You are on page 1of 5
Phone: 497% 4000. 177 CITY GATE infogeitygate-group.com wwweitygate-group.com OSPTALTY & HOTEL MANAGEMENT P.O, BoxT359 | CR, No. 158722 CERTIFICATE OF WORK COMPLETION In accordance to the general condition of our contract agreements we hereby issue the project completion certificate for the Plumbing Work executed by RSS Trading and Contracting WL, as per final inspection and testing in the line of the below-mentioned contracts. RSS Trading and Contracting WLL, has completed their works within the given time period and maintained high quality of workmanship and professional services delivery. Plumbing Contractor |RSS TRADING AND CONTRACTING WLL 2 ‘Award Date: Project RefNo | 1008-CGH-RSS-2021 | 157992091 1, Plumbing and Sanitary System 2. Active lealk test and modification 3. Water pressure test and modification Project Title 4. Valve test and modification 5. Water heater testing and modification 6, Drainage system testing and modification 77. Supply and installation of material Project Completed Dato. 14/09/2021 Shazad Mughal Chief Executive Office Date Issued: 30-September, 2021 = Phone: +974 4461 4806 CITY GATE wruveclygate-notelcarn osPALTY HOTEL MCE ho BowiB8o [eR No. atte 24 Testing and operationas per the 80Q attached at annexure 1 and withthe offer letter dated 15/05/2021 wth reference RSSTC-SUB/MEP-2021-181 (hereinafter referred to as Works") 3._EFFECTIVE DATE [I The Contract shall bacome effective upon signing the Contact By the parties and the effective date shall e the date ofthe Contract. 3.2 Any part of work done prior to contract will be deemed and to have been performed pursuant to ths contract 33. The Contractor shall provide a security cheque (“Security Cheque”) with same value as the advance payment of 50% of Project Value in the name ofthe client. The Security Cheque’ tobe issues from the parent company f the Contractor with detals s follows: ‘© Company ame: SPECIALISED MACHINERY SUPPLY CO. + Registration No: 25084 + Bank Account No: 4050.666826.003 YYMENT TERMS AND BILLING “1 The cost of work as determined by the 800 is QAR 380,000.00 (datar Riyal Three ‘Hundred Eighty Thousand only) as lump sum amount (hereinafter referred to as "Project, Value"), the details 3f which is given in the 800. attached RSSTC-SUB/MEP.2021-181, Dated 15/05/2023 PLUMBING AND SANITARY Description 2) PLUMBING AND SANITARY system 2) visting Plumbing ystems Active Leaks Test and Modification, 3) Existing Plumbing ystemsWator Pressure Tost and Molton, 4) eng Plumbing Systems Checking Valves for Cortect Operation 5) isting Water Heater sysims inspection and Modification, 65) isting Water Drainage ystems inspection and Molfiction. 7). iting Dangers of Improper Bacllow Prevention inspection and Modficton. £8) Complete Sanitary Stem Inspection and Msifation 9}, Sum pum Suppl ad instalation, A. Testing and operatic all HVAC System. {otal ump sum Amount ‘aRs:300 000,00 (Qatar Rial Three Hundred Eighty Thousand onl, 42 The payment procecure shal be as follows: 41) Advance Payment ("Advance Payment”) shall be 50% of the Project Value agajist the submission ofthe Invoice and paid prior to start the Works. —Fi ‘Clen’ntiae Page 20f5, conyfcir’ ntals CITY GATE inisbeyaste eacon 2} 20% of Project Value shal be paid after completion 50% works. 3) 20% of Project Value shal be paid after completion 75% works 4) 59 Balance amount of the Project Value shall be paid after 100% hand our complete project. 5} 5% Balance amount of the Project Value shall be paid ater 120 days hand our complete project. ‘The Contractor shall provide a security cheque ("Security Cheque") with same vakie ae the advance payment of 50% of Project Value in the name of the client, 5._DELIVERABLES AND PENALTIES ‘5A The Works shall be completed within 60 days of date of Advance Payment, and this shall be considered asthe duration ofthe Project (*Duraton’) 5.2 tf the Contractor, dve to his Sole default, falls to complete the Works by the Date of Complete, the Contractor will be liable to pay penalties as follows: 53 Penalty of QAR 2,000 / day past the Date of Completion Penalties accumulating to ‘maximum 102% ofthe Project Value 6._WARRANTY ‘GA Contractor shal prone a Lyear warranty ems that installed by him from the date of completion. 7. CONTRACTOR OBLIGATIONS 7A__The Contractor shall be responsible Tor the Works as Stipulated under BOO. ASST < SUB/IEP-2021-179 swell as adhere tothe demanded rate of progress forthe Works. 