fara —
FeRTy,
‘Wai—-SUDA/AMRUT/Water-01/2021 UDHDY..... 453...
ARGS UAT
sre fore wd orare fart
see fron aftraer
SPT BAR, srenote
Free |
TAR SRT / on AR sTgaT / Er TR arya /ortara verkerers,
hh, cuter, cra, ante daey, ae, MRE wt aaER
srr Rrra / Ie rare |
ae, Resin all eg]22.21
fears 06.09.2021 of wet orenyht atornat aiarfa fee on xe ora Water
fara ux oregt ue Rava wrlera ¥ arr aa} wde 7)
oR fra & td Y we 8 fH suioco eR freer eet Tey aornsit
Or DPR anf wed aa dH gfral at qua 4% water meter TA UT ver B] Sat eet
vrengt dorms ¥ suoco er 8 wafia wiftat eer wed fen on wer 81 creMgfs ctornsit
# area pc, vuiftral, Propet ua Revenue Sharing Model Ux corde Were reer WRT ay
wera went 7 eB oer waTE Ger Halo cen Gel STI Yee HT WET A
ore: fer 06.09.2021 wt yates 11:90 ae Wo Hee TET wT, wert Tat
arate wr fetta orkaren 4 fer wafer art dar Yaa we
1, JuIDCO KR & GM, Technical, wat afer Peri a area Gear B project
Managers WPT off | wer a ori oe wel wuiftral od pc at Ysar feo ERT
orteren # art oF bq fee fear ween |
2. Per & wate ea vertrert, word wae wit d sfaaeel & eer
cordaren ¥ art oF |
3. M/s Sparrow Softech Pvt. Ltd. @ Director IT @referren 4 ART eH |
4, at door ahaa, pmu-ra wrferon 4 art a
fear
Que w—2
( oaftret aie), ;
Pree |
‘ariee— SUDA/AMRUT/ Water-01/2021 /UDHD?/ 3... trai feria, all esl 202)
ufatef— .0.(7) 1uInco/emu-ra/ Waiter wire sat orisrar A art aar Yat weParticipant
PROPOSED SCHEDULE FOR
CONSULTATIVE MEETING FOR PROVIDING WATER CONNECTIONS:
BY AGENCY APPOINTED BY JUIDCO
Organized by State Urban Development Agency {SUDA},
Government of Jharkhand, Date: 6! September 2021
Scnior representatives of Jindal, JUSCO, JMC Ltd with Laxmi Civil
Eng(LCESPL), Larsen &Toubro & Sri Ram, M/s Shri Sai Constrnetion& Rock &
rill
GM, JUIDCO, Project Managers of JUIDCO and PMCs.
Scnior representatives of M/s Sparrow Softech(P) Ltd, M/s Sri Publications and
Stationers Pvt Ltd & M/s Ritika Printech (PjLtd, CA Pankaj Gocl, TL, PMU-RA
Representative of Ranchi Nagar Nigam, Dhanbad Nagar Nigam, Hazaribagh
Nagar Nigam, Chas Nagar Nigam, Giridih Nagar Nigam, Adityapur Nagar Nigam,
Deoghar Nagar Nigam and Latehar Nagar Panchayat
TiN SCHEDULE OF THE SESSION. =
11,00 am to 11:30am | Registration of Participants
11.90 am to 11:45 pm_| Overview and Introduction: By Shri Amit Kumar, IAS, Director (SUDA)
14:48am to 12:90 pm.
Presentation by Contractor/PMOs/Agency appointed by JUIDCO
Presentation must include overview of scope of work as per contract
awarded by JUIDCO and work done as on 31 August 2021 with detailed
action plan to cover following activities
+ Number of House to be Target as per contract Vis-a Vis Number of
House Targeted as on 31 August 2021
+ Integration of data with State Portal
+ Timelines of completion of assigned task
Presentation by PMU-RA, CA Pankaj Gocl,Team Leader, PMU-RA
+ To cover status of Governance with regard to Water Connection in
State and way forward required by agencies for integration of
Water connection with State Portal
Discussion among the participants to resolve queries any an
1:00 pm to 1:30 pm ‘mong the participants t ‘queries Hany and
form strategy with timelines
concluding Remarks and Way Forward: iy Shri Ashish kumar
1:90 pm to 1:45 pm | Comeluding Remarks and Way Forward: By Shii Ashish ka
Assistant Director, SUDAConsultative meeting for providing Water Connections by Agency appointed by JUIDCO in (be,
Selected Cities
1. BACKGROUND
1.1 Water Supply Project in certain ULBs is being implemented by JUIDCO and executed by
selected water connection agencies. The DPR of these water supply project of these
ULBs{Table 1)consist of following:
a) Providing Free water connections with installation of water meter where new
distribution network is being laid after based on water survey
b) Installation of Free water meter where HH have water connections from existing
scheme but without Meter.
1.2 Status of these agencies has been given in Table 1 as follows:
Table 4: List of Water Connection agencies
# Name of ULB “Name of Agency ee
1 ADITYAPUR MUNICIPALCORPORATION Jindal
2 CHAS MUNICIPAL CORPORATION Jusco - ct
3 DEOGHAR MUNICIPAL CORPORATION JMC Ltd with Laxmi Civil Eng(LCESPL)
4 DHANBAD MUNICIPALCORPORATION Larsen &Toubro & Sri Ram
5 GIRIDIH NAGAR NIGAM M/s Shri Sai Construction 4
6 | HAZARIBAGH NAGAR NIGAM Larsen & Toubro if A
7 LATEHAR NAGAR PANCHAYAT Rock & drill
8 RANCHI MUNICIPAL CORPORATION Larsen &Toubro oe
2. IN FIELD eee
These agencies appointed by JUIDCO have carried out survey without taking into account
existing data base maintained at State portal and further, have not captured holding ID
during survey leading to non-integration of water connections with HH data base.
2.2 However, bill is being served by Tax Collection agencies appointed by State for collection
of Taxes/Fees and user Charges. This led to overlapping of activities of tax collection
agencies and water connection agencies.
Water connections provided by these agencies have not been updated on State portal due
to which actual water connection of State cannot be identified and moreover water user
charges can not be collected by Tax Collection agencies.
3. PROPOSED CONSULTATIVE MEETING
3a
23
To overcome the above challenges and ensure smooth implementation of Water Rules
2020, consultative meeting with water connection Agency appointed by JUIDCO in
Selected Cities under Chairmanship of Director, SUDA and related stakeholders is being
convened where following issues will be discussed and strategy for augmentation of
assessment and collection of water user charges will be planned.
ws ate Presentation by JUIDCO about scope of work and timelines within which work is to
1) be completed
Presentation by Contractor/PMC with regard to status of Water Connections as on
1,2 g* 31 July 2021 and proposed action plan with Timeline for completion as per Contract.
** eqs'e’ Way Forward for convergence of revenue dashboard with proposed water
connections
3.2- Following members shall be invited for consultative meeting:
a) Senior Representatives of Water Connection agencies
b) Project Director of JUIDCO
oo) Team Leader :PMU:RA
d) Project Head of all Tax Collection agencies
e) City Managers of all selected ULB where scheme is implemented