You are on page 1of 1

NOTE:

- All measurements must be corrected and


restarted in place before starting any remodeling
STBD
PROJECT:

23
NO. 47 H. STR
21 26 28
15750 A/B
20.0[17.5] 20.0[17.5]
15.0/24.0[12.5/21.5]

18.0 [14.5]
L5 HULL SURVEY PROGRAMME
20 22 20.0[17.5] 25
20.0[17.5] THICKNESS MEASUREMENT
29
MT MAKSIM GORKY
17 r s t u v w x 19 za zb zc zd ze zf zg
y z IMO 9590008
19.5 [16.0]
21.0[18.5] L6
18 27
24
22.0[19.5] HS4 18.0[15.5] HS3 18.0[15.5] 24.0[21.5] HS1 NO. 40 H. STR
HS2 9800 A/B
11 13 15 PLAN:
20.5[17.0]
HP4 No. 3. COT (WING)
20.0[17.5] 20.0[17.5]

5]
q TRANSVERSE BULKHEAD
16/24[13.5/21.5]

1.
16
AT FR. NO.84

5 /2
p

3.
20.5[17.0]

[1
12 14
PLACE OF SURVEY:

24
HP3

/
a b c d e f g 8 n

16
6 h l m
10 POZUELO BAY, VENEZUELA
21.0[18.5]
21.0[18.5] 9 21.5[18.0]
7
5 HP2 OPERATORS:
1 21.0[18.5] 3 21.0[18.5] 22.5[19.0] MR. ORLANDO MEDINA
2 4 HP1 MR. PABLO SEQUERA
MR. DIMAS SMITH
13 14 15 16 17 18 19 20 21 22 23
DRAW:
21.0[16.5] 21.0[16.5] 21.0[16.5]
T4 T5 T6 MR. DIMAS SMITH

DATE:
MAY 2021

SCALE: DRAWING:
N/A A4

You might also like