Instruction manual
of Pellet Mill
ce— Creat
I: Caution
Il: Introduction
I: Purpose and Principles _
¢ &
NV: Data and Parameter
ment Requirements
: Operation Method and Influencing Factors
‘VII :Maintenance of the machine
Vill: Common Troubles and Solutions
IX: Main Wearing Parts ¢ :
Xz Assemble C wh —
MI: ~€ Circuit Diagram
Mil: Products Guarantee
| _ src (atelCO—F/ee
1 :Caution
1. Only the training person can operate the machine.
2. Don't dismantle the machine freely; don't change the safe
protection covers or marks.
3. Don't operate the machine in the fatigued and weak condition.
4. Don't touch the switches with the wet hands for avoi
5. Please turn off the switches if the electricity is powered off
suddenly.
6. Only the trained person can complete machine maintenance.
7. Don't touch the running parts of the machine with your hand while
the machine is running.
8 Turn off the main power when check and maintenance the
machine.
9. ‘The machine must keep far away from the flammable and
explosion environment.
10. When adjust and change the cutter, please wear the glove to avoid
the cutting hazard.
A Caution, electric hazard!
A Caution, hot surface!Instruction manual of Pe!
Antroduction
Pellet fuel is @ kind of clean and renewable energy, ctaractorized by its conveniont
production, packaging, storage and ranssodation
ZLSP sores of flat dia pellet mil Is the latest development of energy-saving equipment
‘Through many technical experts’ hard work, the machines have adopted advanced
teennoiogy trom congeneric pellet mil
comes ans overse:
markets win advantages ot
high effciency stable operation, high sally le. Furthermore, the user can choose diferent
iameter and compression ratio as needed to get the best technical and economic benefits,
ZLSP series of fat ci pelt mil for fodder processing isindispensable for scientific feeding
by making the fullest use of natural resources. It 8 especialy applicable to the masters of
aquaculture, fodder process factory and invidal specialization to process the fodder for
rabbits, chicken, hogs, cate sheep, fsh, shrimp and so on,
In order to gat full use ofthe pellet mil, improve preducton efficiency, ensure work safety
and service lMe, please read the specicalon before using K. The operation and
‘maintenance must be on the basis ofthe specification. Do forbid illegal operation.
uxpose and Principles
(Our ZLSP seri palit mill extrude the biomass materials ofthe forestry and agriculture
wastes such as Sawdust, wood chips, sraw, rice hulls etc. to mold cylinder pellet fuel. The
source of the raw material is wide and the price is low. The production of pellet fuel is
slabrous, hard and righ-calorfe. Furthemore, the user can choose diferent diameter and
compression ratio as needed to get the best technical and economic benefits.
ZLSP sores pallot mill use the metor or desel enginé 3 fower. Tho machine drive the
spindle and die through the gear driving, The raw material ae forced eut ofthe cle hole by
the squeezing ection ofthe die and pressing fll. Then the hich quaily pellets sre produced
“The length of the pelets dan be controle by adjusting the positon ofthe tool bi.
IV:Main Technical Data and Parameter
Packing measurement
Nwew. (eon)
Modal | Powertkw) | including power
KG) Incusing pow | Excluding power
‘Single-phase
22KW metor
aise rao | 224 meter | gona | rioxseoxst0 | s7oxse0%910
SKW moter
zisp za | canpdeat | 20140 | sooxaaox720 | 7a0xa20%670
‘ZLSP 150B ‘Tiss Hise! 95/115 750x360x650 | 700x350x650
KW mote
zisp ison | e-12HPdese | ast20 | aaorasoxr20 | 770xas0x650
“eon | Thee pase
zisp zoos | Tree phase | aoqr30 | tooos0x050 | o00x30x050
ise zoo | 15-41@HP dese! | 2107240 | 1000%460x900 | 100014604000
ZLSP 2308 These pliase: 290/320 1140x470x970 | 980x470x870
TiKW mote
zisp 30a | 22-26HP dese! | 2801810 | 11e0xs60x1020| 1090%s20%820
eon | Tivee phase
zispzeoa | Tsephese | aaoraso | rza0xso0xt070| s120.490%1070
zispcoos | Tyesehese | arqusso | rzzoxs20«1070] 1170x520%1070
coon | The phase : =
zisp soon | Teeehee | sarzo0 | zzn0x600x1210 | 2000x600%1070
V Environment requirements
The machinery should be placed inthe environment where there is no shock and dust, The
cervironmental tomporature is 60 ~40°C. The humidity is 5% ~90%, and the altitude is below
000m.
