APPENDIX C JADUAL KADAR HARGA - KERJA-KERJA SIVIL ‘GENERAL ITEM' - KERJA-KERJA SIVIL METHOD OF MEASUREMENT AND PRICING FACTORS SECTION 1 -GENERAL ITEMS La LL CONTRACTUAL REQUIREMENTS Performance Bond Unit The unit of measurement shall be Lump Sum. Measurement ‘The measurement for payment shall be made as follows: (a) In the first interim payment, the Contractor shall be paid either the actual premium paid by him upon submission of the receipts or the tendered lump sum for the item whichever is the lesser. The receipts of premium paid must be from the company (Bank/Insurance/Finance Company) issuing the guarantees; (&) The remaining sum (if any) shall be paid in each subsequent interim payment in proportion to the total period tapsed to the Contract Period (excluding Defects Liability Period). Insurances Unit The unit of measurement for the following Insurances shall be Lump Sum: (@) Insurance of Works including Insurance Against Personal Injuries and Damage to Properties (®) socso Measurement ‘The measurement for payment shall be made as follows: (2) In the first interim payment, the Contractor shall be paid either the actual premium paid by him upon submission of the receipts or the tendered lump sum for the item whichever is the lesser. The receipts of premium paid must be from the insurance company issuing the policies or the authorized underwriter, (b) The remaining sum (if any) shall be paid in each subsequent interim payment in proportion to the total period lapsed to the Contract Period (excluding Defects Liability Period). MMI/1 12 12.1 Construction Industry Development Board (CIDB) Levy Unit The unit of measurement shall be Lump Sum. Measurement Lump sum payment of 0.125% of the Contract Sum in compliance with the Construction Industry Development Board requirement shall be made upon production of official receipt issued by the Construction Industry Development Board to indicate evidence of payment. SO’S REQUIREMENTS Accommodation for the $Q’s Staff Unit The unit of measurement for the establishment, maintenance and removal of the following accommodation shall be Lump Sum. 12.1.1 Office 1.2.1.2 Laboratories ‘Measurement ‘The measurement for payment shall be made as follows: (@) 60% on completion of the facilities as specified; (6) 20% for maintenance which shall be made in each interim payment in proportion of the total period lapsed to the Contract Period (excluding Defects Liability Period); (© 20% on removal. ing Factors ‘The item for establishment and removal of accommodation shall in accordance with the Preambles to Bill of Quantities General Direction include: (@) provision and preparation of site; (b) foundations and bases; (©) fences, notice and direction boards; (@ vehicle access, hard standing, parking area and foot paths; MM1/2 (©) office furnishing, fittings, supplies and initial consumable stores as specified; (®) provision of telephones and extension as specified (where applicable); (g) water, sanitation, power, air conditioning and lighting services (h) compliance with local building by-laws; (@ depreciation of buildings, furnishings and fittings; @__ receiving back from the SO and removing buildings, furniture, fittings and supplies off site; (k) disconnecting and removing services and sealing off disused services; () demolishing and removing off site temporary accommodation, vehicle access, hard standing, parking areas, footpath, fences, notices and direction ‘boards; (m) disposal of surplus materials; (n) reinstatement of the site; (0) removal and disconnecting of telephone (where applicable). The item for maintenance of accommodation shall in accordance with the Preambles to Bill of Quantities General Direction include: (a) rental charges including telephone rental (but excluding charges on telephone calls); (b) fees and charges levied by the respective authorities and maintenance of power, lighting, water, sanitation, air conditioning and sewerage disposal; (©) maintenance of buildings, services, fences, notice and direction boards, vehicle access, parking areas, hard standing end footpaths; (@ maintenance of furnishings and fittings and supplies; (©) maintenance of telephone (where applicable); (f) cleaning accommodation including pest control; (g) moving and re-establishing portable office accommodation as required up to a maximum of 3 moves; (h) replenishment of consumable stores; (i) maintenance of all access for use under all weather conditions. MMI/3 1.22 1.2.2.1 1.2.22 Services for the SO’s Staff Transport Services Unit The unit of measurement for the provision of suitable transport service shall be Lump Sum. Measurement The measurement for payment shall be made in each interim payment in proportion of the total period lapsed to the Contract Period (excluding Defects Liability Period) commencing upon when the transport service is made available. Pri Facto ‘The item shall in accordance with the Preambles to Bill of Quantities General Direction include: (@) provision of the vehicle type as specified together with comprehensive insurance and road tax for every vehicle; (b) vehicles are accident free; (©) certification from Puspakom at every six months; (@)_ transport is readily available for the use of S.0.’s staff, (©) depreciation Operation and Maintenance of Vehicles Unit The unit of measurement