You are on page 1of 1

ANODE CHARACTERISTICS

- ROW A
TYPE LONG SLENDER STAND-OFF ANODE, TRAPEZOIDAL SHAPE
- SCALE : 1/300
MATERIAL INDIUM ACTIVATED ALUMINIUM ALLOY
A NET ANODE MATERIAL WEIGHT 476 kg
0500 TOTAL ANODE WEIGHT (INDICATIVE) 586 kg
4176
2 1 410 3658 410

50
R3
2 STIFFENERS 10mm THK.
ANODES QUANTITIES

TYP ROW +LEG 1 + LEG 2 + SKIRTS 95


200x200x15mm THK. PLATE
(ROLLED TO O.D. PIPE WITH TOTAL NUMBER 95
25mm RAD. CORNERS) TOTAL WEIGHT (tons) 56

EL. +0.000 MSL TYP - TYPICAL ANODE DETAIL NOTES:


5
0500 SCALE : 1/40 1 - REFERENCE SHALL BE MADE TO THE PROJECT SPECIFICATION
SHK-SJ-EF-803-0001 FOR CP DESIGN AND ANODE INSTALLATION.

=
2 - A MINIMUM DISTANCE OF 0.5m BETWEEN ANODES IS RECOMMENDED TO AVOID SHIELDING OR
INTERFERENCES EFFECTS.
3 - ALL ANODES SHALL BE PARALLEL TO THE APPARENT BATTER.
4 - DISTANCE BETWEEN ANODES FASTENING WELDS AND STRUCTURAL WELDS SHALL BE 150mm.

ANODES ON MUDMAT
=
5 - ANODES INSTALLED ON LEGS SHALL FACE THE CENTER OF THE STRUCTURE.
6 - ANODES QUANTITY IS BASED ON SHK-SJ-EC-803-0010 CN-SHK JACKET-CATHODIC PROTECTION.

OR 500mm FOR
LEVEL -14.000 7 - FINAL ANODE NUMBER AND DISTRIBUTION SHALL BE CONFIRMED BY CALCULATIONS,

300 (TYPE 1)
231 TAKING INTO ACCOUNT THE EXACT DIMENSIONS AND CHARACTERISTICS OF THE ANODE SELECTED

=
FOR CONSTRUCTION (DATA TO BE GIVEN BY ANODE SUPPLIER).

(TYPE 2)
8 - FINAL ANODE LOCATION SHALL BE ADJUSTED BY CONTRACTOR, TAKING INTO ACCOUNT OF THE

=
ZONE 1

CONSTRUCTION CONSTRAINTS SUCH AS EXACT POSITION OF CONSTRUCTION WELDS, ETC...

=
18

INSERT 4" SCHEDULE 80 9 - CORE MATERIAL SHALL BE API 5L GRADE B OR EQUIVALENT.

249
10 - ANODE COULD BE INSTALLED STAGGERED IF REQUIRED AT SDE PHASE.

TOP OF TUBULAR
=

=
=
TUBULAR O.D. VARIES
TYP
=

=
=

LEVEL -39.600
= A SECTION
=

=
0501 SCALE : 1/40

=
= =

= SH1 1 2 SH2
46000 SHK - JACKET
=

EL. +13.000
1 2
EL. +10.500 LC1 LC2 23.25° PLANT

=
= 46000 NORTH
TRUE
=

EL. -14.000 NORTH

EL. -39.600 A
=
N
=

40000
C
ZONE2

LEVEL -65.200 EL. -65.200


28

= B
EL. -90.800
=

LC1 LC2
=

EL. -110.800 MUDLINE


=
REFERENCE DRAWINGS :
SHK-ST-DA-803-0150 : DWG - SHK / GENERAL NOTES DRAWING / (PHASE 3 EPCIC)
SHK-ST-DA-803-0160 : DWG - SHK / STANDARD WELDING DETAILS / (PHASE 3 EPCIC)
=

SHK-ST-DA-801-0155 TO 0162 : DWG - STANDARD STRUCTURAL ITEMS (PHASE 3 EPCIC)


=
=

=
=

LEVEL -90.800 = =

= =
=

= =

6 PER SKIRT SLEEVE = =


=

(TYP.)
ZONE 3

= =
49

=
=

= = B 11.06.2021 IFC ISSUED FOR COMMENTS JBoi BDu DE

A 04.06.2021 IDC INTERNAL DISCIPLINE CHECK JBoi BDu DE


=

EL. -110.800 B.O.P. Revision Date Status Revision Memo Issued by Checked by Approved by
MUDLINE
CONTRACTOR DOCUMENT NO:

EPCIC SERVICES FOR SHWE PROJECT PHASE 3 DEVELOPMENT

TOTAL REQUIRED = 95 ANODES


This document is the property of COMPANY and shall not be disclosed to third parties or reproduced without permission of the owner.

SHK JACKET
0 15000 30000
JACKET ANODES LOCATION - ROW A
COMPANY ELECTRONIC-FILE_NAME
Document No. SHK-SJ-DA-803-0050 Sheet 1 of 1 Scale 1/300 SHK-SJ-DA-803-0050.dwg