/B/6/14/2019
8 DETAIL OF LONGITUDINAL GIRDER SHEET-1 ROB/B/6/13/2019
9 DETAIL OF LONGITUDINAL GIRDER SHEET-2 ROB/B/6/11/2019
10 REINFORCEMENT DETAIL OF SEISMIC STOPER ROB/B/6/12/2019
OSSING AT GATE NO. SK-192/ (E)SPL
DWG. NO.
18-27/CICS/NH31/ROB/615.500/101
18-27/CICS/NH31/ROB/615.500/212
18-27/CICS/NH31/ROB/615.500/305
18-27/CICS/NH31/ROB/615.500/306
18-27/CICS/NH31/ROB/615.500/304
18-27/CICS/NH31/ROB/615.500/303
18-27/CICS/NH31/ROB/615.500/302
18-27/CICS/NH31/ROB/615.500/301
18-27/CICS/NH31/ROB/615.500/301
18-27/CICS/NH31/ROB/615.500/211

You might also like