Professional Documents
Culture Documents
Perhitungan Polonium Biota Ambon - Sorong
Perhitungan Polonium Biota Ambon - Sorong
[𝐵𝑞/𝑔]∙𝑚[𝑔]∙𝑓_𝑡𝑟𝑎𝑐𝑒𝑟
𝑓_1=
𝑓_1= (1−𝑒^(−( 210𝑃𝑜)∙ 〖𝑡 〗
𝐴(210 𝑃𝑜),𝑐𝑜𝑢𝑛𝑡𝑖𝑛𝑔 𝑑𝑎𝑡𝑒
_(𝑐𝑜𝑢𝑛𝑡𝑖𝑛𝑔 𝑡𝑖𝑚𝑒)
(1−𝑒^(−( 210
𝑃𝑜)∙𝑡_(𝑐𝑜𝑢𝑛𝑡𝑖𝑛𝑔
(
210
𝑃𝑜))/(𝑁 𝑛𝑒𝑡(209𝑃
))/(())/((
𝑡𝑖𝑚𝑒) 210
𝑃𝑜)∙𝑡_(
210
𝑃𝑜)∙𝑡_(𝑐𝑜𝑢𝑛𝑡𝑖𝑛𝑔
𝑐𝑜𝑢𝑛𝑡𝑖𝑛𝑔 𝑡𝑖𝑚𝑒)𝑡𝑖𝑚 )
)
Correction factor f2 for Po-210 decay between separation/deposition start date and counting start date
𝐴(21
𝑓_2= 𝑒^(−(210𝑃𝑜) ∙𝑡 (𝑐𝑜𝑢𝑛𝑡𝑖𝑛𝑔 𝑑𝑎𝑡𝑒−
)
𝑑𝑎𝑡𝑒))
Correction factor f3 for Pb-210 (Po-210) decay between sampling date and separation date
𝜎(𝑘=2)=𝐴(210𝑃𝑜)∙2∙ √((1/√(𝑁 𝑛𝑒𝑡(209𝑃𝑜)))^2+(1/√
(𝐴(209𝑃𝑜)))^2 )
𝑓_3= 𝑒^(−( 𝑃𝑏) ∙𝑡(𝑠𝑒𝑝𝑎𝑟𝑎𝑡𝑖𝑜𝑛 𝑑𝑎𝑡𝑒−𝑠
210
𝑑𝑎𝑡𝑒))
Formulas:
γ =𝑁(
𝑑𝑎𝑡𝑒−𝑠𝑡𝑎𝑛𝑑𝑎𝑟𝑑
209
𝑃𝑜)/(𝑡𝑐𝑜𝑢𝑛𝑡𝑖𝑛𝑔 ∙𝑒𝑓𝑓 Chemical recovery
𝑑𝑒𝑡𝑒𝑐𝑡𝑜𝑟∙𝐴( 𝑃𝑜))∙100%
209
Activity Po-210, Bq/kg at the counting date (using Gross and Background c
g] = ((((𝑁𝑔𝑟𝑜𝑠𝑠( 𝑃𝑜) 𝑠𝑎𝑚𝑝𝑙𝑒)/𝑡𝑠𝑎𝑚𝑝𝑙𝑒)−((𝑁 𝑔𝑟𝑜𝑠𝑠(210𝑃𝑜) 𝑏𝑘𝑔)/𝑡𝑏𝑘𝑔) )· 𝑚(209𝑃𝑜)
210
Activity Po-210, Bq/kg at the counting date (using Net peak area),
𝑒)
𝑔 𝑡𝑖𝑚𝑒)
)
Combined uncertainty
0 0
Activity of Po-210 (Pb-210) at the sampling da 48.33 13.86
Combined uncertainty (k=2) 7.89 3.85
unc % 16.33 27.77
Reference sample: IAEA-414
Activity of Po-210/Pb-210, Bq/kg
Uncertainty (k=2)
95% Confidence interval
Pb-210
22.300
8139.5
0.03108
8.52E-05
0 0 Belanak
108.37 5.05 2.66
17.57 2.47 0.89
16.21 48.95 33.56
2.1
1.8-2.3
A 3/2
Laosan
Sunday, August 26, 2018
1/12/2019 8:00
1/16/2019 12:10
5.00
0.2000
0.3758
0.0103
172800
1
0.3
248.00
0.00
23.00
0.00
0.075
6.4
1.39
0.61
4.2
0.4
0.995008
0.979311
0.988213
A 3/2
Laosan
1.45
0.63
43.74
Nuclides: Po-209 Po-210
Half-life T1/2, yrs 125 0.379
Half-life T1/2, days 45698 138.376
Decay constant l, yrs-1 0.00554 1.82834
Decay constant l, days-1 1.52E-05 0.005009
Decay constant l, sec-1 5.80E-08
Tracer: Po-209 MODEL CAL3003 Standardized solution, dilution BATAN
Reference date 3-Sep-97
Tracer activity, Bq/g or Bq/ml 0.423
