Professional Documents
Culture Documents
COMPETENCY STANDARD
(CICS)
CERTIFIED CONSTRUCTION
PROJECT MANAGER (CCPM)
Code: CPM6
CERTIFIED CONSTRUCTION
PROJECT MANAGER (CCPM)
Code: CPM6
© COPYRIGHT
CONSTRUCTION INDUSTRY DEVELOPMENT BOARD (CIDB)
i
© Construction Industry Development Board Malaysia 2019
Chief Executive
Construction Industry Development Board Malaysia
35th Floor, Menara Dato’ Onn
Pusat Dagangan Dunia Putra (PWTC)
No. 45, JalanTun Ismail
50480 Kuala Lumpur
No part of this publication may be reproduced or transmitted in any form or by any means, whether
mechanically or electronically including photocopy or recording without the written consent of CIDB.
ii
TABLE OF CONTENTS
FOREWORD ..................................................................................................................................................... X
1.1 PURPOSE OF THE CONSTRUCTION INDUSTRY COMPETENCY STANDARD (CICS) FOR CONSTRUCTION
PROJECT MANAGERS....................................................................................................................................... 1
1.1.1 Definition of CICS ......................................................................................................................... 1
1.1.2 Competencies for Construction Project Managers in the CICS ................................................... 1
1.1.3 Job Profile .................................................................................................................................... 1
1.1.4 Competency Profile ...................................................................................................................... 1
1.2.1 Significance of Certified Construction Project Managers (CCPM)............................................... 1
1.2.2 The need for CICS for Construction Project Managers ............................................................... 1
1.2.3 Definition of Certified Construction Project Manager (CCPM) ..................................................... 2
1.2.4 Scope of Project Management ..................................................................................................... 2
1.2.5 Certified Construction Project Manager (CCPM) ......................................................................... 4
4.1 ACCREDITATION................................................................................................................................... 6
4.2 APPLICANT .......................................................................................................................................... 6
4.3 CERTIFICATION .................................................................................................................................... 6
4.4 CERTIFICATION BODY .......................................................................................................................... 6
4.5 COMPETENCY ...................................................................................................................................... 7
4.5.1 Competency Unit (CU) ................................................................................................................. 7
4.5.1.1 Duty and Task ............................................................................................................................... 7
4.5.1.2 Key processes ............................................................................................................................... 7
4.5.1.4. Skills ............................................................................................................................................. 7
4.5.1.5. Technical Skill .............................................................................................................................. 7
4.5.1.6. Soft or Human Skills ..................................................................................................................... 7
4.5.1.7 Attitude .......................................................................................................................................... 7
4.5.1.8 Evidence Guide ............................................................................................................................. 8
4.5.1.9 Tools/ Equipment /Material............................................................................................................ 8
4.6 CONSTRUCTION INDUSTRY ................................................................................................................... 8
4.7 CONSTRUCTION WORKS ...................................................................................................................... 8
4.8 METHOD STATEMENT ........................................................................................................................... 8
4.9 PROJECT LIFE CYCLE .......................................................................................................................... 9
4.10 PROJECT LIFE CYCLE PHASES ............................................................................................................. 9
iii
4.11 RESOURCES ...................................................................................................................................... 10
4.12 STAKEHOLDER MANAGEMENT ............................................................................................................ 10
iv
4.06 Monitor and Control Environmental Requirement Audit & Compliance ..................................... 55
5.0 ADMINISTER PROJECT HANDOVER ........................................................................................... 56
5.01 Testing and Commissioning ....................................................................................................... 56
6.0 ESTABLISH OPERATIONS & MAINTENANCE PLAN .......................................................................... 60
6.01 Establish Operations Plan & Programme ........................................................................................ 60
6.02 Establish Facility Maintenance Plan ................................................................................................ 61
v
LIST OF FIGURES
Figure 1: Management activities within the project life Cycle .......................................................... 2
Figure 2: Activities within the project management phases in Traditional Projects .......................... 3
Figure 3 Activities within the project management phases in Design & Build (D&B) Projects .......... 3
LIST OF TABLES
Table 1: Occupational Structure of Construction Project Manager in Building and Construction – Sub
Sector of Civil Engineering............................................................................................................ 10
Table 2: Occupational Area Structure for Construction Project Management in Building and
Construction – Sub-Sector of Civil Engineering ............................................................................ 11
Table 3: The Competency Levels in Building and Construction – Sub-Sector of Civil Engineering 12
Table 4 : Route for applying to become a Certified Competent Project Manager (CCPM) ............ 14
Table 5: Occupational Chart for CCPM ......................................................................................... 17
vi
EXPERT PANEL
15. Mohammad Nazri bin Abdul Rani Global Quality Excellence Academy
16. Sr Dr. Mohd MazlanChe Mat MCM Value Sdn. Bhd
16. Azmi Baba MCM Value Sdn. Bhd
17. Ts. Dr Haryanti binti Mohd Affandi Universiti Kebangsaan Malaysia (UKM)
18. Ts. Dr Mohd. Firdaus b Mustaffa Universiti Pendidikan Sultan Idris (UPSI)
Kamal
19. Sr Ts. Muhamad Zaihafiz bin Zainal Infrastructure University Kuala Lumpur (IUKL)
Abidin
Facilitator:
Pn. Hanishahani binti Othman CIDB
Assistant Facilitator:
Pn. Nadzhatul Syamiru Usmaiza Othman CIDB
vii
Message from Chief Executive
The Malaysian construction industry is in the process of rapid change since the launch of the
Construction Industry Transformation Programme (CITP) 2016-2020. Over the last decades, we
have seen the tremendous change in the industry with the introduction of new technologies and new
construction processes and systems. Clients are getting more sophisticated, demanding higher
quality standards, construction within budget and tighter completion dates. This is exacerbated
further by with the growing trend among larger companies to increase the value of their business
through alternative procurement system such as Public private Partnership (PPP), Private Finance
Initiatives (PFI), facilities management and single point responsibility project delivery.
Coping with this transformation demands the industry’s human resource to transform concurrently.
Project Managers are at the heart of this transformation. They operate at the heart of the project
implementation process and are the focal point around which everything else in the project evolve.
In orchestrating the project implementation process, they are expected to perform in challenging,
variable and risky project environment to meet the demands of the projects.
Underpinning the development of this CICS is the need to enhance the development of competent
Projects managers needed by the industry through the process of certification. Its development
marks another milestone in the effort to further facilitate efforts to harmonise and facilitate the
process of developing Certified Competent Project Managers (CCPM) needed by the construction
industry. I thank all the parties involved for their valuable contribution in producing this CICS and
look forward to the useful use of this document.
viii
Message from Sector Head of Personnel and Contractor Development
The Construction Industry Competency Standard (CISC) for Project Manager was designed to
facilitate establish the process of certifying competent project managers for the Malaysian
construction industry. This was imbued on the conviction that success or the failure of construction
projects is significantly contributed by competent project managers. Established to support CIDB
Act 520 to certify and register Certified Construction Project Managers (CCPM), the competencies
of project managers identified in this document was mapped at the National Occupational Structure
at Level 6. Underpinning this aim is the necessity to provide the industry with precise definition of
who the competent Project Managers are, and what competencies they should possess to manage
construction projects effectively. The establishment of this CICS for Certified Construction Manager
will be very significant in assisting to circumvent any ambiguity on the conception of competent
project managers. Concurrently, it is also intended to serve as the reference document to streamline
the existing project management education and training offered within the construction industry.
