BILL OF QUANTITY (BQ)

PEKERJAAN PENGADAAN UNIT PERTASHOP 3 KL GENERASI 3


PT PERTAMINA RETAIL

PERTAMINA

RETAIL

HARGASATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN SAT. VOL
MATERIAL (Rp-) JASA (Rp.) MATERIAL (Rp) JASA (Rp)
II Ill IV V VI VII VIII
1
A PEKERJAAN TANGKl

Tangki Double Wall Kapasitas 3 KL Follow Standar UL142 + Thermal Insulation

Dlmensi Tangki Outer: 1400 x 1880 x 1800 mm = 3,5 Kl

1 MildSteel A36 atau SS400 tebal 6 mm double wall tank Kg 1.518,17


Include:

* Loading Port Dia 2" Set 1.00

* Suction Port Dia 1-1/2" Set 1.00

* Emergency Vent Port Dia 6" Set 2.00

* Dipping Port Dia 2" Set 1.00


*PV Vent Port Dia 2" Set
1.00

* Manual Tank Gauge Port 2" Set 1.00

* Leakage For Insulation Concrate Port Dia.l" Set 3.00

* Leakage Detection Dia 1" Set 1.00

* Emboss Serial No. Per Tangki Set 1.00


* Foot Tank with Nut and Bolt Set 1.00

2 Perlite Insulating Concrete Fire Protection tebal 75 mm (Heat Insulation) Kg 1.050

3 Sublasting & Finishing Outer Tank Cat Epoxy warna Putih m2 17.07

4 Internal Tank Fluid Level - Volume Table / Tabel Tangki Set 1.00

5 Emergency Vent, Diameter 6" 260000 scfh, Primary and secondary tank Set 2.00

6 Manual Tank Gauge Set 1.00

SUBTOTAL! - -

B PEKERJAAN MECHANICAL (PERPIPAAN)

1 a. Inlet Pipe to Tank with accessories terpasang

* Pipa Black Steel Sch.40 Dia. 2” Set 1.00


* Incl. Camlock Type A Dia 2" w/ cover Set 2.00

* Incl. Tee Connection with dropline/extension pipe perforated Set 1.00

* Termasuk Equipment Support Pipa Lengkap (Isolation Oil Resistant, Bracket, dll) Ls 1.00

b. Outlet Pipe to Dispenser with accessories terpasang

* Pipa Black Steel Sch.40 Dia. 1-1/2" Set 1.00

* Termasuk Equipment Support Pipa Lengkap (Isolation Oil Resistant, Bracket, dll) Ls 1.00

2 Flange, Gasket Oil Resistant (*setara klingrit), bounding cable for flange, Elbow, Socket, Plug (Steel Oil Resistant) Ls 1.00
3 Overfill Prevention Valve Dia 2" Pcs
1.00

4 Foot Valve Dia 1-1/2" (Steel Oil Resistant) Pcs 1.00

5 Ball Valve Dia 2" (Steel Oil Resistant) Pcs 1.00

6 Check Valve Dia. 2" Threded Pcs 1.00

7 Ball Valve Dia 1-1/2" (Steel Oil Resistant) Pcs 1.00

8 Ball Valve Dia 1-1/2" (Steel Oil Resistant) tipe Three Piece Pcs 1.00

9 PV Vent Flame Arrester Dia 2" with extension pipe blacksteel sch.40 Set 1.00

10 Anti Siphon Valve Dia. 1-1/2" Outlet Pipe Pcs 1.00

11 Emergency Shut off valve (Inlet: Female dan Outlet: Male) Set 1.00

SUB TOTAL-II - -

Hal 1/2

HARGA SATUAN JUMLAH HARGA


NO. U RAI AN PE KE RJAAN SAT. VOL
MATERIAL (Rp.) JASA (Rp.) MATERIAL (Rp.) JASA (Rp.)
II Ill IV V VI VII VIII
1

C PEKERJAAN COMPARTMENT

Compartment Dlmensl Luar 1900 x 2200 x 2200 mm dan Accessories Terpasang

1 Rangka Utama Container (Frame dan Based)


* IWF 150 x 75 x 7mm Kg 140.35

* Hollow 100 x 100 x 2,3mm Kg 83.94

* Hollow 50 x 50 x 2,3mm Kg 125.91

*CNP 200 x75mm Kg 22.37

* UNP 50 x 38 x 6 x 8mm Kg 7.17

2 Dinding, Alas & Atap Container

* Plat Dinding tebal 2 mm Incl. ventilasi pada sisi container with nut and bolt (Khusus area Tangki) Kg 363.19

* Plat Bordes tebal 3,2 mm (alas bandwall kemiringan 1 Derajat) Kg 15.23

* Dudukan Dispenser, incl. dinding dan dop drain bandwall Ls 1.00

* Name Plate Unit (Fabrikator, Serial No. dan Tahun Produksi) Pcs 1.00

3 Rolling Door Aluminium berkisi partial perforated with box plat metal m2 3.06
4 Lifting Lug 4 titik corner Titik 4.00

5 Sandblasting Finishing Interior dan Exterior warna Putih & Hitam standar dan Merah Pantone Pertamina 186 C unit 1.00

6 Acrilic (Sign Produk) dan sticker unit (setara 3M), Pertashop, produk, dilarang merokok & zona berbahaya (kanan, kiri dan belakang) Ls 1.00
serta ketentuan rambu lainnya

7 Tangga Knockdown Unit 1.00

8 Wadah Tumpahan Detachable with Ball Valve (wadah tumpahan) loading Set 1.00

9 Pekerjaan Listplang Kanopi Keliling m' 12.10

* Hollow 30x30x1,5
* Siku 60x60

* ACP Warna Merah Pantone Pertamina 186 C

* Aluminium Plat Warna Putih bagian bawah canopy

* Cutting sticker scotlite list keliling dan background logo Pertamina Putih

* Stickering logo Pertamina

* Sealant dan finishing cat duco

* Plat Aluminium penutup bagian dalam listplang

SUB TOTAL-HI - -

D PEKERJAAN ELECTRICAL
1 Kabel NYFGBY 4 x 2,5mm Incl. Accessories terpasang m 10.00

* Untuk Koneksi lampu dan Dispenser

2 Kabel Conduit (Flexible & Pipe) metal & Gland Cable metal terpasang Ls 1.00
3 Pemasangan Bonding Dispenser dan Tangki ke Body Container, Copper Rod 5/8" @1 batang dan kabel grounding BC 35mm Ls 1.00

4 Lampu Explotion Proof dan aksesoris terpasang Unit 1.00

SUB TOTAL-IV - -

JUMLAH TOTAL - -

JUMLAH MATERIAL + JASA -

KEUNTUNGAN & RESIKO 10% -

JUMLAH -

DIBULATKAN -
TERBILANG :