Lampiran 1: Slope Stability Analysis Input Data
Lampiran 1: Slope Stability Analysis Input Data
Settings
USA - Safety factor
Stability analysis
Earthquake analysis : Standard
Verification methodology Safety factors
: (ASD)
10
Safety factors
Permanent design situation
Safety factor : SFs = 1.50 [–]
Interface
Coordinates of interface points [m]
No. Interface location
x z x z x z
1 0.00 -0.22 2.66 -0.16 3.38 0.23
6.96 -0.10 12.85 -0.04 20.22 -0.02
20.37 0.03 23.38 0.72 32.26 6.85
40.73 9.99 42.95 10.17 43.38 10.38
46.28 10.87 63.38 17.34 67.30 19.61
67.96 19.95 72.25 20.18 83.38 24.50
85.16 26.85 93.82 24.49 99.52 30.34
103.39 31.08 114.92 39.50 121.75 41.65
123.39 39.81 133.79 45.22 142.19 47.82
143.39 46.34 154.29 48.18 161.03 48.22
162.42 47.86 163.39 47.61 165.21 47.83
2 TIMBUNAN 17.00
20
1
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
LAMPIRAN 1
ANALISA PERKUATAN TIMBUNAN LERENG POTONGAN E - H
Soil parameters
TANAH ASLI
Unit weight : = 15.00 kN/
m3
Stress-state : effective
Angle of internal friction : = 30.00 °
ef
Cohesion of soil : ce = 14.00 kPa
f
Saturated unit weight : s = 17.00 kN/
at m3
TIMBUNAN
Unit weight : = 15.00 kN/
m3
Stress-state : effective
Angle of internal friction : = 25.00 °
ef
Cohesion of soil : ce = 4.00 kPa
f
Saturated unit weight : s = 17.00 kN/
at m3
5 Assigning and surfaces
Coordinates of surface points [m] Assigned
No. Surface position
x z x z soil
1 163.39 47.61 162.42 47.86
TANAH ASLI
161.03 48.22 154.29 48.18
143.39 46.34 142.19 47.82
133.79 45.22 123.39 39.81
121.75 41.65 114.92 39.50
103.39 31.08 99.52 30.34
93.82 24.49 85.16 26.85
83.38 24.50 72.25 20.18
67.96 19.95 67.30 19.61
63.38 17.34 46.28 10.87
43.38 10.38 42.95 10.17
40.73 9.99 32.26 6.85
23.38 0.72 20.37 0.03
20.22 -0.02 12.85 -0.04
6.96 -0.10 3.38 0.23
2.66 -0.16 0.00 -0.22
0.00 -4.79 165.21 -4.79
165.21 47.83
Water
Water type No
: water
10
Tensile crack
Tensile crack not
inputted.
2
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
LAMPIRAN 1
ANALISA PERKUATAN TIMBUNAN LERENG POTONGAN E - H
Earthquake
Earthquake not
included.
Settings of the stage of construction
5
10
Circular slip surface
Slip surface parameters
x= 56.04 [m] 1 = -4.54 [°]
Center : Angles :
z= 134.66 [m] 2 = 44.68 [°]
Radius : R= 124.19 [m]
The slip surface after optimization.
Slope stability verification (Bishop)
Sum of active forces : Fa 4366.31 kN/m
=
Sum of passive forces Fp 8556.26 kN/m
: =
Sliding moment : Ma 542251.54 kNm/
= m
Resisting moment : Mp 1062602.5 kNm/
= 2 m
Factor of safety = 1.96 > 1.50
Slope stability ACCEPTABLE
15
Input data (Stage of construction 2)
Earth cut
Coordinates of cut points [m]
No. Cut location
x z x z x z
1 98.17 28.95 135.87 29.00 143.37 36.50
148.37 36.50 165.21 43.84
3
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
LAMPIRAN 1
ANALISA PERKUATAN TIMBUNAN LERENG POTONGAN E - H
Coordinates of surface points [m] Assigned
No. Surface position
x z x z soil
165.21 43.84 148.37 36.50
143.37 36.50 135.87 29.00
98.17 28.95
Water
Water type No
: water
5 Tensile crack
Tensile crack not
inputted.