The delvery and storage of machinery must avoid rain, molsture. The temperature for
delivery and storage is -25%C ~ +50, the maximum temperature is 70°. it the period of
delivery end storage Is more than 24 hours, aparopriate methods shell be provided to
prevent damage trom humisity vibration and shockV:Operation method and Influencing Factors
4LRequirement for raw material:
‘The moisture ofthe raw material should be adjusted to 14%-18%, No matter the volume of
walter i high or lw it wil influence the output oF quality, Meanwhile the raw material must
be mixed homogeneously
2.Grinding-in of the new die:
Before useing this machine the die stould be grinding.in as follows: Prepare Skg raw
materials and 1kg sliver sand, then mix them suffeienty and inject hg used oll Stert the
‘machine and put inal the mixed materials. Then adjust the pressing rll bolt until it outputs
normaly, (Caton: fhe asusted gap cannot be 0 smal, is the pressing rll ore wil be
damaged.) Keop the machine working wih matarals for an our. THER putin rama rw
materials and begin to produce the machine canrol work regu, fine-tune the’ bol a
it loose unlit can work
Whe machine cannot utp ye, loan ti iy mater ney materi in the de by steel
ral he hed of the nai must be grained fa}, then Gncing in again
Ara fl days wot, when there are nora materi et inthe plaid tank, rec ly
materiales witha materials and 10% used aio avoidthe le hele beng blocked. So
ek wl sa tf ie or next work
2.The adjustment ofthe gap between the die and roll
‘The gop bebean conpensng fl ae wil ives tho rmtting eet we ually
|: usualy betwen 005~0.amm. I gos over am, the mater ayer wl be 00 tik
and dition wil be nonunion. So Ris bed for pallalzing quay the gap goes below
{.05mm, the macine wil be badly worn, The acstment metho usualy set he stands
by adjusting the pressing rll unt it can twit or not whan stating the machine or whan
throng the mater int the machin by hand, you can't hes the vice byte passing rol
i
Adjustment method Adjust screw by hex wrench, Note bot ofthe sere ehoukd bo
eclustod event int
4.Make sure the hole depth and diameter (compression ratio) ofthe die
needed. When the rtio of hole depth and diameter
is emal, he ouput igh bu the hardness GW: Other, tis oppo. H necessary, we
‘The users can choose different dies as neede:
can customize dies as per the raw material being provided by customers.
S.Adjust the length of the pellet:
‘Adjust the height ofthe knife edge to set length of cells,
G.Replace the die:
PPanish the tooth in nick ofthe screw nut inlayed inthe check washer on the main spindle.
‘Screw out the the nut by hook spanner. Take out the check washer and fist washer. Then
take the de out by dle-dever.
Do orinding-n as the aforesaic methods after replace the new dic.
‘Handling of the pellets:
Pease lay he pellets in the place of ventilation unt! they become coo! lo room temperature.
Then bagging and storaging
Maintenance
VII: Maintenance of the machine:
PeRion oF PERIOD oF
no |.uaricarionrarr| ontyee | PERIODOF, | PERIODOF |
1 rower — | UTHUMBASE | Twice peR SHIT
UTHIUM BASE
2 | mainaxis | ATU ONGE PER SHIFT
> | eeansox )HvPOI GEAR lurTomesETaMESX —| ox wonmne
oi MONTHS AT THE FIRST TME|
1. Operator should etrictly lubreate machine eecorcing to requirements above.
2, Operator should check the oil level in gear box at the first time of using this machine. It
advisable to the protruding pat ofthe oll standard circular,
3. Bofore starting the machire, check whether the roller cover bolts become flexible, to
prevent rut falling down into material, which cause the damage accident of compression
roller
4 Only afer feeding can you stat the machine, operating without raw materials forbidden,
5. You are forbidden to touch the pressing roll and dio with hands or metal tools. You can
Use crabstick to stir when necessary,
6. Monthly chack whether the electric equipment is in good condlion or whether the wire is
aged.
