No Tanggal Nama Uang Masuk Uang Keluar Saldo Sumber 1 10/1/2021 Saldo Bulan Lalu -Rp 56,500 2 10/1/2021 2 kg Paku 4 Rp 40,000 -Rp 96,500 3 10/1/2021 2 kg Paku 2,5 Rp 40,000 -Rp 136,500 4 10/1/2021 2 Tampar Rp 10,000 -Rp 146,500 5 10/2/2021 Buku Tamu Rp 12,000 -Rp 158,500 6 10/2/2021 Papan Ujian Rp 5,000 -Rp 163,500 7 10/2/2021 Staples Kecil Rp 16,500 -Rp 180,000 8 10/2/2021 Isi Staples 2 Rp 7,000 -Rp 187,000 9 10/2/2021 Trigonal Clip Rp 2,500 -Rp 189,500 10 10/2/2021 100 Baut 20 Rp 25,000 -Rp 214,500 11 10/2/2021 2 MD Rp 8,000 -Rp 222,500 12 10/3/2021 Transfer Develop Rp 500,000 Rp 277,500 13 10/4/2021 7 Timba Cor Rp 63,000 Rp 214,500 14 10/4/2021 Obeng + Steker Rp 15,000 Rp 199,500 15 10/6/2021 Becak 2x Rp 50,000 Rp 149,500 16 10/6/2021 1 Baut/Secro 5 Rp 110,000 Rp 39,500 17 10/6/2021 3 kg Bendrat Rp 63,000 -Rp 23,500 18 10/6/2021 Bambu 15 Rp 225,000 -Rp 248,500 19 10/7/2021 Transfer Develop Rp 1,000,000 Rp 751,500 20 10/7/2021 Lem Isarplas Rp 67,500 Rp 684,000 21 10/7/2021 1 Kuas + 1 Lembar Ampelas Rp 6,000 Rp 678,000 22 10/7/2021 10 T1/2 Pipa Rp 30,000 Rp 648,000 23 10/7/2021 10 L1/2 Pipa Rp 25,000 Rp 623,000 24 10/7/2021 3 Engsel Rp 42,000 Rp 581,000 25 10/7/2021 1 Pendel Osok Rp 130,000 Rp 451,000 26 10/7/2021 Papan Cor 20 Rp 200,000 Rp 251,000 27 10/7/2021 Becak Rp 25,000 Rp 226,000 28 10/7/2021 Mata Grenda Rp 65,000 Rp 161,000 29 10/7/2021 Gembok Rp 55,000 Rp 106,000 30 10/7/2021 Cantolan Gembok Rp 15,000 Rp 91,000 31 10/7/2021 Colokan T Rp 5,000 Rp 86,000 32 10/7/2021 Token Listrik Rp 52,000 Rp 34,000 33 10/7/2021 Paku 2 kg Rp 20,000 Rp 14,000 34 10/7/2021 Kertas Sidu A4 1/2 Rem Rp 25,000 -Rp 11,000 35 10/7/2021 Bensin Tukang Rp 10,000 -Rp 21,000 36 10/7/2021 Sewa Proyektor Rp 25,000 -Rp 46,000 37 10/8/2021 1 Paku Rp 18,000 -Rp 64,000 38 10/8/2021 3 kg Bendrat Rp 65,000 -Rp 129,000 39 10/8/2021 Parkir Rp 2,000 -Rp 131,000 40 10/8/2021 Paku T 1/2kg Rp 15,000 -Rp 146,000