Earthquake
Earthquake not
included.
10
4
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
LAMPIRAN 1
ANALISA PERKUATAN TIMBUNAN LERENG POTONGAN E - H
Assigning and surfaces
Coordinates of surface points [m] Assigned
No. Surface position
x z x z soil
1 32.26 6.85 23.38 0.72
TANAH ASLI
20.37 0.03 20.22 -0.02
12.85 -0.04 6.96 -0.10
3.38 0.23 2.66 -0.16
0.00 -0.22 0.00 -4.79
165.21 -4.79 165.21 43.84
148.37 36.50 143.37 36.50
135.87 29.00 98.17 28.95
93.82 24.49 83.87 19.10
72.43 19.03 59.78 9.07
38.41 9.12
Water
5
Water type No
: water
Tensile crack
Tensile crack not
inputted.
10 Earthquake
Earthquake not
included.
Settings of the stage of construction
Design situation permane
: nt
15
5
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
LAMPIRAN 1
ANALISA PERKUATAN TIMBUNAN LERENG POTONGAN E - H
5 Reinforcements
Reinforc
Point to the left Point to the right Length Strength Pull out resist. End of
No. ement
new x [m] z [m] x [m] z [m] L [m] Rt [kN/m] reinf.
1 Yes 38.69 9.31 60.00 9.31 21.31 95.00 Tp = 95.00 kN/m2 Fixed
2 Yes 40.15 10.31 61.40 10.31 21.25 95.00 Tp = 95.00 kN/m2 Fixed
3 Yes 41.61 11.31 62.50 11.31 20.89 95.00 Tp = 95.00 kN/m2 Fixed
4 Yes 43.07 12.31 63.70 12.31 20.63 95.00 Tp = 95.00 kN/m2 Fixed
5 Yes 44.54 13.31 64.80 13.31 20.26 95.00 Tp = 95.00 kN/m2 Fixed
6 Yes 45.87 14.31 66.00 14.31 20.13 95.00 Tp = 95.00 kN/m2 Fixed
7 Yes 47.03 15.31 67.52 15.31 20.49 95.00 Tp = 95.00 kN/m2 Fixed
6
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
LAMPIRAN 1
ANALISA PERKUATAN TIMBUNAN LERENG POTONGAN E - H
Reinforc
Point to the left Point to the right Length Strength Pull out resist. End of
No. ement
new x [m] z [m] x [m] z [m] L [m] Rt [kN/m] reinf.
8 Yes 48.20 16.31 68.80 16.31 20.60 95.00 Tp = 95.00 kN/m2 Fixed
9 Yes 49.36 17.31 70.00 17.31 20.64 95.00 Tp = 95.00 kN/m2 Fixed
10 Yes 50.52 18.31 71.40 18.31 20.88 95.00 Tp = 96.00 kN/m2 Fixed
11 Yes 54.95 19.31 80.00 19.31 25.05 51.00 Tp = 51.00 kN/m2 Fixed
12 Yes 56.43 20.31 80.00 20.31 23.57 51.00 Tp = 51.00 kN/m2 Fixed
13 Yes 57.08 21.31 80.92 21.31 23.84 51.00 Tp = 51.00 kN/m2 Fixed
14 Yes 57.72 22.31 81.67 22.31 23.95 51.00 Tp = 51.00 kN/m2 Fixed
15 Yes 58.37 23.31 82.42 23.31 24.05 51.00 Tp = 51.00 kN/m2 Fixed
16 Yes 59.02 24.31 83.17 24.31 24.15 51.00 Tp = 51.00 kN/m2 Fixed
17 Yes 59.67 25.31 83.98 25.31 24.31 51.00 Tp = 51.00 kN/m2 Fixed
18 Yes 60.31 26.31 84.67 26.31 24.36 51.00 Tp = 51.00 kN/m2 Fixed
