Professional Documents
Culture Documents
com
40
Application: Travel length / lift .................................................................... m
Crawler Crane 15
Machine type ................................................................................. Unwinding length (a) .................................................................. m
Installation Feed-in
A B C D E F G H Cable payout
horizontal vertical
15
Mounting height (from flange to ground) ............................... m
Cable data
Cable provided by
fig. E fig. F
outer diameter (OD) ......................................................... mm
yes no
80
Max. load of the slip rings ................................................. A Air humidity .............................................................................. %
Control current Mounting height / location of the reel > 2000m above sea level
Others .....................................................................................
Protection class
Bus-type for data transfer (communication + data)
IP 55 (Standard) IP 65 (optional)
Profibus CAN-Bus
others on request ............................................................
Ethernet Profinet
Standards, Norms
DIN VDE / IEC CE
UL / CSA NEMA
ATEX
Others .....................................................................................
.............................................................................................................................................................................................................
.............................................................................................................................................................................................................
.............................................................................................................................................................................................................
General remarks:
(a) The total cable length is calculated from the unwinding length and usually two strain relief windings
+ 1m connection length of the cable inside the reel + cable length for the connection in the feed point
(depending on the application)
(b) Without further painting
(c) Please attach wiring diagram