Professional Documents
Culture Documents
ATIENZA
1801-002915
DIAGRAM OF SANITARY LINES
SCHOOL OF ENGINEERING
NOTE: AS MUCH AS POSSIBLE, CONCRETE
CATCH BASINS SHOULD BE LOCATED AT THE
BASE OF DOWNSPOUTS THAT DRAIN RAIN AND
WASTE WATER FROM THE ROOF AND OTHER PARTS
OF BUILDINGS.
P DIAGRAM OF SANITARY LINES
3 SCALE 1:100 METERS