7. Use the pellet mill with clutch, before starting the diesel engine, make clutch separated.
‘Air starting diesel engine, make clutch close slowly. And often check tighiness of leather
belt, check bet to prevent the phenomenon of lower output, belt skid.
8. If it qxists clamping phenomenon and abnormal noises, you should halt machine
immediately. Restart the machine after solving the problems,Vil: Common troubles and solutions.
“Troubles Possible reasons Solution
4. Thenew machinehasn't | 1, Clean the current materialand add
“The pellets cant | D8" srindedein by aly material | the oly material o abrage the new
bedischarged. | OF18grinded-n nsuficienty. | machine as per the process of 1.3
2. The material containe too | 2, Add come dry material to adjust tho |
‘much moisture. moisture.
7 The wollage i Tow.
1. Use the electric wire of over 4mm
Themotor | 2.The pressure between the | 7, USE 06 6
halt suddenly. | pressing roller and template is | 3M MP ne
pees 2. Loose the adjusting bolt
The pellets are | 1. The template is worn, 41. Adding litle water into the material
sofl or powdery. | 2. The raw material fs too dry. | 2. Replace the template.
7.Add the material before euning oF
‘mix and input the material by wood
stick
4.No material betwean the
The prassing | pressing oll and tomplate.
rollers damaged.| 2. There is some hard stuf
asia acne 2. Proven hard impurity fron, stone
or sancs within the materia
IX:Main wearing parts
rat Hote ty | !nstalation |Rem-
120 | 150 | 200 | 230 | 260 | 300 ” aid
To [ ck Ring for Bes z
Bearing |e204na|s204Rz|e206R7ez0eRZ| 6208 | 4 | roter 18 | earing 6205 37 [ Se | Upp Borba 7
a 17 [Pressing Roar 2-[36-[ Cover of cbanrvation vindaw [1
‘Bearing| 6206 | 6206 | 6208 | 6209 | 6312 | 6312 | Pe | 1 |principal ais Te |e Ring Sas pecaeee e +
[Bearing] 30207 | 30207 | 20300] 32300] s0a12| azara| p= | 1. | principal xs 15 |e Ring for asi 134 | Prastic cushion 1
14 [Big seer) 138] Passive Coupling H
(Beerng| 6203 | 204 | cans | e207 | ans | e207 | p= | 1 | oearane 13 [ig-gear seat To) | Cotter Fin 1
12 [and nut T[at] tase Rat H
[Bearing] 50205 | ac206| 30207 [31300] s0300| 31900| p= | 1 | ear axe i a [a0 saline 1
Bearing| 30209 | 30209} Po | 1 gear axis: 10 ey 29 | Bearing 6206 T
|Bearing| |6307RZ| Po | 6 roller £ { Saag oe feat Z
a 2 1 [at | teoered Rotter Bearings S0a07 | 1
Sr bersrupesoidearo ree deeoo sear p= | 1 | gearexs 7 1/26 | Gar Saft 1
Grea] 6 1) 95 | Gor Boe 1
cee Felt eyinder [2 | rotor & ES -
creas Felt eyinder me | 1 [prmcipa xe 4 13 | Wheel start 1
aoe 3 1 22 | Hexagon Head Serow 8
[custion] 80 | 80 | 105 | 105 | 150 | 160 | m | 1 | couping 2 1 [21 | Bearing Cover of press roller | 2
= i 1120" Bowring a5 2
Roter «| 7 a -
bey teen [Description dty |ten | Description a
oid ela|Xl:Electronic Schematic Cireuit Diagram
Xil:Products guarantee
1.The pelle mil sod by our company is qualified products. The products are covered by 12
‘months warranty after delivery. Any quality problem, we ensure the retuming, exchanging
land mending of the goods
2For the quick-wear-part, Such as :roller, Nat die, bearing, belt etc, are not belong to the
scope of product guarantee.
For the motor, if itis powerless and overheating in short time, we can exchange @ new
‘one for you, but f the motor burst out the responsiblity will belong to the user.
4. the break-down belongs to the user's improper operation , we won't take the charge,
Dear customer,
Thank you for purchasing our products!
Please refer the specification in detail to use our products correctly,
Our company is devoted fo the improvement and innovation of our
products, If the machine has something different from specification,
sorry for no further notice. For the quality problems or other
suggestions, please inform us in order fo guarantee your timely
service,
Wish we can join together to create a better future,