You are on page 1of 1

Our Ref: 16/AA538/A/36

14 Jun 2021

Commissioner of Building Control


Building & Construction Authority
52 Jurong Gateway Road, #11-01
Singapore 608550

To whom it may concern,

Project Ref. No.: A817-00538-2016


PROPOSED ADDITIONS & ALTERATIONS TO EXISTING PUBLIC HOUSING
DEVELOPMENT BLOCKS 138-145 ON LOT 09117M MK22 LORONG AH SOO (HOME
IMPROVEMENT PROGRAMME) – Reply to your Written Direction on our Application for Certificate of
Statutory Clearance (CSC)
We are pleased to enclose herewith the following correspondence for the items listed in your written direction:
1. Declaration Form BCA-CSC-TOPCSCDQP is not in order in regard to Standard Requirement
item (1).
Please refer to updated file BCA-CSC-TOPCSCDQP.XFD
2. Submitted form BPD_CSC03 (Certificate of Supervision of Lightning Protection System) is obsolete.
(Please refer to our circular APPBCA-2018-09 dated 31 Oct 2018 and submit the latest Version of
CSC03 and BPD_Test Form [Ver1.0_2019] together with the as-built lightning protection plans.
Please refer to updated file 01_BCA_CSC03.pdf
3. Form BCA-BE-CTASST (Submission of as-built structural plans/calculations) and BCA-BE-
QPCTSSW (Certificates of supervision of structural works) is not in order / not submitted.
Please refer to updated file 03_C-forms status.pdf
4. Submit a list of the various types of safety barriers installed on–site and their structural
approvals (Please refer to our circular BCA BC 15.0.3 dated 4 Aug 2011).
Please refer to updated file 03_Annex A .pdf and 04_ST04 Acceptance.pdf
5. Qualified Person to confirm that the materials used on the exterior of buildings meet the performance
standard of the acceptable solutions in Clause P.2.1 “Daylight Reflectance”.
We confirm that the daylight reflectance value of the external materials used on the New Consumer
Switch rooms and Police equipment rooms meets the performance standard of the acceptable solutions
in Clause P.2.1 “Daylight Reflectance”. It is composed of a treated and painted poured concrete slab.
Hence, we tabulated below the external material used with its corresponding daylight reflectance value.
Material Item Value
Emulsion Paint on plastered wall Specular Reflectance 1.10 %
surface and roof, seamless

Please note that all conditions stated in the approved waivers under this project are complied with. We also
confirm that there are no ACMV and Lift works involved in this project.

Trust that the above are in order and we look forward to your early approval. If you have any query regarding
this project, please feel free to contact Ms. Angeline at DID: 6325-2142/ Mr. Jericho at DID: 6325-2164 or email
us at g22g@3pecotecture.com
Thank you.
Yours faithfully,

……………….………..…….....
LAU MOH LIM
B ARCH, MSIA, RIBA, RAIA
3P ECOTECTURE PTE LTD
Cc: Housing & Development Board – Mr. Alfie Foo
Fujian Chengjian Construction Corporation Limited – Mr. Casey Kuah
lml/jgg/aml