CBR -8 & MSA-2

TYPICAL CROSS SECTION IN FLEXIBLE PAVEMENT


From 0.000km To 0.800km = 0.800 km
Total = 0.800 km
2.5 m 3.5 m 3.5 m 2.5 m
SHOULDER PROPOSED C/L PROPOSED SHOULDER
2.5% 2.5% 2.5% 2.5%
Slo
n1 p
2i e2
pe in
Slo 1
BC 30mm
DBM 50mm
WMM 100mm
WMM 125mm
GSB 150mm
TYPICAL CROSS SECTION IN OPEN AREA (New-Construction Portion)