j i \ Quality Site Training Report Jazan Refinery & Terminal Project (EPC 10 & 11) AGENDA: " INSTALLATION REQUIREMENTS FOR FIRECLAY BRICKS, STORAGE AND HANDLING PROCEDURE " Quality Site Training Report Jazan Refinery & Terminal Project (EPC 10 & 11) What are instal Expansion joints shall be provided in both vertical an horizontal directions of wal, at wall edges, around burner tes, and doors. «Floor brick shal not be mortared, A1.3 cm gap fo expansion shal be providedon 1.8 meter interval. ‘This gap maybe packed with flsous rlractory materia in stip, not loose bulk form. « Priorto placement, fireclay bricks shale protected from mechanical damage i ‘The Refractory Manufacture’ precautions, as specied on the MSDS sheets, must be strictly followed. How is installation of fireclay bricks, storage and handling procedure? - Manufacturers netallton Procedure Saud Aramco Engineering Standard + Saud Aramco Standard Drawing = APIS Standard | Method Statement Quality Site Training Report fa Jazan Refinery & Terminal Project (EPC 10 & 11) When isthe training forthe irements for fieclay bricks, storage and handling procedure? installation requirements for fireclay bricks, storage and handling procedure Is conducted on 14th of January 2017 near I-20 F-24100 (EPC-10), Who attended the cements for fireclay bricks, storage and ‘APPENDIX OL - SITE TRAINING REPORT (attached herewith) ti TranerName: icon) CHET SPECIOR Fr Eg orton ne FARUK ABDULLA KHAN Jann Roe, boi Projet EPS 108 #8) ADPENDDCO1 SIE TRAINING REPORT ‘Supervicer Asbo SRK agen Selefana2 Kran Mahwuddin Ser [Abul Harton iehow a aah ‘Tienda earner AKWlesk Rr. Singh elelelelel= Mahaonmed Rashid] ac Rejoul Nasu Poriem vagy STE TRAINING REPORT ATTENDANCE page's

You might also like