for operation and maintenance of vehicles shall be Lump Sum. Measurement The measurement for payment shall be made in each interim payment in proportion of the total period lapsed to the Contract Period (excluding Defects Liability Period) commencing upon when the transport service is made available. Pricing Factors ‘The item shall in accordance with the Preambles to Bill of Quantities General Direction include: (a) taxing for use on public highway and for carriage of goods and samples; MMU4 1.23 1.23.1 (b) comprehensive insurance to cover all drivers and passengers and the carriage of goods and sample throughout the Contract Period (excluding Defects Liability Period); (©) provision of suitable replacement including equipment when regular vehicle is not available or unserviceable for more thar. 24 hours; (@ maintenance in a roadworthy condition and in conformity with the vehicle manufacturer’s recommendations; (©) fuel, oil and lubricant; (Q) validity of road tax throughout Contract Period (excluding Defects Liability Period), (g) keeping the vehicles clean inside and out. Equipments for use by the SO’s Staff Laboratory Equipments Unit The unit of measurement for the provision and maintenance of laboratory equipments shall be Lump Sum: ‘Measurement ‘The measurement for payment shall be made as follows: (2) 60% on receipt and approval of all the equipments supplied and installed; (>) 40% for maintenance of the equipments which shall be made in each interim payment in proportion of the total period lapsed to the Contract Period (excluding Defects Liability Period). Pricing Factors The item for provision of laboratory equipment shall in accordance with the Preambles to Bill of Quantities General Direction includ (@) provision of all equipments as listed in the Specification; (b) depreciation; (©) _iwstallation and calibration of the equipments; (@)_ receiving back from SO and removing equipments off site; MMI/S 12.3.2 The item for maintenance of laboratory equipment shall in accordance with the Preambles to Bill of Quantities General Direction include: (@) maintenance of the equipments to a working order condition; (b) provision of suitable replacement when the regular equipment is not available for more than 24 hours; (©) replenishment of consumable items; Office Equipments Unit The unit of measurement for the provision and maintenance of the following office equipments (where applicable) shall be Lump Sum. (@ Computer (b) Photocopy machine (©) Facsimile machine (4) Printer (e) Digital camera © Scanner (g) Overhead projector ‘Measurement The measurement for payment shall be made as follows: (@) 60% upon the complete delivery and commissioning of the equipments as specified: (>) 40% for maintenance of the equipments which shall be made in each interim payment in proportion of the total period lapsed to the Contract Period (excluding Defects Liability Period). Pricing Factors The item for provision of office equipments shall in accordance with the Preambles to Bill of Quantities General Direction include: (a) provision, delivery to S.0.’s office and commissioning of equipments and accessories/peripherals as listed in the Specification; (b) in the case of computers, the original and legal copies of software as specified: (©) iim the case of facsimile machine, the provision of telephone line and connection; MMI/6 1.24 @ depreciation; (©) removal from the S.0.’s office and revert back to the Contractor upon issuance of the certificate of practical Completion. The item for maintenance of office equipments shall in accordance with the Preambles to Bill of Quantities General Direction include: (2) maintenance of all equipment and accessories; (b) rental charges (where applicable); (©) payment for telephone charges for faxes is not included; (@ repair cost and cost of replacement in case of breakdown; (©) regular servicing of all equipment, with suitable replacement when the regular equipment is not available for more than 24 hours; (© provision and replenishment of consumable items; Attendance for the SO’s Staff Unit The unit of measurement for the following attendance for the S.O.’s staff shalll be Lump Sum. 124.1 Drivers; 12.4.2 Laboratory Assistants Measurement ‘The measurement for payment shall be made in each interim payment in proportion of the total period lapsed to the Contract Period (excluding Defects Liability Period), ing Factors The item shall in accordance with the Preambles to Bill of Quantities General Direction include (@) the wages and other emoluments paid to the operative including payment for overtime; (b) working outside the Contractor's normal working hours if so required by the SO; MM1/7 12.5 (©) cost and expenses incurred consequent upon the employment or hiring of the operative including payment of Employee Provident Fund, insurance, medical and hospitalization; (a) _ replacement of unsuitable personnel. Setting Out Unit ‘The unit of measurement for setting out shall be Lump Sum. leasurement ‘The measurement for payment shall be made as follows: a) 50% on completion of setting out and approval of survey drawing submitted; b) 50% in each interim payment in proportion to the value of completed permanent Works to the Contract Sum. Pricing Factors ‘The item shall be in accordance with the Preambles to Bill of Quantities