Uncertainty (k=2) 0.012
Analysis:
Samples: B 1/1 B 1/2
Description Kerang Tenggiri
Sampling / Reference date ### ###
Deposition (separation) date 8/23/2017 15:30 8/23/2017 15:30
Counting start date 8/24/2017 9:49 8/24/2017 9:49
Sample mass, g 1.00 1.00
Tracer Po-209 mass , g or volume, ml 0.2000 0.2000
Tracer activity, Bq/g on a Counting date 0.3787 0.3787
Uncertainty of tracer activity (k=1) 0.0104 0.0104
Counting:
Counting time t, sec 78299.6 79200
Background counting time, t bkg, sec 1 1
Counting efficiency, eff 0.3 0.3
Peak area N, Po-209 213.27 117.00
Peak area N, Po-209 in Background 0.00 0.00
Peak area N, Po-210 328.68 104.00
Peak area N, Po-210 in Background 0.00 0.00
Calculations:
Activity of Po-209 added, Bq 0.076 0.076
Chemical recovery γ, % 12.0 6.5
Activity of Po-210 at the counting date, Bq/kg 116.72 67.32
Combined uncertainty (k=2), Bq/kg 20.77 18.24
Time passed between separation and counting, day 0.8 0.8
Time passed between sampling date and separation 0.1 0.1
Correction factor f1 for Po-210 decay during counti 1.00 1.00
Correction factor f2 for Po-210 decay between separ 1.00 1.00
Correction factor f3 for Pb-210/Po-210 decay betw 1.00 1.00
Results: B 1/1 B 1/2
1.8-2.3
B 3/2
1
0.3
0.076
#DIV/0!
#DIV/0!
#DIV/0!
0.8
0.1
#DIV/0!
1.00
1.00
B 3/2
#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!
The significance of various levels of s
Confidence that result is real
84.13%
93.32%
97.73%
99.38%
99.87%
99.98%
100%
A, Bq/kgunc. K=2 unc %
1 A 1/1 Kerang 167.12 31.01 18.56
2 B 1/1 Kerang 117.66 20.94 17.80
3
5 A 1/2 Tenggiri 81.91 16.82 20.53
6 B 1/2 Tenggiri 67.87 18.39 27.09 180.00
160.00
8 A 3/1 Tuna 11.01 3.71 33.71
9 B 2/1 Tuna 32.41 10.11 31.20 140.00
120.00
12 A 3/2 Udang 11.09 3.41 30.74
13 B 3/1 Udang 13.84 5.42 39.14 100.00
80.00
16 A 2/1 IAEA 414 2.89 4.14 143.32
60.00
17 B 2/2 IAEA 414 2.49 2.92 117.37
40.00
20.00
0.00
0 2 4 6 8 10 12 14
Column D
4 6 8 10 12 14 16 18