DRAWING LIST

GROUP SUB DRAWING TITLE PAGE GROUP SUB DRAWING TITLE PAGE

A TRENCHING WORK D HANDHOLE


HANDOLE (INNER 60 X 40 X 60) WITH THICKNESS
1 TRENCH WITH 1.5M DEPTH 01 1 28 - 31
10 CM
HANDOLE (INNER 100 X 100 X 120) WITH
2 TRENCH WITH 1.2M DEPTH 02 2 32 - 35
THICKNESS 10 CM
3 TRENCH WITH 1.1M DEPTH 03

4 NO SPEC DEPTH TRENCH 04 E CABINET FOUNDATION

5 WARNING TAPE 05 FOUNDATION FOR ODC

6 MARKING POST 06 - 08 1 ODC - 288 (SIEGES) 36 - 40

7 ROJOK - 1 WAY 09 2 ODC - 144 (NWC) 41 - 45

8 ROJOK - 2 WAY 10 3 ODC - 576 (NWC) 46 - 50

4 ODC - 288 (NWC) 51 - 55

B BORRING WORK FOUNDATION FOR MSAN

1 BORRING WORK WITH 1 PIPE (MANUAL/MACHINE) 11 - 12 5 MSAN - D200 56 - 60

2 BORRING WORK WITH 2 PIPE (MANUAL/MACHINE) 13 - 14 6 MSAN - D500 61 - 65

BORRING WORK WITH 1 PIPE (MANUAL/MACHINE)


3 15 - 16
UNDER RELWAY

F ARIAL INSTALLATION STANDART 66 - 70

C DUCT CROSSING / BRIDGE

1 CROSSING DRAINAGE WITH 1 GSP 17

2 CROSSING DRAINAGE WITH 2 GSP 18

3 CROSSING SMALL RIVER WITH 1 GSP 19

4 CROSSING BIG / WIDE RIVER WITH 1 GSP 20 - 21

DUCT ATTACH.TO THE EXISTING BRIDGE WITH 1


5 22
GSP
DUCT ATTACH.TO THE EXISTING BRIDGE WITH 2
6 23
GSP

HANGING BRIDGE - TYPE 1 (USING 2 STEEL POLE


7 24 - 25
9M)

HANGING BRIDGE - TYPE 1 (USING 2X2 STEEL


8 26 - 27
POLE 9M)