$ CONVERSION FACTORS
$ 1 Ft = .3048 M
$ 1 Kg = 9.81 N
$ 1 in = 25.4 mm
$ 1 Kip = 4.4482 KN
$______________________________________________________________________________
$Type
s------------------------------------------------------------------------------
GUYS
$--TOP
$--BOTTOM
$ CHECK NEEDED
DIV-3 26.3 3.81 377 176.0E3 1.17E-5 1545 1 $ 574 new cables
$--BOTTOM
$--TOP $ TOP
$ TOP
ROSE-5 34 4.80 740 137300 1.17E-5 1312 1 $ 990 UTS WTS ESTIMATED
MID-B 35 4.86 585 116E3 1.17E-5 1367 1 $ 773 KN MID & TOP
GUY_D 46 9.36 1196 158E3 1.17E-5 1495 1 $ 1+11/16 DIA 1553 KN UTS
GUY_E 38 6.40 815 158E3 1.17E-5 1554 1 $ 1+3/8 DIA 1054 KN UTS
GUY_F 30 3.58 456 158E3 1.17E-5 1499 1 $ 1+1/16 DIA 621 KN UTS
GUY_G 22 2.65 238 158E3 1.17E-5 1499 1 $ 1+1/16 DIA 400 KN UTS
$------------------------------------------------------------------------------
$------------------------------------------------------------------------------
GUY_A 30 5.0 560 180E3 1.17E-5 600 1 $$DEMO CABLE 775 KN UTS
T1-DELTA 40 7.62 942 170000 1.17E-5 1630 1 $ 1430 TOP, LOCKED COIL
T7-DELTA 12.5 0.84 97.1 77000 1.17E-5 450 1 $ 1430 TOP, LOCKED COIL
$$ AMERICAN SITES------------------------------------------------
11/16EHS 17.4625 1.48 188 146000 1.17E-5 1189 1 $ 223 KN UTS $(.6875" 1.0lb/ft )
$ Ac FROM wt/FT
PARAFIL7 7.0 .037 7.64 77.7E3 1.175E-5 1926 1 $ 14.71KN BREAKING LOAD
PARAFIL8.5 8.5 .054 15.28 77.7E3 1.175E-5 1926 1 $ 29.43KN BREAKING LOAD
PARAFIL11 11.0 .091 30.55 77.7E3 1.175E-5 1926 1 $ 58.86KN BREAKING LOAD
PARAFIL13.5 13.5 .149 53.47 77.7E3 1.175E-5 1926 1 $ 102.98KN BREAKING LOAD
PARAFIL17 17.0 .215 76.38 77.7E3 1.175E-5 1926 1 $ 147.11KN BREAKING LOAD
PARAFIL20 20.0 .300 114.60 77.7E3 1.175E-5 1926 1 $ 220.72KN BREAKING LOAD
PARAFIL22 22.0 .375 152.80 77.7E3 1.175E-5 1926 1 $ 294.29KN BREAKING LOAD
$Created by MLD
$NORSELAY
$Created by MLD (fu determined from minimum breaking loads not characteristic ultimate)
$$ http://www.brunton-shaw.co.uk/
$$ http://www.brunton-shaw.co.uk/composite.html
$ GUYS
SPIRAL01 01 0.01 0.79 180952 1.17E-5 1629 1 $ false stay for towers to part 4
Spiral100 100 48.2 5740 155052 1.17E-05 1575 1 $ Breaking load = 9040 kN
Spiral105 105 53.1 6335 155012 1.17E-05 1605 1 $ Breaking load = 10170 kN
Spiral110 110 58.3 6950 154964 1.17E-05 1606 1 $ Breaking load = 11160 kN
Spiral115 115 63.7 7605 155030 1.17E-05 1606 1 $ Breaking load = 12214 kN
Spiral120 120 69.4 8275 155045 1.17E-05 1607 1 $ Breaking load = 13300 kN
Spiral125 125 75.3 8975 154986 1.17E-05 1611 1 $ Breaking load = 14460 kN
Spiral130 130 81.4 9710 154995 1.17E-05 1610 1 $ Breaking load = 15630 kN
Spiral135 135 87.8 10495 155026 1.17E-05 1605 1 $ Breaking load = 16845 kN
Spiral140 140 94.4 11285 154984 1.17E-05 1605 1 $ Breaking load = 18112 kN
Spiral145 145 101.5 12080 154967 1.17E-05 1610 1 $ Breaking load = 19450 kN
Spiral150 150 108 12970 154973 1.17E-05 1604 1 $ Breaking load = 20800 kN
$------------------------------------------------------------------------------
$ GUYS