Professional Documents
Culture Documents
5 m
0.15 m
1.0 m
1.15 m
0.4 m
1.5 m
m
.0 0.4 m
1.2 m
20
0.15 m
1.0 m
0.35 m
0.6 m
0.7m 0.17 m
0.2 m
0.5 m 0.5 m
2.30 m
1.0 m
1.0 m
0.55 m
0.3 m 0.3 m
R/F Detail of U Section R/F Detail of U Coloum R/F Detail of Capping Beam U.G.A.R.WEERAWANSA
D.O.A
Eng.N.KIRUSHNARUPAN
C.E
DIRECTOR OF IRRIGATION
POLONNARUWA
IRRIGATION DEPARTMENT
0.3 m ELAHERA DIVISION POLONNARUWA RANGE
Y12-12-125mm C/C 1.5 m POLONNARUWA IMPROVEMENT DEVELOPMENT PROJECT
Y12-11-125mm C/C
CONSTRUCTION OF BOX CULVERT NEAR FC10/1 CANAL
IN SIRIKADUYAYA
R/F Detail of Footing
DATE:- SHEET 01 OF 01 DRWG.NO:-