Client: Rahul Srivastav

capacity: 3000cum/d

Flow rate cu.m/d 100


working hour hr. \
Avg. flow rate cu.m/hr
Number of settler Nos 1
Design flow cu.m/hr 0.00
Vertical ht. Of TubeSettler media m 0.75
Shape MMATL Make Hex.-Chevron
Cross section size mm X mm 120 X 44
Settling area sq.m/cu.m 11 13
Angle of inclination degrees 60 55
Settling velocity m/hr 0.6
Factor of safety 0.7
Plan area reqd. sq.m
Vol. Of TUBEDEK/clarifier cu.m
Area of TUBEDEK sq.m 0.00
SLR cu.m/sq.m-hr #DIV/0!
Design SLR cu.m/sq.m-hr 3.50
Area of TUBEDEK required sq.m
Dim. Of TUBEDEK mXm 3.40 3.4
Angle correction m 0.43 SAY 0.44 0.75/tan60
Tank dimension mXm 3.40 x 3.4
Actual Tube plan area sq.m 11.56
Actual Tube volume cu.m 8.67
SLR at design flow cu.m/sq.m-hr 0.00
Water above T.S. Clear water zone m 0.50
Water below T.S. baffle zone m 1.20
Side water depth m 2.45
Free board m 0.30
Tank depth(excl. hopper) m 2.75
Tank Dimension mXmXm 3.4X3.4X2.75
No. of Hoppers 1
Bottom slope degrees 45
TUBEdek volume cu.m 8.67
0.75/tan60