CONSOLIDATED PM REPORT OF PHASE 7 SMPS ELEMENTS FOR THE PERIOD OF 11th May 2021 TO 10th Nov 2021

Sr.No Phase details Lot details SSA P.Key Site Name PM Done Date
1 Ph 7 Lot 2-X Coimbatore 7828 Venkatesa Colony
v 2021
Remarks
CONSOLIDATED PM REPORT OF PHASE 7 SMPS ELEMENTS FOR THE PERIOD OF 17th May 2021 TO 16th Nov 2021
Sr.No Phase details Lot details SSA P.Key Site Name PM Done Date Remarks
1 Ph 7 Lot-3-Y Coimbatore 7303 VLB Janaki Ammal Engg College
2 Ph 7 Lot-3-Y Coimbatore 7824 VOC Street, Madukkarai
3 Ph 7 Lot-3-Y Coimbatore 7305 Amrita
4 Ph 7 Lot-3-Y Coimbatore 8234 RVS Educational Institute, Sulur (Replace_2899)