2.) ________________________________________________
3.) ________________________________________________
What and where are they located in relation to the intended work area?
______________________________________
2.) ________________________________________________
3.) ________________________________________________
Excavation Checklist
Any surface or prominent structure on site? (Hard Barricade around structure) Yes:
Is excavation depth greater than 1.2 Metres shall be shored or sloped Yes:
Is a Confine Space Checklist Required? (If unsure consult HSE Department) Yes:
Standby Man available if machinery being used in Hazadous areas such as cables structure etc. Yes:
Have Entry/Exit Points and Entry/Exit Stair Etc. been identified and ready to install Yes:
If excavation is excessive with dificult Entry/Exit. Complete an Emergency Rescue Plan Yes:
I declare that the information provided is accurate and the control measures listed above have been
effectively implemented.
Name/ Designation / signature: Date:
I have evaluated the PTW, associated checklist and iam satisfied that all reasonably practicable measures
have been taken effectively. (JGCS Supervisors / Work Site engineers / QC engineers / QC managers)