Quality Site Training Report
Jazan Refinery & Terminal Project (EPC 10 & 11)
AGENDA:
" INSTALLATION
REQUIREMENTS FOR FIRECLAY
BRICKS, STORAGE AND
HANDLING PROCEDURE "Quality Site Training Report
Jazan Refinery & Terminal Project (EPC 10 & 11)
What are instal
Expansion joints shall be provided in both vertical an horizontal directions of wal, at wall edges,
around burner tes, and doors.
«Floor brick shal not be mortared, A1.3 cm gap fo expansion shal be providedon 1.8 meter interval.
‘This gap maybe packed with flsous rlractory materia in stip, not loose bulk form.
« Priorto placement, fireclay bricks shale protected from mechanical damage
i ‘The Refractory Manufacture’ precautions, as specied on the MSDS sheets, must be strictly followed.
How is installation of fireclay bricks, storage and handling procedure?
- Manufacturers netallton Procedure
Saud Aramco Engineering Standard
+ Saud Aramco Standard Drawing
= APIS Standard
| Method StatementQuality Site Training Report fa
Jazan Refinery & Terminal Project (EPC 10 & 11)
When isthe training forthe irements for fieclay bricks, storage and handling procedure?
installation requirements for fireclay bricks, storage and handling procedure Is conducted on 14th of
January 2017 near I-20 F-24100 (EPC-10),
Who attended the cements for fireclay bricks, storage and
‘APPENDIX OL - SITE TRAINING REPORT (attached herewith)ti
TranerName: icon) CHET
SPECIOR
Fr Eg orton ne
FARUK ABDULLA KHAN
Jann Roe, boi Projet EPS 108 #8)
ADPENDDCO1 SIE TRAINING REPORT
‘Supervicer
Asbo
SRK agen
Selefana2 Kran
Mahwuddin Ser
[Abul Harton iehow
a aah
‘Tienda earner
AKWlesk Rr. Singh
elelelelel=
Mahaonmed Rashid]
ac
Rejoul Nasu
Poriem vagy
STE TRAINING REPORT ATTENDANCE
page's