CHECKLIST FOR EXCAVATION

Project / Job No: Location: Villa no

Project Name: Area / Quantity:

Drawing No: Date:

S.No DESCRIPTION YES NO NA REMARKS

1 Is the soil investigation report available on-site?


Are the latest "Good for Construction" drawings
2 available?
Is the LAYOUT, ALIGNMENT AND SIZE of
Excavation marked on the ground as per excavation
3 plan
Have Temporary bench marks ( TBM) been
4 established?
Are all the requirements met for maintaining
5 dewatering?
Has the required depth of excavation been
6 achieved?
Has proper shoring and strutting been done in loose
7 soils?
Any Ground water seepage observed? If yes, special
8 approved soil strengthening treatment to be done.
Check whether FOUNDING STRATA is suitable for
laying PCC i.e., free from any soft pockets, Black
soil, loose soil etc. (if NO, remove soft pockets and
9 fill with Lean Concrete/Sand.
Check for STABILITY of Side Slopes. Is it
10 acceptable?
Is the excavation barricaded at a distance of 1
11 meter?

Comments:

Checked by: (Artha) Checked & Approved by: (DU)

ARTHA/DU/CHECKLIST/No.001/Rev 0