You are on page 1of 3
NATIONAL TRANSMISSION & DESPATCH CO. LTD DEPUTY MANAGER S0OKV GS: N0.1923- 4/ /DM/SOOKVRYK/SD DATED:__).9__/09/2021 The Director NPCC, Sector H-8/1, Pitras Bukhari Road, Islamabad. Subject: REQUEST FOR APPROVAL OF SHUTDOWN AT 500KV GRID STATION RAHIM YAR KHAN Regarding above cited subject, it is submitted that this office has applied for annual preventive maintenance schedule for maintenance and protection testing purposes at SOOKV Grid Station NTDC Rahim Yar Khan. The shutdown Noting has been forwarded for necessary approval to NPCC vide 0/O GM AM (North) U.O No. 1547 dated: 13-09-2021 (copy attached). This office has already availed shutdowns on SO0kV RYK-Multan T/L and 500kV RYK- ‘Guddu 747 MW T/L as per approved schedule. However, shutdowns on the Shunt Reactors of both above cited T/Ls was not approved, thus requisite maintenance & protection testing is pending. As above requested shutdown involves only Shunt Reactors controlled by independent CBs, respective T/Lines operation will not be affected. It is therefore requested to accord approval on the Shunt Reactors as per following schedule please: © | Name of Equipment Hee | 2 Dae Time | Remarks 3x3 7MVAR 500kV RYK- 30-09-2021 | 07:00hrs 1 | Guddu 747MW T/L Shunt B6Q4 to to - Reactor 01-10-2021 | 17:00hrs 3 | 337MVAR SOOKV RYK- fo ee ieee i : Multan T/L Shunt Reactor ren Le DEPUTY MANAGER S00KV GRID STATION NTDC RAHIM YAR KHAN CC to:- 1- The Chief Engineer AM (North) Region NTDC, Multan. 2- The Superintending Engineer S00kV AM (North) Circle NTDC, Multan. Dy. Mngr. Division SOOKV Grid Station NTDC, KLP Road near Sardargarh, Rahim Yar Khan Email: dm500kvrvk@gmail.com, Mob.# 0333-7401579 Scanned ith CamScanner y.0.Nq 42 Datteat Deputy Manager S00kV Grid Station NTDC RYK Page-1 Subject: SHUTDOWNS IN RESPECT OF S00KY G/S NTDC RAHIM YAR KHAN 1. this submitted that following shutdowns are required for annual preventive maintenance of substation equipment (testing, tightening, cleaning & washing) and protection testing of relays at 'S00kV Grid Station NTDC Rahim Yar Khan as per schedule given below: St | Name of Equipment | _ Date Cones Load Management 20092021 te to B7Q1, B7Q3 21-09-2021 ‘3x37MVAR S00kV_ 22-09-2021 2. | RVK-Moltan T/L fs BIQ4 Shunt Reactor 2309-2021 ‘As per system prevailing ‘S00kV RYK-Guddu 27-09-2021 : : conditions, | 747MW TIL 2» 16Q1, BEQS 28-09-2021 3x37MVAR S00kV 29-09-2021 4. | RYK-Guddu 747™MW | 0 B6Qs TiLShunt Reactor | 30-09-2021 : = No Supply will be affected 5, | Sook Bus Bard | 05-10-2021 SQL. BQH: | asthe load willbe shied 0 SOOkV Bus Bar-L No Supply will be affected wg eee, | Pye wilte shied Sony busbar Re Sophy wl bs aed 6. | SOOkV Bus Bar-lI | 06-10-2021 >, | savacy amv | TG! 3602, 603. | Pad wl shld 0 ‘Auto TF ATB-02— | 44.19.2921 D3QH,D3O3 | rn.03 oF | souzauxy eooneva | NO! 7G, B7QD, | NOSumy wil Beate ‘Auto VF ATB-03— | 91.49.2021 DsQl, D4Q3 25-102021 o, | SQRVRVEMO® | Tg 50), 1509 26-10-2021 Aspe system prevailing SIMVAR SOO | 27-10-2001 | 0850 conditions 10. | RYK-Moro T/L to BSQ4 to ‘Shunt Reactor 28-10-2021 | _17:00 2, Its therefore requested to approach quarter concemed for the approval/ arrangement of above tabulated shutdowns in the interest of system please. ol-O-202 DEPUTY MANA‘ S00KV GRID STATION NTDC RAHIM YAR KHAN 3, | supERINTENDING 500KV AM (NORTH) CIRCLE NTDC MULTAN to, | forumvolad wile Ie vesutl ty afprach jhe Jiu br Cone agnt Wt MP me ersrtyy PPT afprrval) plese f , \, | cummrenc Re seni On ins Submilek wit wih tte request to approach ahoye SHE Gm (nPce> to arrange appro o Yo.ale.Sieg Sutton preg CEA ‘ pean Cacttuned tape rs TDC Multan ' : a ® Deputy Manager 500kV Grid Station NTDC RYK Page-2 ToC Lahore ‘fe GAA (ARN Harth MTOC Lahore

You might also like