SITE ID : KLB00455

SITE NAME : NANGA NYURUH

TOWER HEIGHT : GUYED MAST 18M

ADDRESS : Desa. Nanga Nyuruh, Kec. Ella Hilir


Kab. Melawi, Provinsi Kalimantan Barat

COORDINATE : LONG
LAT
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

01
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
GPS ELV + 4.0M
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G

4000 4000 Nama Gambar


Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

02
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

03
600
50 100 100 100 100 100 50

100 50
300 600 300 20-D16
A A
- TOP BAR D16-200 -
300

100
PENGIKAT ANGKUR
BOTTOM BAR D16-200

BOTTOM BAR D16-200

600
100
TOP BAR D16-200

100
1200
COLOR CODE
600

50 100
300

4-D16(spacer)

Keterangan
Note
1200
FOUNDATION LAYOUT MAIN TOWER
SCALE NTS

BAKTI

300 600 300


EL.(+) 0.50
20-D16
B
-
500

Tanggal
Date

COMPACTED COMPACTED
BACKFILL SOIL BACKFILL SOIL
DRAWING APPROVAL
KEMITRAAN APPROVE
2000

PMO BAKTI
1200

Tanggal Tanggal
Date Date

SPASER D16-200
4-D16
EL.(-) 1.20
GUYED MAST 18M
300

Nama Proyek
EL.(-) 1.50 Project Name
BAKTI - LTE 4G
50

LEAN CONCRETE
50mm NOTE : Nama Gambar
Drawing Name
100

1200
COMPACTED SAND
100mm Reinforcement shall be use : Site name Site ID
Deformed bar : Fy Site Nama Site ID

Fu NANGA NYURUH KLB00455


Plain bar : Fy Kordinat Hub Revisi
Coordinated Hub
Fu Revision

Concrete shall be use : Ref. Peta


Map Ref.
No. Gambar
Drawing No.

f 'c = 18.675 MPa


Arah Skala
Direction Scale

Please use the proper method during construction As shown


according to correct standard Halaman
Page
All dimension are in mm 04
600
50 100 100 100 100 100 50
500 600 500

100 50
20-D16

A BOTTOM BAR D16-200 A


500

- -

100
PENGIKAT ANGKUR
TOP BAR D16-200

BOTTOM BAR D16-200

600
COLOR CODE

100
TOP BAR D16-200

100
1600
600

50 100
Keterangan
Note
500

4-D16(spacer)

1600 BAKTI

FOUNDATION LAYOUT MAIN TOWER


SCALE NTS
500 600 500
EL.(+) 0.50
20-D16
B
-
500

Tanggal
Date

DRAWING APPROVAL
COMPACTED COMPACTED KEMITRAAN APPROVE
BACKFILL SOIL BACKFILL SOIL PMO BAKTI
2000
1200

Tanggal Tanggal
Date Date

D16-200
SPASER
4-D16 GUYED MAST 18M
EL.(-) 1.20
Nama Proyek
Project Name
300

BAKTI - LTE 4G
EL.(-) 1.50 Nama Gambar
50

Drawing Name
LEAN CONCRETE
50mm
1600 Site name Site ID
COMPACTED SAND Site Nama Site ID
100

100mm NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

05
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

06
OBL

COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

GPS ELV + 4.0M


DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

07
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

08
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

09
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

10
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

11
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

12
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

13
COLOR CODE

Keterangan
Note

75
BAKTI

r1
Tanggal
Date

14
DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

14
COLOR CODE

Keterangan
Note

75
BAKTI

r1
Tanggal
Date

14

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

15
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

16
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

17
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

18
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G

NOTE : Nama Gambar


Drawing Name

Reinforcement shall be use : Site name Site ID


Deformed bar : Fy Site Nama Site ID

Fu NANGA NYURUH KLB00455


Plain bar : Fy Kordinat Hub Revisi
Coordinated Hub Revision
Fu

Concrete shall be use : Ref. Peta


Map Ref.
No. Gambar
Drawing No.