At the onset of its development, comprehensive studies were undertaken to identify the vexing
issues of qualifying and certifying competent project managers in the Malaysian construction
industry. Following this, the conceptual competency model for the CICS was developed after
thorough review of project management competencies literatures and professional practice. This
includes the project management competencies identified by the Project Management Institute
(PMI) in their Project Management Body of Knowledge (PMBOK), Chartered Institute of Building
(CIOB), and the Royal Institution of Chartered Surveyors (RICS) which has been widely adopted in
Australia, United Kingdom and United States of America (USA), and in Malaysia by Jabatan Kerja
Raya (JKR) Malaysia. Special provision was also introduced to ensure that the CICS complements
the project managers’ competencies recognised by international and professional construction
bodies for the purpose of recognition and accreditation.
ix
Foreword
The Construction Industry Competency Standard (CICS) for Project Manager establishes the
competent standard of project managers in the Malaysian construction industry. The Certified
Construction Manager (CCPM) is defined in this CICS as the manager who is appointed to manage
construction projects which involve the process of design and construction. This contrasts the
competencies of CCPM against the competencies of Certified Construction Managers (CCM) who
are primarily responsible for managing the construction project ‘production’ activities at the project
site. The CICS provides the in-depth coverage of the capabilities expected of to be performed by a
CCPM by detailing the duties and tasks to be performed in the inception, design development,
tendering, construction and handover stages of the project life cycle. It also the outlines the lists of
what, when and how each project task should appropriately be carried out. Consideration was made
to ensure sure that the project managers’ competency standards underlined in this CICS are holistic
and generic, and able to accommodate variable project types, sizes and procurement systems.
In addition to providing a common understanding and terms of reference for guiding project
management practices, this CICS will also be relevant in facilitating the industry to design and deliver
of more effective education and training initiatives.
.
For comments and feedback, please channel to www.cidb.gov.my
x
1.0 Introduction
1.1 Purpose of the Construction Industry Competency Standard (CICS) for Construction
Project Managers
This was developed to specify the minimum level of competencies for certifying Competent
Construction Project Managers (CCPM) for the Malaysian construction industry.
1
Hairuddin M., P. F Hassan & Siti Khalijah, Yaman (2018), Construction Handbook Series Project
Management, Construction Management & Site Management, Penerbit UTHM, Johor, Malaysia
2
The pre-construction stages cover all the activities within the Inception, Design Development
and Tendering stages. The Construction stages covers the Construction and the Occupancy
stages of the project is Traditional Construction projects, as shown in Figure 2. The variant
of the activities which integrates the design and construction phases in Design and Build
(D&B) projects, is as shown in Figure 3.
Figure 3 Activities within the project management phases in Design & Build (D&B) Projects
3
1.2.5 Certified Construction Project Manager (CCPM)
A Certified Construction Project Manager (CCPM) is a professional who possess the accepted
level of project management competency to plan, coordinate, organise, monitor and control the
construction project activities. In the course of these undertaking, he or she is capable of
communicating the process, lead and motivate the project team and stakeholders towards the
project objectives. A Certified Construction Project Manager (CCPM) is the professional who
have met the competency standards set out in this CICS and qualified by CIDB.
2.0 Scope
This CICS stipulates the requirements for the qualification and accreditation of construction
project managers in the Malaysian construction industry. The accreditation shall provide
recognition of the qualifications and competence of this job function in managing construction
projects.
3.0 Abbreviation
The following are the abbreviations used throughout this document:
BQ : Bill of Quantities
BOT/BOOT : Build, Operate and Transfer / Build Operate Own Transfer
BIM : Building Information Modelling
BOWEC : Building Operations and Works of Engineering Construction
CBA : Cost Benefit Analysis
CCC : Certificate Completion and Compliance
CD/A : Clash Detection/Analysis
CCPM : Certified Construction Project Manager
CIDB : Construction Industry Development Board
COPQ : Cost of Poor Quality
CICS : Construction Industry Competency Standard
CCM : Certified Construction Manager
CCPM : Certified Construction Project Manager
CONQUAS : Construction Quality Assessment (Singapore)
CPM : Critical Path Method
CMMS : Computerised Maintenance Management System
CIS : Construction Industry Standard
4
D&B : Design and Built
DLP : Defect Liability Period
EPC : Engineer, Procure and Construct
EPCC : Engineering, Procure, Construction and Commissioning
ECA : Elemental Cost Analysis
EA : Environmental Audit
EIA : Environmental Impact Assessment
EIP : Environmental Implementation Plan
EMP : Environmental Management Plan
EMS : Environmental Management System
FIDIC : International Federation of Consulting Engineers
GBI : Green Building Index
GreenRE : A green building rating tool in Malaysia
GFA : Gross Floor Area
HIRARC : Hazard Identification, Risk Assessment and Risk Control
HSIP : Health & Safety Implementation Plan
HSMS : Health & Safety Management System
IRR : Internal Rate of Return
IT : Information technology
JCT : Joint Contracts Tribunal
LoB : Line of Balance
MyCREST : Malaysian Carbon Reduction and Environmental Sustainable Tool
NPV : Nett Present Value
OSH : Occupational Safety & Health
PAM : Pertubuhan Arkitek Malaysia
PERT : Program Evaluation Review Techniques
PPP : Public Private Partnership
PFI : Private Finance Initiative
PIP : Project Implementation Plan
PQP : Project Quality Plan
PIM : Project Implementation Manual
QA/QC : Quality Assurance / Quality Control
QLASSIC : Quality Assessment System in Construction
QMS : Quality Management System
QMP : Quality Management Plan
QIP : Quality Implementation Plan
RFP : Request For Proposal
5
ROI : Return of Investment
SHASSIC : Safety and Health Assessment System in Construction
SWOT : Strength, Weakness, Opportunities, Threat
SIA : Social Impact Assessment
SMM : Standard Method of Measurement
T&C : Testing & Commissioning
TIA : Traffic Impact Assessment
UBBL : Uniform Building By Law
VA : Value Assessment
VM : Value Management
VE : Value Engineering
VO : Variation Order
WBS : Work Breakdown Structure
4.1 Accreditation
A procedure by which the CIDB or any party authorised by it, gives formal recognition that a
body or person is competent to carry out a specific task relating to the construction industry.
4.2 Applicant
Individual who is seeking certification in accordance with this CICS.
4.3 Certification
The procedure by which CIDB under Act 520, or any party authorised by CIDB, gives written
assurance that a process, practice or service conforms to specified requirements.
6
4.5 Competency
The combination of Knowledge, Skill and Attitude (KSA) needed to perform a task
successfully and efficiently. In this document, KSA is being operationalised under
Competency Unit (CU)
. 4.5.1.3. Knowledge
Facts or information needed to perform a specific duty or task
4.5.1.4. Skills
Ability to perform a duty or task which can be divided into: (i) Technical Skills, and (ii) Soft or
Human Skills
4.5.1.7 Attitude
Set of values needed to execute a duty or task
7
4.5.1.8 Evidence Guide
Describes the documented evidence as justification that the project manager has execute
successfully performed the duty and task.
8
4.9 Project Life Cycle
The sequence of phases that a project goes through from its initiation to its closure.
i. Inception Phase:
This covers activities to establish the project brief & viability; develop conceptual design and
preliminary estimate; develop project implementation plan and control process; establish the
procurement strategy; and establish project financing, financial planning and control
processes.
v. Handover Phase:
This covers activities to handover the project; defects rectification; and project closeout/final
account.
