You are on page 1of 5

Average Grade Input Grades

99 -100 1 75.9
95-98 1.25 87.5
90-94 1.50 96.5
85-89 1.75 85.5
80-84 2.00 75
75-79 2.25 Average: 84.08
70-74 2.50 Grade: 1.75
65-69 2.75
60-64 3.00
Below 5.00
Class CEMENT (in Bags) (cu. m.) (cu. m.)
Proportion
Mixture 40 kg 50 kg SAND GRAVEL (Step 1) Determine the Volum
1:1.5:3 AA 12.0 9.5 0.50 1.0 Volume = Cross sectional Area × Le
A 9.0 7.0 0.50 1.0
Volume = 𝜋 4 × (0.60 m) 2 × 6 m ×
1:2:4
1:2.5:5 B 7.5 6.0 0.50 1.0
1:3:6 C 6.0 5.0 0.50 1.0
(Step 2) Concrete Proportion:

CEMENT
40 kg 8.48
50 kg 8.48
SAND 8.48
GRAVEL 8.48
) Determine the Volume of the concrete columns:
= Cross sectional Area × Length × No. of Columns
= 𝜋 4 × (0.60 m) 2 × 6 m × 5 pcs = 8.48 cubic meters

) Concrete Proportion:

Class: A
x 9.00 = 76 bags
x 7.00 = 59 bags
x 0.50 = 4.24 cu.m
x 1.00 = 8.48 cu.m
Slab Class Mixture
Thickness 40 kg Cement 50 kg cement Sand
(cm) A B C A B C (cu. m.)
1 2 3 4 5 6 7 8
5.0 0.450 0.375 0.300 0.350 0.300 0.250 0.0250
7.5 0.675 0.563 0.450 0.525 0.450 0.375 0.0375
10.0 0.900 0.750 0.600 0.700 0.600 0.500 0.0500
12.5 1.125 0.938 0.750 0.875 0.750 0.625 0.0630
15.0 1.350 1.125 0.900 1.050 0.900 0.750 0.0750
17.5 1.575 1.313 1.050 1.225 1.050 0.875 0.0880
20.0 1.900 1.600 1.300 1.500 1.300 1.100 0.1100
22.5 2.030 1.688 1.350 1.575 1.350 1.125 0.1125
25.0 2.250 1.875 1.500 1.750 1.500 1.250 0.1250
27.5 2.475 2.063 1.650 1.925 1.650 1.375 0.1380
30.0 2.700 2.250 1.800 2.100 1.800 1.500 0.1500
Gravel
(cu. m.)
9
0.0500 (Step 1) Determine the Area of the concrete pavement:
Area = Width × Length
0.0750 Area = 3 m × 5 m = 15 square meters
0.1000
0.1250
0.1500 (Step 2) Concrete Proportion:
0.1750 CEMENT Slab Thickness: 5 cm Class: A
0.2100 40 kg 15 x 0.45 = 7 bags
0.2250 50 kg 15 x 0.35 = 5 bags
0.2500 SAND 15 x 0.025 = 0.38 cu. m.
0.2750 GRAVEL 15 x 0.050 = 0.75 cu. m.
0.3000