f 'c = 18.675 MPa


Arah Skala
Direction Scale

Please use the proper method during construction As shown


according to correct standard Halaman
Page

19
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

20
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

21
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

22
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

23
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

24
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

25
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

26
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

27
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

28
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

29
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

30
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

31
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

32
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

33
COLOR CODE

Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

34
70
Support
Channel

to Lampu
to OBL

Taman

Bus Bar Grounding


Positif Busbar
Schneider

THICKNESS 5mm 4A

OFF

Support
SAFETY
PADLOCK

COLOR CODE

PG16 PG16 PG16 PG16 PG16 PG16

FRONT VIEW INSIDE VIEW SIDE VIEW 70


Keterangan

31
Note

SAFETY 10 35 230
PADLOCK 60mm

BAKTI

PG16 PG16 PG16


BRACKET BOX PANEL

MCB 2A 1P, 6kA


BOTTOM VIEW MAIN INPUT TO OBL
MCB 4A 1P, 6kA
PHOTOCELL 35
PANEL SCC
Tanggal

60
MCB 2A 1P, 6kA Date

35
TO Lampu Taman
Positif Bar
DRAWING APPROVAL
DC ARRESTER KEMITRAAN APPROVE
BRACKET BOX PANEL PMO BAKTI

Tanggal Tanggal
Date Date

SPESIFIKASI PANEL OBL Nama Proyek


GUYED MAST 18M

Project Name
NO DESCRIPTION TYPE BRAND QTY UNIT REMARK BAKTI - LTE 4G
Nama Gambar
Plate SPCC 2mm, Powder Unit
Drawing Name
1 BOX W250xH350xD120+Canopy PT.Indomitra Global 1
Coating RAL 7032
Site name Site ID

2 MCB 1P, 4A, 6kA for Main Input iK60N Schneider 1 Pcs Site Nama Site ID

NANGA NYURUH KLB00455

3 MCB 1P, 2A, 6kA for OBL & Lampu Taman iK60N Schneider 2 Pcs Kordinat Hub
Coordinated Hub
Revisi
Revision

4 Photocell Electric 6A, 48VDC Lumina 1 Pcs Ref. Peta No. Gambar
Map Ref. Drawing No.

5 Arrester DC 75V, C/2 OBO 1 Set Arah Skala


Direction Scale

6 Cooper Bar 100x10x3mm Import 2 Pcs As shown


Halaman
Page

35
OBL
18m

NO Deskripsi Unit Jumlah Dimensi (L*W*H) Keterangan

1 Kamera Set 2

2 NVR Set 1

3 Lampu Taman Set 1

COLOR CODE
1. Pemancar luar ruangan terdiri dari 2 kamera pengintai dan 1 perangkat NVR.
Sebuah kamera akan digunakan untuk memantau kabinet stasiun BTS,
memantau status peralatan dan anti-pencurian
Kamera lain akan digunakan untuk memantau lingkungan sekitar stasiun BTS
posisi pemasangan ditentukan sekitar 3-5 meter di atas permukaan tanah.
2. Lampu Penjaga ditenagai oleh panel surya produk itu sendiri .
Keterangan
Note

BAKTI

Tanggal
Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

6m LAMPU TAMAN

5m GUYED MAST 18M


Camera 2
GPS ELV + 4.0M Sudut Pandang Kamera pada Perangkat
Camera 1 Nama Proyek
Project Name
Mengawasi Sekitar Pagar & BAKTI - LTE 4G
Pintu Masuk
Nama Gambar
3m Drawing Name

Fence PAGAR Site name Site ID


Site Nama Site ID

Cabinet1Cabinet2 NANGA NYURUH KLB00455


X

X
X

X
X

Kordinat Hub Revisi


X

X
X

Coordinated Hub Revision


X

X
X

0m
X

X
X

X
X

Ref. Peta No. Gambar


Map Ref. Drawing No.

CCTV
Arah Skala
Direction Scale

As shown
Halaman
Page

36
COLOR CODE

Keterangan
Note

BAKTI

Solar Solar Tanggal

Controller Battery Date

DRAWING APPROVAL
KEMITRAAN APPROVE
PMO BAKTI

Tanggal Tanggal
Date Date

GUYED MAST 18M

Nama Proyek
Project Name
BAKTI - LTE 4G
Nama Gambar
Drawing Name

Site name Site ID


Site Nama Site ID

NANGA NYURUH KLB00455

Kordinat Hub Revisi


Coordinated Hub Revision

Ref. Peta No. Gambar


Map Ref. Drawing No.

Arah Skala
Direction Scale

As shown
Halaman
Page

37

You might also like