9
4.11 Resources
These are stock or supply of money, material, manpower and machinery that is needed by
a person or organisation to function effectively.
Table 1: Occupational Structure of Construction Project Manager in Building and Construction – Sub Sector of
Civil Engineering
SUB
BUILDING, CIVIL ENGINEERING
SECTOR
CONSTRUCTION PROJECT
LEVEL 4 SITE ENGINEER
EXECUTIVE
CONSTRUCTION PROJECT
LEVEL 3 SITE SUPERVISOR
SUPERVISOR
CONSTRUCTION PROJECT
LEVEL 2 SITE TECHNICIAN
TECHNICIAN
LEVEL 1 GENERAL WORKER
10
6.0 Occupational Area Structure
The occupational area structure for the Construction Project Manager in the Building and
Construction within the Civil Engineering Sub-Sector noted for this document is as
highlighted in Table 2.
Table 2: Occupational Area Structure for Construction Project Management in Building and
Construction – Sub-Sector of Civil Engineering
SUB
BUILDING, CIVIL ENGINEERING
SECTOR
AREA CONSTRUCTION
LEVEL 1 GENERAL
11
Table 3: The Competency Levels in Building and Construction – Sub-Sector of Civil Engineering
12
8.0 Qualification and Certification
8.1 Certification Method Routes
There are THREE (3) alternative methods a candidate can apply to become a CCPM, which
are as follows:
The requirements and alternative routes to quality as a Certified Competent Project Manager
(CCPM) is shown in Table 4.
13
Table 4 : Route for applying to become a Certified Competent Project Manager (CCPM)
Min. Years of Experience
Categories Minimum Entry Requirement Required In
Construction/Related Field
14
9.0 Use of CCPM Professional Designation
Individuals granted with certification by CIDB in accordance with this CICS shall be eligible
to use the title Certified Construction Project Manager (CCPM) as long as the individual
maintains an active certification status. CIDB corporate rules and regulations stipulates that
the accredited individuals are authorised to affix the CCPM designation in block letters after
their name on business cards, personal letterhead, resumes, websites and in their email
signature.
Accredited individuals are NOT ALLOWED to use the CPM designation in company names,
domain names, product names, or any other unauthorised manner.
10.1.2 The tasks and roles of a CCPM is to plan, organise, monitor and control the activities
within the project’s inception, design development, tendering, construction, and
handover phases of the project life cycle. During the process he or she is expected
to be able effectively communicate, motivate and lead the project participants
towards the project objectives.
10.1.3 To enable the CPM to undertake the tasks and roles, he or she is expected to
possess adequate knowledge, skill and ability on the followings:
2. PROJECT INITIATION
4. PROCUREMENT MANAGEMENT
15
5. PROJECT PLANNING, MONITORING AND CONTROL
8. QUALITY MANAGEMENT
16
11.0 CCPM Occupational Chart
The CCPM Occupational Chart showing the structure for the Construction Project Manager
is as shown in Table 4.
17
12.0 Job Profile Chart: CPM Duties and Task
The description of the Duties and Tasks that need to be performed in each activity within each project management phase are detailed out in the
preceding sections of this document as follows:
DUTY TASK
18
DUTY TASK
5.0 5.01 L6
19
13.0 Competency Profile Chart: CPM Competency Unit (CU)
1.0 MANAGE PROJECT INCEPTION
1.01 Initiate the Project
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
1.1 Initiate Project Team Formation Knowledge in: • Consultants company • Project references.
• Gather Client’s Statement of Need • Client and consultants’ profile profile • Expert judgement
• Define project scope and limitations • Consultancy agreement and packages • Consultants’ • Business case analysis
• Establish design brief • Type of projects assessment report. • Focus group discussion
• Project management • National value • Facilitated workshop
1.2 Select & Appoint Consultants • Client’s needs analysis management guide • Product analysis
• Interview & negotiation • Human resources management • Organisation • Alternative identification
• Technical proposal • Contract management procedure • Observation
• Proposed fee • Benchmarking
• Agreement Skills: • Validate option
• Proposal evaluation & selections • Technical skills:
• Shortlist consultants - Consultancy capability and competency assessment.
• Quality based selection method - Value planning
• Fee bidding method - Business case
• Design competition method
• Request for proposals • Soft skills management:
• Statement of work - Creating positive working relationship
• Areas of expertise required - Communication using written and oral medium
• Time schedule - Team leadership skills
• Type of contract proposed - Negotiation skills
Attitude:
• Ethical
• Objective
• Analytical
20
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
2.1 Site Investigation Knowledge in: • Ordinance survey maps. • Master plans.
• Site accessibility • Site topography. • Survey plan. • Land title.
• Site survey • Authorities and statutory requirements. • Site investigation report • Political and Economic reports
• Ownership record investigation • Utilities/infrastructure networks. • Bore log reports • Authorities approval documents
• Soil investigation • Risk management. • Utility mapping • Supply chain directory/data base.
• Required easement • Client financial capacity • Local authority • Inventory analysis
• Utilities availability • Supply chain constraints development guideline • Observation
• Existing structures • Land matters
• Site restrictions
• Supply chain Skills:
• Technical skills:
- Site risk (land, site conditions, supply chain,
land matters, etc.) identification
Attitude:
• Ethical
• Observant
• Analytical
• Objective
• Resourceful
21
1.02 Develop Conceptual Design & Preliminary Estimate
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
DUTY NO: 1.02 DUTY: DEVELOP CONCEPTUAL DESIGN & PRELIMINARY ESTIMATE
TASK NO: 1 TASK: ESTABLISHING PROJECT PROGRAM (SCOPE, FEATURES, FUNCTION, ETC)
1.1 Statement of Need (Project Brief) Knowledge in: • Project program checklist • Space and function analysis
• Establish project scope • Understand client/user requirement • Authorities approval references
• Establish project Objective • Client’s brief guidelines and documents • Design analysis documents.
• Identify / clarify project needs • Need statement • Uniform Building By Laws • BIM software
• Identify final product Function • Design analysis • Organisation standards and • Design management framework
• Needs documentation guidelines • Interview
1.2 Programme Development (Design Brief) • Facilitated workshop
• Functional floor area Skills: • Product analysis
• Function analysis (engineering) • Technical skills: • Alternative identification
• Functional brief - Recording and documenting needs • Expert judgement
• Vertical circulation spaces requirement • Stakeholders analysis
• Horizontal circulation spaces - Reading design using IT softwares • Validate deliverables
• System requirement - Assessing technical reports • Product analysis
• Services requirement • Requirement elicitation
• Soft skills management: • Focus group discussion
- Creating positive working relationship and • Document analysis
environment
- Communication using written, oral and
digital medium
- Team leadership skills
Attitude:
• Ethical
• Observant
• Analytical
• Objective
22
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
DUTY NO: 1.02 DUTY: DEVELOP CONCEPTUAL DESIGN & PRELIMINARY ESTIMATE
2.1 Design Review Knowledge in: • Project program checklist • Space and function analysis
• Functional analysis • Authorities requirements • Authorities approval guidelines references
• Circulation space analysis • Capturing, recording and documenting needs and documents • Design analysis documents.