19 Yes 60.96 27.31 85.42 27.31 24.46 51.00 Tp = 51.00 kN/m2 Fixed
20 Yes 61.61 28.31 86.17 28.31 24.56 51.00 Tp = 51.00 kN/m2 Fixed
21 Yes 55.78 19.81 80.00 19.81 24.22 51.00 Tp = 51.00 kN/m2 Fixed
22 Yes 56.75 20.81 80.00 20.81 23.25 51.00 Tp = 51.00 kN/m2 Fixed
23 Yes 57.40 21.81 80.92 21.81 23.52 51.00 Tp = 51.00 kN/m2 Fixed
24 Yes 58.05 22.81 81.67 22.81 23.62 51.00 Tp = 51.00 kN/m2 Fixed
25 Yes 58.70 23.81 82.42 23.81 23.72 51.00 Tp = 51.00 kN/m2 Fixed
26 Yes 59.34 24.81 83.17 24.81 23.83 51.00 Tp = 51.00 kN/m2 Fixed
27 Yes 59.99 25.81 83.98 25.81 23.99 51.00 Tp = 51.00 kN/m2 Fixed
28 Yes 60.64 26.81 84.67 26.81 24.03 51.00 Tp = 51.00 kN/m2 Fixed
29 Yes 61.28 27.81 85.42 27.81 24.14 51.00 Tp = 51.00 kN/m2 Fixed
30 Yes 39.42 9.81 60.60 9.81 21.18 95.00 Tp = 95.00 kN/m2 Fixed
31 Yes 40.88 10.81 62.00 10.81 21.12 95.00 Tp = 95.00 kN/m2 Fixed
32 Yes 42.34 11.81 63.00 11.81 20.66 95.00 Tp = 95.00 kN/m2 Fixed
33 Yes 43.81 12.81 64.30 12.81 20.49 95.00 Tp = 95.00 kN/m2 Fixed
34 Yes 45.27 13.81 65.30 13.81 20.03 95.00 Tp = 95.00 kN/m2 Fixed
35 Yes 46.45 14.81 66.80 14.81 20.35 95.00 Tp = 95.00 kN/m2 Fixed
36 Yes 47.61 15.81 68.00 15.81 20.39 95.00 Tp = 95.00 kN/m2 Fixed
37 Yes 48.78 16.81 69.30 16.81 20.52 95.00 Tp = 95.00 kN/m2 Fixed
38 Yes 49.94 17.81 70.60 17.81 20.66 95.00 Tp = 95.00 kN/m2 Fixed
39 Yes 51.10 18.81 72.00 18.81 20.90 95.00 Tp = 96.00 kN/m2 Fixed
Water
Water type No
: water
5 Tensile crack
Tensile crack not
inputted.
Earthquake
Earthquake not
included.
10
7
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
LAMPIRAN 1
ANALISA PERKUATAN TIMBUNAN LERENG POTONGAN E - H
Reinforcement forces
Reinforceme Force
nt [kN/m]
1 54.83
2 39.68
3 3.85
4 0.00
5 0.00
6 0.00
7 0.00
8 9.35
9 20.63
10 54.97
11 51.00
12 51.00
13 51.00
14 51.00
15 51.00
16 51.00
17 51.00
18 51.00
19 51.00
20 51.00
21 51.00
22 51.00
23 51.00
24 51.00
25 51.00
26 51.00
27 51.00
28 51.00
29 51.00
30 37.75
31 22.60
32 0.00
33 0.00
34 0.00
35 0.00
36 0.00
37 5.49
38 26.27
39 67.02
Slope stability verification (Bishop)
Sum of active forces : Fa = 3588.94 kN/m
8
[GeoStructural Analysis - Slope Stability | version 5.19.5.0 | Copyright © 2015 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
LAMPIRAN 1
ANALISA PERKUATAN TIMBUNAN LERENG POTONGAN E - H
Sum of passive forces Fp = 5787.49 kN/m
:
Sliding moment : Ma = 225744.20 kNm/
m
Resisting moment : Mp = 364033.31 kNm/
m
Factor of safety = 1.61 > 1.50