1.2 The Contractor hall Comply wth al reasonable instructions nd directions given tot by ‘the Cient in writing and shall ot act upon any instructions a directions ofa third party without receiving prior writen authorization rom the Cent. 7.3. The Contractor shaltake al reasonable steps to ensure that it completes the Works in time manner. 7.4 The Contractor shall ensure that its personnel is competent o carry out the Works and willbe caved outwith due diligence andin a werkmarlite manner to the satisfaction of the Cent and shal comply with applicable standard, procedures, quality contol requirements and any other reasonable operational requirements. 7.5. The Contractor shall keep the cent fly and prope Informed onal aspects ofthe ‘Works and promptly provide the Client with such information, reports and comments relating tothe Worksas it may request from time to time. 76 The Contractor shal ep the Project te eof any wreckage, BB, ote dbs arising out of orn connection with the Works \ 17 The Contador shal esr that no damage done to the ei strcre of he Project other than what is necessary forthe completion ofthe Woks. Any adiona or _e (lent nls Page 3of5 onions CITY GATE iiceepate tl son osbrALIY ANOTEL ANAC P.O. Box 1359 | CR. No, oame adjacent damage dore by the Contractor orits personnel may be atrbuted to Contractor and the lent wil recover the damage costs from the Contractor. 7.8 The Contractor shall ensure that all manpower and labor used in the fulfilment of the ‘Works i legal and insured. Contractor shall ensure proper safety and Industry practices In place to avoid such damages tothe best extent. In case of any acidents related tothe ‘manpower and commissioning of the Works shall be the sole responsibilty of the Contractor. 7.9 The Contractor shall uly notify the Clientin the fllowing cases: ‘© Any defects which are not attributable to the Works in accordance with this Contract oF tony fllure of Contractor to comply with this obligation under this contract ‘Any under covering or testing which does not establish the Works in accordance to this, contract 7.40 Ifthe Contractor does nat comply within 7 days of notice given by Client, the Client may catty out all the necessary work and recover the cost from the Contractor or set off balance amount agaist tothe Contractor. ‘8. CONFIDENTIALITY All Proprietary Information disclosed by one Party to the other Party hereunder shall be ‘maintained in confidence ard shall not be disclosed to any Third Party or used for any purpose ‘except as expressly permitted without the prior writen consent ofthe Party that disclosed the Proprietary information to the other Party during the term ofthis Agreement. This Agreement shall not be bound by any nen-lsclosure when regulatory agencies require such disclosure, 9, ENTIRE AGREEMENT ‘This Agreement represents the entire and integrated Agreement between the Parties and “supersedes all prior negotiations, representations, or Agreement, ether written or oral, regarding the business contemplated hereby. Ths Agreement maybe amended only by writen instrument signed by the artes to this Agreement. 10, GOVERNING LAW AND JURISDICTION 10.1 This Agreement and any dispute arising out oft shall be governed by and construed in ‘accordance withthe las ofthe State of Qatar. 102 Good faith In the event of any dispute or diference arising between the Parties out of lor relating tothe Agreement orto any breach oft, one ofthe Parties shall serve Dispute Notice of such dispute on the other Party to the dispute which shal identify the disputed) Page aot Phone: 97% 4461 4884 CITY GATE onweciygate-hotel-com RPA NOTE MAcEMENT box go ee No doa 10008 CGH Rs and negotiate with exch other, in good faith and understanding of their mutual interests, ‘to each a just and equitable solution satisfactory tothe relevant partes 103 any Dispute arses hetween the Parties where such Dispute is not resolved pursuant to ‘above clause within fifteen (15] days of the date ofthe Dispute Notice or such longer period as the Parties may agree in writing, then elther Party may refer the Dispute tothe Chill and Commercial Courts of Qatar for final resolution. 211, ATTACHMENTS TO THE AGREEMENT. = Contractor Commercial Registration. ‘© Parent Company Commercial Registration = Contractor Offer Letter and 800 RSSTC-SUB/MEP.2021-181 SIGNATURE IN WITNESS WHEREOF the parties hereto have duly executed this Agreament this onthe date ‘mentioned inthe beginning af this Contract. Iie'Sheikh Aimed Mohammed JM ALThani ‘ity Gate Hotel Pte nao ASS TRADING AND CONTRACTING lent’ rials Page Sof Contractor's nas

You might also like