• Project elemental analysis: requirement • Uniform Building by Laws • BIM software
- Earthworks • Identify factors to be documented for design • Value Management (VM) guide • Facilitated workshop
- Building • Ability to forecast the probable outcome and • Value Management (VM) • Life cycle analysis
- Mechanical & electrical requirement elicitation report • Value engineering
- Civil & structural elements • Value engineering • Alternative identification
- Infrastructure works • Expert judgement
- Lifecycle cost analysis Skills: • categorization
• Construction safety • Technical skills: • Risk probability impact and
• Constructability - Reading project design assessment
• Maintenance - IT softwares application • Option analysis
- Assessing technical reports • Document analysis
2.2. Risk Identification, Assessment, Mitigation & - Interpret/ analyse design
Control Plan. - Cost evaluation
- Cost risk analysis
- Assessing technical reports
- Project reporting & presentation
Attitude:
• Ethical
• Observant
• Analytical
• Resourceful
• Objective
23
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
DUTY NO: 1.02 DUTY: DEVELOP CONCEPTUAL DESIGN & PRELIMINARY ESTIMATE
3.1 Establish Project Preliminary Estimate Knowledge in: • Project preliminary • Preliminary estimating documents
Method • Preliminary estimating techniques estimate report (Unit Method, Floor Area Method,
• Alternative procurement system • Basis of estimate Cubic Method, Cost Yardstick&
3.2 Evaluate project preliminary Estimate: • Development cost estimating methods/process Cost Modelling& aggregation)
• Cost Planning • Lifecycle, development and construction costing • Benchmarking
• Project Life Cycle Cost • Cost of money, present value • Reserved analysis
• Estimating risk and mitigation • Contingency
• Project viability • Project estimate software
• Project reporting & presentation • Expert judgement
Skills:
• Technical skills:
- Analysing preliminary estimates and project
viability
- Assessing technical reports
- Project reporting & presentation
Attitude:
• Ethical
• Observant
• Analytical
• Objective
24
1.03 Establish Project Brief & Viability
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
1.1 Establish Project Definition & Scope Knowledge in: • Market research report. • Project statistical data
• Statement of Requirement • Market environment/trends. • Industry reports and statistics
• Benefits • Market analysis methods.
• Constraints • Demographics/statistics.
• National economic trends
• Risk analysis
• Project life cycle, development and construction costing.
1.2 Identify Market Demand & Impact • Financial modelling
Analysis • Project reporting & presentation
• PASTEL (Political, Economic, Social,
Technological, Environmental and Skills:
Legal) • Technical skills:
- Viability data analysis.
- Predict/forecasting market trends.
- Viability risk assessment
- Analysing technical reports
- Preparing technical reports
Attitude:
• Ethical
• Observant
• Analytical
• Objective
25
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
TASK NO: 2 TASK: CONDUCT PROJECT IMPACT ANALYSIS & SWOT ANALYSIS
ENABLING REQUIREMENTS (KNOWLEDGE,
KEY PROCESSES/CRITERIA EVIDENCE GUIDE TOOLS/EQUIPMENT/MATERIALS
SKILLS, AND ATTITUDE)
2.1 Establish Project Development Impact Knowledge in: • Project impact • Project Plans (layout plans, survey
Assessment • Statutory requirements. analysis/SWOT reports plans, and topographic plans.
• Environmental Impact Assessment (EIA) • Marketing techniques • Expert judgement
• Traffic impact assessment (TIA)* • Statutory/authorities’ requirements.
• Social Impact Assessment (SIA)*
• Others (current statutory requirement) * Skills:
• Technical skills:
2.2 Conduct Project SWOT Analysis - Project economic financial assessment
• Strength - Statutory body/authorities’ roles and
• Weakness responsibilities
• Opportunities - Authorities’ approval process
• Threat - Analysing technical reports
• Soft skills management:
- Creating positive working relationship and
environment
- Communication using written, oral and
digital medium
- Team leadership skills
Attitude:
• Ethical
• Observant
• Analytical
• Objective
26
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
1.1 Prepare Feasibility Study Knowledge in: • Method statements • Taxation rules.
• Statistic and economics. • Cost study reports. • Cost data (Elemental Cost Analysis)
1.2 Feasibility Analysis • Marketing, market assessment techniques and • Option analysis (ECA) from previous project)
• Income/benefit trends. • BIM software (CostX,Glodon etc.)
• Project Costing • Project budgeting. • Focus group analysis
- Land Cost • Statutory and authorities’ requirements. • Interview
- Conversion Cost • Stakeholder management
- Consultants’ Fees Skills: • Alternative analysis
- Authorities Fees • Technical Skills: • Expert judgement
- Cost of Construction - Compile project report. • Business case
- Environmental mitigation cost - Analyse project information.
- Financing Cost & Scheduling - Assess project feasibility.
- Prepare report.
• Soft skills management:
1.3 Technical Feasibility Analysis - Creating positive working relationship and
• Constructability environment
• Construction schedule - Communication using written, oral and
• Construction safety and health digital medium
- Team leadership skills
Attitude:
• Ethical
• Observant
• Analytical
• Objective
27
1.04 Establish Project Procurement Strategy
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
1.1 Review Project’s Statement of Need/Client’s Knowledge in: • Procurement analysis • Suppliers/contractors database.
Brief: • Alternative procurement methods. reports. • Pricing and product database.
• Project Definition • Earned value management • Project impact • Inventory control documents.
• Project Scope • Project delivery processes. analysis/SWOT reports • Stakeholder risk analysis
• Project Financing • Supply chain • Master schedules
• Tendering methods • Design management
1.2 Assess Project Constraints: • Financial impact and constraint. framework report
• Technical/Economic & Construction • Statutory requirements. .
Constraints
• Safety Requirement Constraints Skills:
• Environmental Requirement Constraints • Technical skills:
• Authority Requirement Constraints - SWOT analysis.
• Financial Constraints - Select services and material procurement.
- Evaluate, compare and decide options
based on clients need.
• Soft skills management:
- Creating positive working relationship and
environment
- Communication using written, oral and
digital medium
- Team leadership skills
Attitude:
• Ethical
• Observant
• Analytical
• Objective
28
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL6)
2.1 Analyse Procurement Route Alternatives Knowledge in: • Procurement analysis • Suppliers/contractors database.
• Traditional/Conventional System • Project objectives and constraints on project reports. • Pricing and product database.
• Design and Built (D&B) • Procurement risks • Project impact analysis • Inventory control references.
• Design and Manage / Engineer, Procure • Project complexity and/or SWOT reports
and Construct (EPC/EPCC) • Tendering methods • Master schedules
• Turnkey • Key processes and activities to be performed
• Built, Operate and Transfer (BOT/BOOT) • The available procurement strategies and
• Public Private Partnership (PPP) contracts
• Relevant Capital Work Management policy
2.2 Perform SWOT Analysis requirements.
Attitude:
• Ethical
• Analytical
• Objective
• Attention to details
29
1.05 Develop Project Implementation Planning and Control Process
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
DUTY NO: 1.05 DUTY: ESTABLISH PROJECT IMPLEMENTATION PLANNING & CONTROL PROCESS
1.1 Establish Project Plan, Programme & Work Knowledge in: • Method Statement • Project data
Breakdown Structure • Planning and scheduling techniques (Gantt • Work Breakdown • IT related softwares (Primavera,
• Master Program Chart, Program Evaluation Review Techniques Structure (WBS) Microsoft project, BIM, Spreadsheet,
• Medium-Term Program (PERT), Critical Path Analysis (CPM @ CPA), • Project Master Excel, etc.)
