DIRECÇÃO GERAL DAS OBRAS PUBLICAS

DIRECÇÃO NACIONAL DE ESTRADAS, PONTES E CONTROLO DE CHEIAS


DIRECÇÃO DE SERVIÇOS MUNICIPAL DAS OBRAS

REPUBLICA
DEMOCRATICA
DE TIMOR - LESTE
BACK UP DATA

NAME OF PROJECT ROAD REHABILITATION


LOCAATION OF PROJECT ESTRADA HU'LOU - PONTE OBRATO 3+210
WORK ITEM PLASTER LINE DRAINAGE

SKETCH

Plaster 50 MM THICK

0.20

0.806

0.400

Left

BACK UP DATA COMPUTATION


Length (L) Width Hight (H) A2
No Station Volume (V) (Cu.m)
(m) (m) (m) (Sq.m)
1 2.412 0.050 0.12 48.24
0+100 - 0+500 400.00
2

Total Quantity 48.24

PREPARED BY : APROVED BY :

(ENG. AZEVEDO C. S. LINO) (ENG. GERALDO DA C. LEMOS SOARES)


TECNICO SUPERVISOR MANATUTO DIRECTOR SMOPM MANATUTO