General Direction include: (@) survey instruments and equipment required by the surveys (b) installation and calibration and maintenance of instrument and equipment; (© depreciation; @ provide suitable replacement when the regular instrument is not available for more than 24 hours; (©) replenishment of consumable stores; (maintenance of instrument and equipment to a working order condition; (@) surveyors, chainmen and attendance; (h) all materials required for establishing and maintaining survey stations, benchmarks and the like (¢g. installation of precast concrete reference beacons including safeguarding by fencing and concreting-in where necessary and replacement of damaged beacons); @ all attendance required and setting-out records. and data required for the Works; @) maintain all survey and setting-out records and data required for the Works; MMI/8 1.26 1.2.6.1 (K) demarcate on site limit of R.0.W.5 (verity existing benchmarks and reference markers; (m) all detailed survey and setting out requited for the Works; (a) submission of Drawings; (©) topographical survey of new roads leading to new housing and industrial development areas which are not included in the Contract Drawings; Miscellaneous Project Signboard Unit The unit of measurement for project signboard shall be Lump Sum. Measurement ‘The measurement for payment shall be made as follows: (a) 80% on completion of installation; (0) 20% on removal. Pricing Factors ‘The item shall be in accordance with the Preambles to Bill of Quantities General Direction include: (@) excavation in any material including rock and reinforced conerete and loading into transport, upholding the sides and keep the earthworks free of water; (b) backfilling and compaction; (©) support; (d) formwork; (@) _ in-situ concrete; (© disposal of surplus material; (g) painting, high intensity reflectorise aluminium sheeting and illumination; (h) cleaning, maintaining and repairing; MM1/9 1.2.6.2 1.2.6.3 (i) _ erection, dismantling and removing from sit (reinstatement of surfaces; (Kk) payment of all charges including obtaining permission, licenses and fees. etc; Progress Photograph vit The unit of measurement for progress photographic record of work shall be Lump Sum determined by the number of set. Measurement Each set shall comprise 2 prints of each exposure in 3R size, minimum of 36 exposure film taken on any one flight or visit to site. Each set of slides shall comprise 24 slides. Each set of C.D. shall comprise of two C.D.s containing all the selected progress photographs for the month. ‘The measurement for payment for the progress photographs, progress slides and photographs in compact disk (CD) format shall be made of the sets furnished and accepted by the SO paid in each imerim peyment in proportion of the total period lapsed to the Contract Period (excluding Defects Liability Period). Pricing Factors ‘The item shall be in accordance with the Preambles to Bill of Quantities General Direction include: (@) film, development of film, prints, proofs, slides and documenting in suitable album; (b) delivery and supply to the S.0.’s office; (©) identification marking on the prints and slides; (4) mounting on manila card for display purposes as directed by the S.0. (©) provision of camera and competent photographer; Performance Report Unit The unit of measurement shall be Lump Sum determined by the number of set. MMI/LO 1.2.6.4 Measurement The measurement for payment for of progress reports comprising progress report, project report and quality control report shall be made in each interim. payment in proportion of the total period lapsed to the Contract Period. ricing Factors The item shall be in accordance with the Preambles to Bill of Quantities General. Direction include: (a) taking measures and computation; (b) keeping of records; © compilation; (@)__ processing and writing of report; (©) printing and binding; (dispatching; (@) submission of monthly performance reports (12 copies per set). Works Programme Unit The unit of measurement for implementing the Works Programme using the Critical Path Method (CPM) programme for planning, monitoring and control of resources and progress of works shall be Lump Sum. Measurement The measurement for payment shall be made in each interim payment in proportion of the total period lapsed to the Contract Period (excluding Defects Liability Period), Pricing Factors (@) item on implementing the CPM programme for planning of resources and progress of work as specified in the Specification and should include: trained and qualified personnel to maintain and update the programme planning using the CPM programme; providing softwares for JKR, which is to be retained by JKR after the completion of the project. The softwares to be utilized is - the latest version of Microsoft Project 2000 or equivalent for projects costing less than RM30 million; MML/I1 12.6.5 - Primavera Project Planning (P3e) or equivalent for projects costing more than RM50 million or projects which incorporate a lot of scopes and milestones. (b) carry out regular check of progress including updating all information and maintain the planned programme periodically or as and when instructed by the S.0.; (© submission of the reports to JKR on computer medium and printed hard copies periodically or as and when