Data Collection Review

Copyright © TWI Ltd 2010


Pre-mobilisation Information

•Pipe Diameter & Wall Thickness?


•Coating / Insulation?
•Buried Line?
•Contents – Pressure & Temperature?
•Geometry – Bends / Supports / Clamps?
•Age / Environment?

Copyright © TWI Ltd 2010


•Location – At Height / Confined Space?
Tooling Checks

• Visual Check

• Longitudinal Ring Spacing?

• Capacitance Check

Copyright © TWI Ltd 2010


Tool Location

• Ideally minimum of 1m from any Pipe feature


• Flanges?
• 1/3 2/3 position on spool length
• Dead Zone?
• Thickness check at cardinal points
• Visual check – surface condition?

Copyright © TWI Ltd 2010


Surface Condition

• External Corrosion
• Loose Paint / Rust / Oil & Grease
• Polished / Buffed / Grit Blasted?

Copyright © TWI Ltd 2010


• Consider re-locating the tool
Datum Selection

• Why is a Datum important?

• What can we use for Datums?

• Datum Measuring

Copyright © TWI Ltd 2010


• Explanation of Datum
Normalisation

• Automatic or Manual?

• When might Manual be preferred?

• Unbalanced Tool Warning

Copyright © TWI Ltd 2010


• Using ‘Unity’?
Additional Tests

• What are they and when are they required?

•Focusing

•Extra frequencies

•Changing the pulse length

Copyright © TWI Ltd 2010


•Frequency sweep
Data Handling

• Why is Data Handling important?

• Save Data with unique file names


• Copy files to removable media before moving
to next location - .tt2 and .zip files
• Back up collected Data after every shift
including any photographs

Copyright © TWI Ltd 2010


Data Collection Review - Overview

•Pre-mobilisation Information
•Tooling Checks
•Tool Location
•Surface Condition
•Datum Selection
•Normalisation
•Additional Tests

Copyright © TWI Ltd 2010


•Data Handling