LHB Secondary Lateral Damper due to Silent block → Improve product quality
bushes worn out, Need to increase the Outer Dia. Of → Reduce customer complaints and in-house issues >80% Closer of Customer
12 silent block rubber bush and decrease the Inner Dia. → Improve process quality Complaints within time Weekly review of SQPR by CFT team Closed …….. QA Navneet High 01.02.2020
Of Holding Position of Silent Block .(For less wear and → Improve Product Reliability frame
tear need to improve the quality of Silent block.) → Reduce in process rejection
LHB Secondary Vertical Damper due to Silent block → Improve product quality
bushes worn out, Need to increase the Outer Dia. Of → Reduce customer complaints and in-house issues >80% Closer of Customer
13 silent block rubber bush and decrease the Inner Dia. → Improve process quality Complaints within time Weekly review of SQPR by CFT team Closed …….. QA Navneet High 01.02.2020
Of Holding Position of Silent Block .(For less wear and → Improve Product Reliability frame
tear need to improve the quality of Silent block.) → Reduce in process rejection
→ Management approval
→ Reduce manual error during inspection and reduction → List out required gauges
2 Establishmen Introduction of gauges to reduce inspection time. in inspection time . >90% achievement of Plan → Drawing preparation from PE and Yes QA Navneet High 01.02.2020
t of →Reduction in Rejection. Manufacturing of Gauges
measuremen → Procurement of gauges
t / testing
facility 008000 Classification | ESCORTS-INTERNAL
Project
Sr. Establishmen Problem Statement/Purpose Impact Expected Major actions involved Remarks Budget Dept Team Priority Start Date
t of Title Measurable Result Involved Leader
measuremen
t / testing
facility → Improve product quality 100% completion of
Full arrangement of testing facilities including all → Reduce customer complaints
48 required test benches for all products Planned activities within List out activities Yes QA Navneet High 01.02.2020
time frame
Authorization to QA to shift suspected material in →Reduction in customer complaints 100% completion within →Request generation to IT and follow till
5 Oracle from current location to different location to → Reduction in warranty failure time frame action completion …….. QA Navneet High 01.02.2020
avoid issuance / usage
27 Start thing:- If any quality issue occur during >90% Closer ( Containment Inline activity can be done by process
& assembly then segregation start from assembly line Quick containment Vs line quality issue action ) of line issue within Weekly review of Line issue quality with support from Receipt …….. QA Navneet High 01.02.2020
28 to store location time frame Inspection & SQA.
At Stores to be done by SQA.
→Reduction in Rejection.
3 Product FAI with all supporting documents for Final → Enhance product reliability by validation of Mfg. 100% achievement of Plan → List out product for FAI …….. QA Navneet High 01.02.2020
product →Define Responsibilities in team
process & product before release to production
→ Improve product quality 100% completion of
Stop Things- Unchecked (individually) CPBs should → Reduce customer complaints
34 not be coupled with DV and despatched. Planned activities within List out activities Yes QA Navneet High 01.02.2020
→ Reduce in process rejection time frame
→ Improve product quality
→ Reduce customer complaints and in-house issues >80% Closer of Rubber
35 Start Things-Quality of Rubber should be improved → Improve Product Reliability quality issue within time List out of rubber quality issue . …….. QA Navneet High 01.02.2020
immdly. Seal for CPB (Pt-196) & Seal (Pt no-77) → Reduce in process rejection frame
Completion Status as on
Date 25.01
30.05.2020
30.07.2020
30.07.2020
30.07.2020
30.07.2020
31.07.2020
30.07.2020
30.07.2020
31.07.2020
30.07.2020
30.07.2020
31.07.2020
30.07.2020
30.07.2020
30.07.2020
31.07.2020
30.07.2020
30.07.2020
30.07.2020
30.12.2020
30.04.2020
30.07.2020
30.04.2020
31.03.2020
30.05.2020
30.07.2020
30.03.2020
30.04.2020
30.03.2020
30.05.2020
30.03.2020
30.07.2020
30.03.2020
30.07.2020
30.04.2020
30.06.2020
Top
Explore the possibility to hire commodity experts
39 Managemen
(Metallurgy, Welding, Painting, Rubber, Electronics etc.)
t
81 CAPA should be adhere and close with in time frame Start thing
83 Tool & fixture inspection sholud be start before installing Start thing
84 First piece approval should be start for each component Start thing
Sr.
133 Strong "Method's Dep't" Managemen Start
t
134 Internal customer should be taken seriously All Dep't Start
Fast execution of Capex projects related with Quality
135 All Dep't Start
issues / improvements
136 Strong skill development and verification system Production Start
137 Guage R&R as system QA Head Start
138 Machines capabilities Production Start
QA&Producti
139 Thorough "Shop petrolling check sheets" Start
on
Surface finish of castings should be better for good paint
140 Purchase Start
aesthetics
Proper CAPA for quality issues & horizontal deployment
141 Plant level Start
of same
142 Proper coordination between RI & Process QA QA Head Start
143 Start "Quality circles" across plant level Plant level Start
144 Celebrate "Quality Month" atleast once a year Plant level Start
145 Self certification for quality by Operator Production Start
Production Norms/Shift should be based on "Ok pcs
146 Production Start
manufacturing" only
147 "4 M change register" concept across the plant All Dep't Start
151 Avoid excess material . Material flow must be in sets . Purchase Expectation
Purchase /
166 New Mould and fixture for Brake Pad- Project production
Purchase /
167 K coach insert removal m/c -5 nos
production
Project Name
5
5
4
0
1
6
4
4
1
4
1
4
4
4
1
9
9
7
4
4
7