Professional Documents
Culture Documents
Scope of Work
Scope of Work
WORKSHOP BUILDING 30
WAREHOUSE 31
BULK CHEMICAL STORE 32
TRANSFORMER NO. 1 33A
TRANSFORMER NO. 1 33B
TRANSFORMER NO. 1 33C
ELECTRICAL BUILDING NO. 1 34A
ELECTRICAL BUILDING NO. 2 34B
ELECTRICAL BUILDING NO. 3 34C
DG. SET WITH DIESEL TANK 35
ADMIN BUILDING & CONTROL ROOM, 36
MOSQUE
MESS / REST AREA 37
PARKING AREA 38
GUARD ROOM 39
CONTROL ROOM 40
LABORATOY ROOM 41
POTABLE WATER STORAGE TANK 42
DAF SATURATED SYSTEM/ PUMP ROOM AIR 12C
COMPRESSOR ROOM
INTERMEDIATE PUMPING STATION 14
CHEMICAL DOSING ROOM (DAF) 11
PLANT WATER PUMP ROOM 19
FILTER COMPRESSOR & MCC ROOM 20
SLUDGE THICKENING AND DEWATERING 22
BUILDING