You are on page 1of 4

Irvin Exequiel B.

Litao August 31, 2021

Title: Bs Half size and One fourth size and V.C.E experiment
Materials: 10 pieces half size black sponge
20 pieces one fourth(thick)
20 pieces one fourth(thin)
68.9328g of Retaso
5 basins
Ting-ting
Plastic Molding
Beaker
Graduated Cylinder
Salinometer
Objectives: To help the evaporation of pond/salt bed in PFI
Weather: Partly Sunny, Partly Cloudy
Procedure:
step 1- I start at 8am up to 1:30pm
step 2- Prepare 5 empty basins
step 3- Put 3000mL of brine(10be) on the basins
step 4- After putting the brine on the basins, put all the materials needed on the basins
step 5- Then every 45 mins, we need to pour the sponge and V.C.E by brine(basin 2, 3, 4 and 5)
step 6- Repeat step 5 till 1:30pm
step 7- Then get the final volume and salinity of each basin with the help of Beaker, Graduated Cylinder and Salinometer
Result:

Column1 Column2 Column3 Column4 Column5 Column6 Column7 Column8 Column9 Column10
Initial Volume(mL) Final Volume(mL) Total Net Evaporation(mL) Initial Be
Basin 1 White Basin 3000 2710 280 10
Basin 2 BS 10 Half size 3000 2425 575 10
Basin 3 BS 20 one Fourth(thick) 3000 2350 650 10
Basin 4 V.C.E 3000 2450 550 10
Basin 5 BS 20 one Fourth(thin) 3000 2560 440 10

Whats Next? Try the next step give by GCK


Height(mm) Width(mm) Length(mm) Total Surface Area(mm)
one fourth thin 10.5 6.6 1 166.2
one fourth thick 10.5 2.25 2.1 96.075

TOTAL SURFACE AREA Exposed to sun/atmosphere = (H x W x 2) + (H x L x 2) + (L x W)


Column11
Final Be
12
13
13
13
12