PIVOT PAD CONSTRUCTION
C. Non-Towable High Profile Pivots
L. The Pivot Pad should be formed directly over the steel stake marking the center of the field.
2. ‘The forms should be square with the field unless the well has already been dug The pad should
then be formed to allow the pump discharge pipe to cross in the middle of one of the four sides.
The Pivot Pad should be formed on the level.
3. Dig and form pad following the Figure below. The Anchor Bolts shonld extend 2" above the
concrete. The Pivot Pad requires 8 to 8 1/4 yards of concrete. The concrete should be 2500
psi minimum strength
A- Z(TYP)-4 Sa
pe
[ZS ee reene,
i t
fiat Wat
11-0" ) CTION A-A
v7 3/e'| |
RECONUENDED N UGH SOL,
Syste.
ef
ad
9-7 3" ——
ae