GOVERNMENT POLYTECHNIC, PUNE.

-4 11016
(An autonomous Institute of Govt. Of Maharashtra)
University road, Pune –41106 Tel: 256555907,25666764
Format A

Daily Progress Report of the student during online In-plant


Training at Sandvik Asia pvt. Ltd.

Name of the student: Sakshi Kashish Option: 4 th (work from home)


Semester:
Enrollment No.: 1904042
Diploma in Mechanical engineering.
Date: 25th Aug 2021 Monday
Time: 12 afterwards

Today I covered the 2 topics Tool Holding and Other information.


Following topics were covered by this lesson-

▪ Tool holding.
▫ Vital important factors for successful machining
1. Stability
2. Handling
3. Time for tool changing
4. Accuracy
5. Storing
6. Flexibility
7. Modularity
▫ Quick change system can increase the cutting time by 25% in turning centers.
▫ History of machine tapers.
▫ Coromant Capto holding system.
▫ Only 36% of the machine time is used for metal cutting.
▫ SL* Universal modular system of adaptors wit exchangeble cutting heads.
▫ 6 different coupling sizes
▫ Turning centers
▫ Machining centers
▫ Multi – task m/c
▫ Types of chucks.
Signature of student

Signature of teacher mentor


Industry Mentor

Government polytechnic, pune.


Organization-
Date: