No :
DATE :
CUSTOMER : PT. IAMI
PART NAME : AGV IN HOUSE PROJECT
Qty : 1 unit
PIC CUSTOMER : BPK RIAN WICAKSONO
A. MATERIAL COST
B. PROCESS COST
NO PROCES NAME Hour HARGA PROS
1 Fabrication 24 Rp
2 Assembly 24 Rp
3 Electrical 48 Rp
B. TOTAL
C. KONSUMABLE COST
NO ITEM QTY HARGA PER ITEM
1 CUTTING WHEEL 14" 2 pcs Rp
2 CUTTING WHEEL 4" 5 pcs Rp
3 Kawat Las CO 1 pcs Rp
C. TOTAL KONSUMA
6
C. TOTAL KONSUMABLE COST COST 208,000
9,109,237
9,109,237
10% 910,924
10,020,160
0% - 1,481,131
10,020,160 1,597,680
1.098
7.85
2.60
1.14
8.00
perhitungan
p*l*t*bj/1000000) volume diameter (3.14*r2*t*bj/1000000)
mat/kg r2 bj mat/kg
3.14 0 7.85 0
3.14 0 7.85 0
3.14 0 7.85 0
2 1475 193594
393750.51 65.625085
1280 2 2560
1180 2 2360
450 3 1350
350 3 1050
250 3 750
240 2 480
500
###
List Kebutuhan Material AGV In House
Qty : 1 Unit