CLIENT :- M/s . ASP chem. equipments Report Date : 8/10/2021
Vendor : M/s.Chempro & Pharmach Equipments P.O :- 1702/2021-22 Equipment : SS 316 Vent Condenser E-106 & E- Person Contacted :- Mr. Vikram Shulkla 206 (3.59 M2) & MS Vent Condenser E-101, E-201 (3.59 M2) Stage Inspection Location : Vasai , Gavraipada Sr. No Description Remarks Visited M/s. M/s.Chempro & Pharmach Equipments For inspection Of SS 316 Vent Condenser E-106 & E-206 (3.59 M2) & MS Vent Condenser E-101, E-201 (3.59 M2)
1) E-106 Progress Status
1) Shell With tubesheet ready with assembly – Refer Attached Remark : Some under cut noticed near tubesheet to be Photograph rectify and offer before hydro 2) Equipment dimensionally checked – Some deviation found (N2 Nozzle should be 125 mm away from RHS Tubesheet – Actual measured 115 mm ) Approval to be taken 3) Bonnet shell not ready yet As per vendor it will be ready by tomorrow (i.e 09/10/2021) 4) Moly test carried out at various area found ok Refer Attached Photograph
2) E-206 Progress Status
1) Shell is ready With tubesheet bundle ready Baffle spacing measured and found OK Moly test carried out at various area found ok Remark : Some under cut noticed near on nozzle area to be rectify and offer before hydro & proceeding further 2) Equipment dimensionally checked – Some deviation found (N2 Nozzle should be 125 mm away from RHS Tubesheet – Actual measured 115 mm ) Approval to be taken 3) Bonnet shell not ready yet will be ready by tomorrow (i.e 09/10/2021)
3) E-101 Progress Status
1) Shell With tubesheet ready with assembly – Refer Attached 2) Equipment dimensionally checked – Some deviation Photograph found (N6 & N2 Nozzle should be 105 mm away from Tubesheet – Actual measured 90 mm & 93 mm Respectively ) Approval to be taken 3) Bonnet shell not ready yet As per vendor it will be ready by tomorrow (i.e 09/10/2021) For M/s . ASP chem. Equipments For M/s.Chempro & Pharmach Equipments
Mr. AnkitSura Mr. Vikram Shulkla
Inspection report
E-201 Progress Status
4) 1) Shell With tubesheet ready with assembly – 2) Equipment dimensionally checked – Some deviation Refer Attached found (N6 & N2 Nozzle should be 105 mm away from Photograph Tubesheet – Actual measured 90 mm & 93 mm Respectively ) Approval to be taken Bonnet shell not ready yet As per vendor it will be ready by tomorrow (i.e 09/10/2021)
There are some points discussed with vendor
1) Client to be confirm whether arc welding or filler wire to be used for saddle support welding 2) Earthing boss will be provided by Client 3) Expansion should be done by M/s ASP Chem before proceeding for hydro 4) Material Stamped “ “ For identification