You are on page 1of 1

http://btcbarrel.

ru/
Bitcoin Barrel Instruction

1. ASICs Installation in the bottom of the barrel: Remove the fans and screw in
the bolts which act as legs. It is advisable to add nuts to limit the depth.
2. Schematic connection of ASICs through automatic circuit breaker. It’s
necessary to provide a phase to all 3 power connectors when using 220 volts
in the ASICs power supply,
3. After installing the ASICs, fill the container with oil up to 2 cm above the oil
intake nipple placed on the pump.
4. Operating the pump: Be sure to bleed air from the circulating pump.
5. Open the white flow control valve of the immersion liquid and wait until the
air comes out of the heat exchanger, then close it after a steady flow of oil
appears. Before operating, make sure that the automatic sensor is fully
immersed in oil.
6. When connecting water, it is necessary to observe the counter flow of water
and oil.
7. You need a shut-off valve to control the oil temperature. It is convenient to
use a flexible hose with a female thread 1/2"or 3/4" to connect water. It is
necessary to install an automatic air release valve at the outlet of the heated
water.

1- Auto air vent


2- Threaded tee, 1/2 "
3- Ball valve or valve
4- American direct drive.
5- Tee sewer pipe.
6- Transition cuff D40x50
7- Reducing coupling, external thread 1/2 "x25mm, polyethylene.

8. Adjusting the thermostat

You might also like