You are on page 1of 3
JAS + 20RI-06D007 June 18,2021 ‘To: Engr. Emmanuel Flores Plant Director, Big Boss Cement Inc. ‘Thru: Aldaemuz Kontruet Ine, Construction Manager Subject: Subject For Information ood Day! ‘We would lke to send this letter as a reminder to aur client that the current condition of our area along the Cable Tray structure (Raceway & Feeder of Lin 4) ‘Te Cable Tray structure sat risk of damage ance the loader of raw materials acidentally over estimate the clearance between the loader’s bucket and the Cable Tray suppor structure due tolimited visibility during the material hauling ‘The Cable Tray structure is also not design to carry superimpose and lateral load induced by the material stockpile and upon scraping of the loader against the structure during the hauling ‘of materials tobe use in Line & operation/production. ‘The Cable Tray structure must be free from any materials to prevent from corosion due tothe impact ofthe abrasive materi nthe long run ‘We look forward to immediate action for this to prevent damages to the property and eliminate the risk involve, ‘Should you have any concern ar clarification to this matter, fel free to let us know. a0 (aan) roe ‘ARCHITECT 7s (en Ca

You might also like