working hour hr. \ Avg. flow rate cu.m/hr Number of settler Nos 1 Design flow cu.m/hr 0.00 Vertical ht. Of TubeSettler media m 0.75 Shape MMATL Make Hex.-Chevron Cross section size mm X mm 120 X 44 Settling area sq.m/cu.m 11 13 Angle of inclination degrees 60 55 Settling velocity m/hr 0.6 Factor of safety 0.7 Plan area reqd. sq.m Vol. Of TUBEDEK/clarifier cu.m Area of TUBEDEK sq.m 0.00 SLR cu.m/sq.m-hr #DIV/0! Design SLR cu.m/sq.m-hr 3.50 Area of TUBEDEK required sq.m Dim. Of TUBEDEK mXm 3.40 3.4 Angle correction m 0.43 SAY 0.44 0.75/tan60 Tank dimension mXm 3.40 x 3.4 Actual Tube plan area sq.m 11.56 Actual Tube volume cu.m 8.67 SLR at design flow cu.m/sq.m-hr 0.00 Water above T.S. Clear water zone m 0.50 Water below T.S. baffle zone m 1.20 Side water depth m 2.45 Free board m 0.30 Tank depth(excl. hopper) m 2.75 Tank Dimension mXmXm 3.4X3.4X2.75 No. of Hoppers 1 Bottom slope degrees 45 TUBEdek volume cu.m 8.67 0.75/tan60