• Work Breakdown Structure (WBS) LoB) Programmes, Mid- • Decomposition
• Short-Term program • Construction site layout plan Term/Short Term • Expert judgement
• Resource Scheduling • Method Statement Programmes • Published estimating data
• Resource Levelling • Construction methodology • Organisation portfolio & • Variance analysis
• Construction method statement • Resource planning & scheduling program • Performance review
• Rolling wave planning • Published productivity • Critical path method
Skills: data • Scheduling compression / crashing
• Technical skills: • Project Implementation • Applying lead/lags
1.2 Develop the Project’s Method Statement - Determine the sequence, duration, and Plan (PIP) • Reserved analysis
• Construction sequence resources for construction work • Critical chain method
• Construction method - Linking the project plans to project’s • Schedule network analysis
• Material requirement and specifications schedules and S-curve
• Resources schedule
• Labour and workmanship Master Program - Project planning and programming using
• Progress reporting
• Plant and machineries requirements software
Attitude:
• Ethical
• Analytical
• Objective
• Attention to details
30
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
DUTY NO: 1.05 DUTY: ESTABLISH PROJECT IMPLEMENTATION PLAN & CONTROL PROCESS
2.1 Identify/Map Project Stakeholders’ Knowledge in: • Project • IT related softwares (Primavera,
Responsibilities & Tasks • The tasks that need to be carried out by the project Implementation Microsoft project, BIM,
• Within the Project Plans (Master Program, stakeholders/parties in planning and controlling the Manual/System Spreadsheet, Excel, etc.)
Mid-Term Program, Short term Program) project implementation activities within the project life (PIM/PMS) • Minutes of meeting,
• Inception, Design Development, cycle phase. • Resource Schedules • Social media (WhatsApp,
Tendering, Construction, Handover, • Communicating the scope of work, role and Facebook, Emails, Online
Operations & Maintenance responsibilities to the project’s stakeholder/parties portals, etc.)
• Establish project organisation structure planning and controlling the project implementation • Decomposition
(Identify and assign Who does What and activities • Expert judgement
When) • The strategies to overcome the constrains/limitations • Interview
that may confronting the planning and control of the • Meetings
project implementation activities • Focus group discussion
2.2 Communicate Project Stakeholders’
Responsibilities & Tasks Skills:
• Within the Project Plans (Master Program, • Technical skills:
Mid-Term Program, Short-term Program): - Allocating the tasks to be carried out within the
• Inception, Design Development, activities in the project life cycle phase according to
Tendering, Construction, Handover, the project stakeholders/parties.
Operations & Maintenance - Communicating the strategies to overcome the
planning and controlling constrains/limitations
Attitude:
• Ethical
• Analytical
• Objective
• Observant
31
1.06 Establish Project Financing, Financial Planning & Control Process
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
DUTY NO: 1.06 DUTY: ESTABLISH PROJECT FINANCING, FINANCIAL PLANNING & CONTROL PROCESS
1.1 Project Cash Flow Forecasting: Knowledge in: • Project cash flow project • Project financial & Physical S-Curve
• Working capital management • Project income and expenditure report • Cash flow projection
- Internal / external • Project viability analysis (S-curve, Saw- tooth • Project financial analysis • Risk analysis documents
• Inflow: Diagram, Capital Lock-Up, Payback Period, reports • Financial reports
- Income and claims Break Even Point) • Performance review
- Financial facilities • Project Finance • Variance analysis
- Service factoring • Financial institutional requirement • Expert judgement
• Outflow • Financial accounting
- Overheads • Financial ratio – acid test
- Land cost • Financial risk management
- Professional fees
- Authorities charges Skills:
- Construction Cost • Technical skills:
- Financing Cost - Establish project cash flow
- Undertake financial risk analysis
1.2 Project Cash Flow Evaluation: - Comprehend financial statement
• Capital Lock-Up - Making sound project finance
• Sensitivity analysis recommendation
• Payback period (NPV, IRR,ROI and
Yield) • Soft skills management:
• Capital Financing/ & Financing Cost - Creating positive working relationship and
• Others (if any) environment
- Communication using written and oral
1.3 Project Cash Flow Management & Control medium
Plan - Team leadership skills
Attitude:
• Ethical
• Analytical
• Objective
• Observant
32
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
DUTY NO: 1.06 DUTY: ESTABLISH PROJECT FINCNCING, FINANCIAL PLANNING & CONTROL PROCESS
2.1 Project Financing Options: Knowledge in: • Risk analysis reports • Project financial & Physical S-Curve
• Terms loan • Securing/preparing financial institution working • Financial reports • Cash flow projection
• Bridging loan papers/ business proposal. • Procurement strategy • Financial institution, Bank Negara
• End financing • Categorising project financial risks documents/reports and Security Commission guidelines
• Internally generated funding • Financial risk assessment • Expert judgement
• Equity financing
• Business case (analysis)
Skills:
2.2 Project Financial Plan: • Technical skills:
• Financing strategy - Interpret financial viability and feasibility
- Implement financial mitigation measures
2.3 Project Financial Risk Analysis and financing contingencies
- Develop bankable project documentation
Attitude:
• Analytical
• Objective
• Observant
33
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
DUTY NO: 1.06 DUTY: ESTABLISH FINANCIAL PROJECT PLANNING & CONTROL PROCESS
TASK NO: 3 TASK: ESTABLISH PROJECT’S FINANCIAL ORGANISATION & CONTROL PROCESS
3.1 Project Team, Financial Control Knowledge in: • Risk analysis documents • Project financial & Physical S-Curve
Responsibilities &Tasks during: • Financial planning and control tasks that need • Financial reports • Cash flow projection
• Inception, Design Development, to be carried out by the project • Procurement strategy • Financial institution, Bank Negara and
Tendering, Construction, Handover, stakeholder/parties in the activities within the mapping documents Security Commission guidelines.
Operations & Maintenance project life cycle phase. • Resources allocation
(Identify and assign Who does What and • Communicating the financial control role, tasks • Human resources planning
When) and responsibilities to be carried out by the • Expert judgement
project’s stakeholder/parties
3.2 Communicate Project Stakeholders’ • Identifying the project’s financial risk
Financial Control Responsibilities & Tasks
during: Skills:
• Inception, Design Development, • Technical skills:
Tendering, Construction, Handover, - Allocating the financial control tasks and
Operations & Maintenance responsibilities to the project’s
stakeholder/parties
- Structuring financial risk mitigation
measures
Attitude:
• Analytical
• Objective
• Observant
34
2.0 MANAGE DESIGN DEVELOPMENT PROCESS& PROJECT ESTIMATE
2.01 Establish Project Detail Design
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
DUTY NO: 2.01 DUTY: ESTABLISH PROJECT DETAIL DESIGN & PROJECT ESTIMATE
Attitude:
• Analytical
• Objective
• Observant
35
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
DUTY NO: 2.01 DUTY: ESTABLISH PROJECT DETAIL DESIGN & PROJECT ESTIMATE
2.1 Elemental Cost Estimate: Knowledge in: • Bills of Quantities (BQ) • Programming/planning software.
• Work Breakdown Structure • Work breakdown structure • Method statements • Cost estimates.
• Elemental Quantities • Construction work programming • Elemental Cost Analysis (ECA) • Schedule of rates
• Built-Up Rates • Method statement. • Established estimated data • Quotations.
• Estimating • Statutory outgoing charges. • Life cycle costing • Contingencies reserve
• Detail cost estimate • Procurement methods.
• Resources allocation.
2.2 Elemental Cost Analysis: • Land cost, acquisition cost, eviction cost and
• Building Elemental Cost Breakdown land conversion cost.
• Cost/Gross Floor Area (GFA) • Financing charges.
• Element Unit Quantity
• Element Unit Cost Skills:
• Others, etc. • Technical skills:
- Project elemental breakdown
- Quantification/measurement using
Standard Method of Measurement (SMM)
- Build-up rates
- Elemental Cost Analysis (ECA)
• Soft skills management:
- Creating positive working relationship and
environment
- Communication using written, oral and
digital medium
Attitude:
• Ethical
• Analytical
• Objective
• Observant
36
2.02 Establish Project Quality Planning and Control Process
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
DUTY NO: 2.02 DUTY: ESTABLISH PROJECT QUALITY PLANNING & CONTROL PROCESS
1.1 Project Quality Policy: Knowledge in: • Quality Assurance and • Project Quality Management
• Policy Quality Statement • Quality Assurance and Quality Control (QA/QC) Quality Control (QA/QC) System
• Quality Audit Systems Documents • ISO9001
1.2 Risk Assessment Methodology - Quality Management System (QMS) and Quality • Organisation standard • Quality Assessment System in
• Quality risk analysis Implementation Plan (QIP) requirements operating procedure Construction (QLASSIC)
• Quality Audits (QLASSIC, CONQUAS, - Process mapping/mind mapping activities • Contractual documents • Quality Compliance Checklist
etc.) - Quality risk assessment • Inspections
- Quality team/structure • CIS 7
1.3 Quality Risk Planning Process: - Contents of Project Quality Plan (PQP)
- COPQ (Cost of poor quality)
Skills:
• Technical skills:
- Developing Quality Compliance Checklist
- Review PQP/Document
- Motivate/guide project stakeholders/parties towards
quality targets
- Setting quality target/objectives
- Quality coaching/facilitation
Attitude:
• Ethical
• Analytical
• Objective
• Observant
37
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
DUTY NO: 2.02 DUTY: ESTABLISH PROJECT QUALITY PLANNING & CONTROL PROCESS
2.1 Project Stakeholders’ Quality Monitoring & Knowledge in: • Quality Assurance and • Project Quality Management
Control Responsibilities & Tasks during • Operationalising/structuring Quality Implementation Plan Quality Control (QA/QA) System
the project’s Inception, Design (QIP), Quality Assurance and Quality Control (QA/QC), Documents • Quality Assurance and Quality
Development, Tendering, Construction, and Quality Audit Systems implementation: • Project quality plan Control (QA/QA) Documents
Handover, Operations & Maintenance - Establishing team/ structure/ responsibilities/ • Inspection test plan • ISO9001
Stages deliverables • Contract documents • CIS7
(Identify and assign Who does What and - QA/implementation framework • Quality Assessment System in
When) - Quality communication structure Construction (QLASSIC)
- Assigning responsibilities of different parties • Quality Compliance Checklist
2.2 Communicate Project Stakeholders’ - Promoting appreciation of QA/QC (audit, • Inspection
Quality Monitoring Responsibilities & specifications, drawings, submission/approval,
Tasks during the project’s Inception, progress, etc.)
Design Development, Tendering,
Construction, Handover, Operations & Skills:
Maintenance Stages • Technical skills:
- Developing Health & Safety Compliance
- Evaluating/review PQP Document
- Setting quality target/objectives
- Motivate/guide project parties towards quality targets
- Quality coaching/facilitation
• Soft skills management:
- Creating positive working relationship and
environment
- Communication using written, oral and digital medium
- Team leadership skills
- Facilitation/coaching skills
Attitude:
• Ethical
• Analytical
• Objective
• Observant
38
2.03 Establish Project Health and Safety Planning and Control Process
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
DUTY NO: 2.03 DUTY: ESTABLISH PROJECT HEALTH AND SAFETY PLANNING & CONTROL PROCESS
Attitude:
• Ethical
• Analytical
• Objective
• Observant
39
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
DUTY NO: 2.03 DUTY: ESTABLISH PROJECT HEALTH AND SAFETY PLANNING & CONTROL PROCESS
2.1 Project Stakeholder’s Health & Safety Knowledge in: • HIRARC Documents • Project Health & Safety
Responsibilities Mapping: • Operationalising/structuring Health & Safety • Contract document Management System
(Identify and assign Who does What Management, and Audit implementation, Building • Health and safety • ISO45001
and When) Operations And Works Of Engineering Construction documents and checklists • Safety and Health Assessment
(BOWEC): System in Construction
2.2 Communicate Project Stakeholders’ on - Establishing team/ structure/ responsibilities/ (SHASSIC)
Quality Monitoring Responsibilities & deliverables • Environmental Health & Safety
Tasks - HIRARC implementation framework Compliance Checklist
- Health & safety communication structure • CIS 10
- Assigning health and safety responsibilities of • Safety briefing
different parties
- Promoting appreciation of HIRARC (audit,
specifications, submission/approval, progress, etc.)
Skills:
• Technical skills:
- Evaluating/review HIRARC Document
- Setting health & safety targets/objectives
- Motivate/guide project parties towards quality targets
- Health & safety coaching/facilitation
Attitude:
• Ethical
• Analytical
• Objective
• Observant
40
2.04 Establish Environmental Planning and Control Process
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
DUTY NO: 2.04 DUTY: ESTABLISH PROJECT ENVIRONMENTAL PLANNING & CONTROL PROCESS
Attitude:
• Ethical
• Analytical
• Objective
41
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
DUTY NO: 2.04 DUTY: ESTABLISH PROJECT ENVIRONMENTAL PLANNING & CONTROL PROCESS
Attitude:
• Ethical
• Analytical
• Objective
• Observant
42
2.05 Conduct Value Management
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
1.1 Value Management Assessment (VA)/Value Knowledge in: • Established Value • Value Management Workshop
planning • Value management process and management report document
• Establish project scope and objective methodology • National VM guide • Fast Diagram
• Function analysis • Capturing lesson learnt • Established government • Functional analysis
• Determine value mismatch • Project analysis guide & Cost policy • Cost model
• VM Change Proposal • Established data • Energy model
• Establish value chain Skills: • VA report • Space function analysis model
• Technical skills: • VE report • Benchmarking
1.2Value engineering - Establish verb and noun function analysis • Job Plan tools
statement. • Facilitated workshop
• Function analysis - Classify assign cost to the function. • Brainstorming
• Design simplification • Value mismatch
• Standardisation • Soft skills management: • Alternative, pair & comparison analysis
• Construction efficiency - Creating positive working relationship
• Modular/pre-assembly design and environment
- Communication using written, oral and
• Site Planning
digital medium
- Team leadership skills
1.3Value Analysis:/ Value review
- Facilitation/coaching
• Function analysis
• Design simplification Attitude:
• Standardisation • Ethical
• Construction efficiency • Analytical
• Modular/pre-assembly design • Objective
• Site Planning • Observant
43
2.06 Obtain Authorities Approval
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
1.1 Statutory Requirements And Approvals: Knowledge in: • Uniform Building By • Public relations tools
• Planning Permission • Project subject matter. Laws (UBBL) • Planning permission documents.
• Development Orders (D.O.) • Statutory requirements. • Project milestones • Acts and Regulations
• Testing & Commissioning • Process flow and procedure • Local authority • Checklist
• Certificate of Completion and requirement • Submission form
Compliance (CCC) Skills • Utility service provider • Inspection
- Plumbing Codes • Technical skills: registration (TNB, IWK
- Safety & Health Codes - Interact/responding to authorities’ JBA etc...)
concern. • Specification standards
- Establish working relationship with
authorities.
- Collate requirements.
Attitude:
• Ethical
• Analytical
• Objective
• Diplomatic
44
3.0 EXECUTE TENDER
3.01 Tender Documentation
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
1.1 Tender Document Preparation: Knowledge in: • Request for Proposal • Procurement method
• Invitation to Tender • Type of contract. (RFP) • Tendering procedure/guidelines
• General Conditions • Contract law. • Tender documents, • Quality Assurance/Quality Control
• Form of Tender • Industrial practices procedures. • Project drawings strategy.
• Form of Contract • Selection of tenderer. • Specifications • Project strategy.
• Specifications • Quality management system requirements. • Organisation • Procurement strategy.
• Drawings process/procedure • Contractors’ profiles.
• Bills of Quantities Skills • Site investigation/visit.
• Schedule of Rates • Technical skills: • Project budget.
• Notice of Non-collusion - Leading project team.
• Special Instructions - Pre-Qualification.
- Incorporation of QMS, HIRARC and EMS in
tender documents.
Attitude:
• Ethical
• Analytical
• Objective
45
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
Attitude:
• Ethical
• Analytical
• Objective
46
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL6)
Attitude:
• Ethical
• Analytical
• Objective
• Decisive
47
4.0 PROJECT MONITORING AND CONTROL
4.01 Monitor and Control Project Progress
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
DUTY NO: 4.01 DUTY: MONITOR & CONTROL THE PROJECT PROGRESS
1.1 Project Progress Reporting: Knowledge in: • Contract document. • Work breakdown Structure (WBS)
• Mobilisation • Work process. • Method Statements • Master Programme, Mid-Term
• Progress records • Contract administration. • Progress reports. Programme, Short-Term Programme.
• Change Orders • Project planning. • Project Planning software.
• Verification that the work was performed • Divergence forecast. • Variance analysis
• Delays • Performance review
• Variations Skills • Schedule compression/crashing
• Technical skills: • Resources levelling
- Project monitoring skills.
- Forecast progress trends
- Identify divergence consequences
Attitude:
• Ethical
• Analytical
• Objective
• Decisive
• Observant
48
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
DUTY NO: 4.01 DUTY: MONITOR & CONTROL THE PROJECT PROGRESS
2.1 Project Progress Monitoring: Knowledge in: • Master Programme, Mid- • Work breakdown Structure (WBS)
• Progress Reports • Work process. Term Programme, Short- • Project Planning software.
• Progress Meetings • Contract administration. Term Programme. • Variance analysis
• Operational Audits • Project planning. • Contract document. • Performance review
• As-built Information • Industrial practices. • Method Statements • Expert judgement
• Construction techniques. • Progress reports.
Attitude:
• Ethical
• Analytical
• Objective
• Decisive
• Observant
49
4.02 Monitor & Control Project Finances/Cash Flow
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
DUTY NO: 4.02 DUTY: MONITOR & CONTROL THE PROJECT CASH FLOW
ENABLING REQUIREMENTS
KEY PROCESSES/CRITERIA EVIDENCE GUIDE TOOLS/EQUIPMENT/MATERIALS
(KNOWLEDGE, SKILLS, AND ATTITUDE)
1.1 Report Project Cash Flow Income & Knowledge in: • Contract documents. • Cash flow report.
Expenditure: • Accounting techniques. • Sub-contract documents. • Work program.
• Amount • Contract administration. • Project cash flow reports • Progress report
• Timing • Work process.
• Delays • Construction cost characteristics.
• Outstanding
Skills
• Technical skills:
- Comprehend cash flow statement.
Attitude:
• Ethical
• Analytical
• Objective
• Decisive
• Observant
50
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
DUTY NO: 4.02 DUTY: MONITOR & CONTROL THE PROJECT CASH FLOW
2.1 Cash Flow Analysis: Knowledge in: • Project budget report. • Cost estimates.
• Cash Flow Surplus/Deficits • Accounting and financing techniques. • Contract document. • Quotations.
• Financing shortfalls • Contract administration. • Variation orders.
• Work process. • Planning software.
• Construction costing.
2.2 Cash Flow Control: • Value engineering.
• Re-Planning Cash Flow
• Implications to project progress Skills
• Lessons Learnt • Technical skills:
- Detect pattern anomaly.
- Detect price variations.
- Analyse claims payment data.
Attitude:
• Ethical
• Analytical
• Objective
• Decisive
• Observant
51
4.03 Administer Construction Contract
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
DUTY NO: 4.03 DUTY: ADMINISTER PROJECT LEGAL & CONTRACT REQUIREMENTS, CHANGES & INFORMATION MANAGEMENT
TASK NO: 1 TASK: ADMINISTER THE CONSTRUCTION CONTRACT , CHANGES & INFORMATION MANAGEMENT
1.1 Manage the Construction Contract, rights and Knowledge in: • Standard forms of contract. • JCT
responsibility of contracting parties. • Contract administration: • Bespoke contracts
• Contract Documents - Variations • FIDIC
• Contract Sum - Extension of Time and Monetary Claims • PAM
• Variations - Payments and Certificates • ARCA
• Extension of Time and Monetary Claims - Subcontracting • ICE
• Payments and Certificates - Commencement and Completion • CIDB
• Subcontracting - Determination of Contractor’s Employment
• Commencement and Completion before Completion
• Determination of Contractor’s Employment - or any other clauses
before Completion
Skills
• Any other clauses
• Technical skills:
- Comparative analysis or various forms of
1.2 Establish Dispute Resolution Mechanism: contract
- Claims management.
• Litigation
• Arbitration.
• Soft skills management:
• Mediation.
- Creating positive working relationship and
• Conciliation. environment
• Negotiation. - Communication using written and oral
• Facilitation. medium
Attitude:
• Ethical
• Analytical
• Objective
• Observant
52
4.04 Monitor and Control Quality Compliance
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
ENABLING REQUIREMENTS
KEY PROCESSES/CRITERIA EVIDENCE GUIDE TOOLS/EQUIPMENT/MATERIALS
(KNOWLEDGE, SKILLS, AND ATTITUDE)
1.1 Report Quality Compliance Monitoring & Knowledge in: • Quality Assurance and Quality • Project Quality Management System
Reporting: • Monitoring & review of quality compliance Control (QA/QA) Documents • Quality Assessment System in
• Earthworks • Quality audit systems procedure • ISO9001 Construction (QLASSIC)
• Building Works: (QLASSIC, CONQUAS, etc) • Quality audit/assessment • QA/QC documents
- Sub-Structure reposts • Quality Compliance Checklist
- Super-structure Skills • CIS7
- Roof • Technical skills:
- Floors - Review quality compliance/target
- Walls achievement
- Services - Computation of quality audit scores
- Finishes - Non-conformance resolution
- External Works
• Infrastructure Works: • Soft skills management:
- Roads - Creating positive working relationship
- Drains and environment
- Fencing & Gate - Communication using written and oral
- Landscaping medium
- Signage
- Water Reticulation Attitude:
- Electrical Supply/Sub-station • Ethical
- Sewerage • Analytical
• Objective
1.2Quality Audits: • Observant
• Quality Audits (QLASSIC, CONQUAS,
etc.)
53
4.05 Monitor and Control Health and Safety Compliance
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
DUTY NO: 4.05 DUTY: MONITOR & CONTROL PROJECT’S HEALTH AND SAFETY COMPLIANCE
1.1 Report Project Health &Safety Compliance: Knowledge in: • HIRARC Documents • Project Health & Safety Management
• Health & safety management procedures • Monitoring & review of Health & Safety • ISO45001 System
• Health & Safety Manager compliance • Health and safety • Safety and Health Assessment System
• Health & Safety Committee • Health & Safety systems procedure (SHASSIC) assessment/audit reports in Construction (SHASSIC)
• Health &Safety • Environmental Health & Safety
performance/achievements: Skills Compliance Checklist
- Workforce welfare • Technical skills: • CIS 10
- Wellbeing - Review Health & Safety compliance/target
- Occupational health management achievement
- Reportable occupational health issues - Computation of Health & Safety audit scores
- Hazardous substances - Health & Safety non-conformance resolution
- Personal protective equipment
- Further detail on statutory regulation • Soft skills management:
- Health & safety work instructions and - Creating positive working relationship and
provision environment
- Project site hazard, risk and harm - Communication using written and oral
- Design and construction hazard medium
- Health & safety documentation and
files Attitude:
- Welfare facilities • Ethical
• Analytical
1.2 Health & Safety Audits: • Objective
• Safety and Health Assessment System in • Observant
Construction (SHASSIC)
54
4.06 Monitor and Control Environmental Requirement Audit & Compliance
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
DUTY NO: 4.06 DUTY: MONITOR & CONTROL ENVIRONMENTAL REQUIREMENT COMPLIANCE
55
5.0 ADMINISTER PROJECT HANDOVER
5.01 Testing and Commissioning
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
1.1 Completing the Work Knowledge in: • Contract document. • Operation and maintenance manual.
• Preliminary inspection • Project elements for testing & commissioning • Acts and legislations. • Defects list.
• Contractor’s Testing &Start-up • Testing &commissioning procedure • Handover reports. • Inspection
• Preliminary Defect List • Approval requirements • As built drawings. • Method statement
• Preliminary inspection • Building components operations and • Specification
• Inspection maintenance • Design consultant
• Testing &Start-up • Contractual implications of testing and recommendation
• Final Defect list commissioning • Schedule of making good
• Handing over Application Submission • Warranties defect
Skills
• Technical skills:
- Identify defects/non-compliance Report.
- Element rectification process.
- Measure and quantify non-compliance
and/or non-completion.
Attitude:
• Ethical
• Analytical
• Objective
56
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
ENABLING REQUIREMENTS
KEY PROCESSES/CRITERIA EVIDENCE GUIDE TOOLS/EQUIPMENT/MATERIALS
(KNOWLEDGE, SKILLS, AND ATTITUDE)
2.1 Work Knowledge in: • Contract document. • Quality, Safety, Health and
• Pre-handover Inspections • Statutory requirements. • Pre-handover assessment Environmental plans and records.
• Handover Inspections • Contractual requirements. reports • Acts and legislations.
• Remedial • Operation and maintenance requirements • Testing and commissioning • Records of warranties.
• Testing &Commissioning • As Built Drawings. reports • Operational and maintenance manual.
• Operating and Maintenance Manual • Warranty documents • Conduct O& M Training
Submission Skills • Handover checklist reports • Register defect list
• As-Built Drawings • Technical skills: • List deliverables • Conduct joint inspections
• Warranty Documentation - Coordinate handing-over process. • Record T & C result
• Defect list - Compiling and recording As Built • Schedule of maintenance
• Performance Bond Drawings
• Liquidated Damages - Authorities, client and end user liaison
• Penultimate Payments - Total handing-over package delivery.
• Soft skills management:
- Creating positive working relationship
and environment
- Communication using written and oral
medium
Attitude:
• Ethical
• Analytical
• Objective
57
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
TASK NO: 3 TASK: MANAGE PRACTICAL COMPLETION DEFECTS DURING DEFECTS LIABILITY PERIOD (DLP)
ENABLING REQUIREMENTS
KEY PROCESSES/CRITERIA EVIDENCE GUIDE TOOLS/EQUIPMENT/MATERIALS
(KNOWLEDGE, SKILLS, AND ATTITUDE)
3.1 Issues during DLP Knowledge in: • Project pre-handover • Operation and maintenance manual.
• Type of defects • Defects and quality assessment system reports. • Defects list
- Patent defect • Defects resolution reports • Expert judgement
- Latent defect Skills • As built drawings • Schedule of making good defects
- Defect/ shrinkage and/or fault • Technical skills: • Minutes meeting • Joint inspection
identification - Administering defects rectification • Close out
• Processes process
- Issuance of Schedule of Defects
- Inspection • Soft skills management:
- Creating positive working relationship
and environment
- Communication using written and oral
medium
Attitude:
• Ethical
• Analytical
• Objective
58
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
T TASK NO.: 4 TASK: PROJECT CLOSEOUT, LESSON LEARNED ,FEEDBACK FOR CONTINUOUS IMPROVEMENT & FINAL ACCOUNT
4.1 Close Out & Final Account Knowledge in: • Project Final Account • MOS
• Post-Performance Evaluation • Contractual obligation matters. • Project close-out • Drawing standards
• Termination Notification • Statutory requirements. report • Operations and Maintenance Training
• Documentation • Cost and time management. (O&M)
• Titles To Major Equipment Incorporated In
The Facility Skills
• Inspection & Acceptance Record • Technical skills:
• Other Typical Deliveries - Coordinate and compile the various project
• Release of Liens accounts.
• Close Account - Negotiate the statement of account with the
• Certification contractors.
- Issuance of Certificate of Making Good - Communicate and present the final
Defects statement of account.
- Issuance of Final Certificate
• Soft skills management:
- Creating positive working relationship and
environment
- Communication using written and oral
medium
Attitude:
• Ethical
• Analytical
• Objective
59
6.0 ESTABLISH OPERATIONS & MAINTENANCE PLAN
6.01 Establish Operations Plan & Programme
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
1.1 Establish Facility Operations Plan: Knowledge in: • Building/facilities • Equipment operations manual
• Facility Operations aim, objectives and • Building/facilities operations, equipment and management Computerized maintenance
activities systems configuration documents management system (CMMS)
• Operations organization and • Hard and soft building/facility management • Operations &
administration • Life cycle costing Maintenance Manual
• Facility operations monitoring and • Facilities management. and related
assessment process documents
• Operations human resource establishment Skills:
• As built drawing/plan • Technical skills:
• Operation manual - Analyse and evaluate on the operation and
maintenance facilities
- Building/facilities operations set-up
• Soft skills management:
- Communication using written and oral
medium
Attitude:
• Ethical
• Analytical
• Objective
60
6.02 Establish Facility Maintenance Plan
OCCUPATION: CERTIFIED CONSTRUCTION PROJECT MANAGEMENT (LEVEL 6)
1.1 Establish Facility Maintenance Plan: Knowledge in: • Building maintenance • Equipment operations manual
• Facility maintenance aim, objectives and • Building/facilities operations, equipment and documents • Computerized maintenance
activities systems maintenance process management system (CMMS)
• Maintenance organization and • People, place and process elements of the
administration building/facility
• Facility operations monitoring and • Types of maintenance.
assessment process • Computerized maintenance
• Preventative, periodic and corrective management system (CMMS)
maintenance documentation and inventory • Latent and patent defects
• Maintenance human resource • Planned and corrective maintenance
establishment and training • Life cycle costing,
• Maintenance work control system
• Equipment Performance Monitoring Skills:
• Engineering Support Procedures and • Technical skills:
Documentation - Identify, analyse and evaluate the facilities
• Maintenance manual that needs to be managed
- Setting up the facilities management system
Attitude:
• Ethical
• Analytical
• Objective
61