instructed by the 8. (@) identification of critical path for the timely execution of the work to completion; (©) a detailed programme which would identify the requirements of every possible resources for the successful implementation of at least six (6) ‘months of work for assisting everyone concern in planning their associated activities. As-built Drawings Unit The unit of measurement for as-built drawings shall be Lump Sum. Measurement The measurement for payment shall be made upon submission and approval by the S.0.. Pricing Factors The item shall be in accordance with the Preambles to Bill of Quantities General Direction include: (@) preparation and submission of as-built drawings for approval by the $.0. and final ROW surveyed drawing by an approved licensed Land Surveyor in tracing, print, CAD format in computer CD as detailed in the Specification; (®) providing labour, tools and equipment necessary to take measurement and obtaining such information on site as are required by the S.O. for the preparation of as-built drawings; (©) confirming correctness of as-built drawings; (preparation of monthly periodic updating as work progress for inspection byS.05 (©) preparation and submission of road asset inventory comprising culvert and bridges, slope protection and road furniture in the number of set specified. MMI/12, 12.66 1.2.7 1.28 ‘Clearing Up Of Site Unit The unit of measurement for clearing up of site on completion of the Works shall ‘be Lump Sum, Measurement The measurement for payment shall be made in the last interim payment upon clearing up of Site to the satisfaction of the S.0.. Prici tor The item for clearing up of site on completion shall in accordance with the Preambies to Bill of Quantities General Direction include: (a) reinstatement of damaged area due to any work and temporary work carried by the Contractor to its original condition; (b) disposal of surplus material, waste etc; (©) clearing of the drainage system. License Security Services Unit ‘The unit of measurement for provision of license security services shall be Lump Sum. Measurement ‘The measurement for payment for Contractor's superintendence shall be made in each interim payment in proportion of the total period lapsed to the Contract Period (excluding Defects Liability Period). Pricing Factors (@) costs and expenses incurred consequent upon the employment or hiring of the license security service; (b) costs of working 24 hours with 12hours shift. (©) replacement of unsuitable personnel; Quality Assurance Plan MMI/13 1.29 Unit The unit of measurement for provision of quality assurance plan for design and construction shall be Lump Sum. Measurement ‘The measurement for payment for Quality Assurance Plan shall be made in each interim payment in proportion of the total period lapsed to the Contract Period (excluding Defects Liability Period), Pricing Factors (@) costs and expenses incurred consequent upon the employment or hiring of a suitably qualified and experienced person to act solely as Quality Assurance Officer full time on site including payment of Employee Provident Fund, insurance, medical and hospitalization; (b) costs and expenses incurred consequent upon the employment or hiring of Quality Assurance Team full time on site and required resources for effective operation of the Quality Assurance Plan including payment of Employee Provident Fund, insurance, medical and hospitalization; (®) preparation and submission to the SO a properly documented Quality Assurance Plan according to work procedures set in the Public Works Department Quality Management System and updating and revision during the progress of the work; (© _ submission of monthly reports incorporating all test results, test certificates, photographs and lab report, endorsed by the Quality Assurance Officer; @) preparation of quality report in the form of CD and hardcopy. Location, Temporary Protection and Temporary Relocation _of Public ‘Utility Installations and Other Services Unit The unit of measurement shall be Lump Sum, Measurement The measurement for payment for location, temporary protection and temporary relocation of Public Utility installations and other services shall be made in each interim payment in proportion of the total period lapsed to the Contract Period (excluding Defects Liability Period). MMI/14 13 The item for location and temporary protection of Public Utility installations and, other services shall in accordance with the Preambles to Bill of Quantities General Direction include: (a) _ locating the positions of the utilities including excavating trial holes of all services; (b) making good any damage caused to the approval of the appropriate Service Authority or owner; (©) arranging with the appropriate Service Authority or owner for all temporary diversions required in connection with the works and keeping the P.D. fully informed ofall such negotiations; (A) providing all labour, materials and plant to expeditiously execute the works; (©) protecting utilities to the requirements of the appropriate Service Authority The item for temporary relocation or diversion of Public Utility installations and other services shall in accordance with the Preambles to Bill of Quantities General Direction include: (@) arranging and liaising with appropriate service Authorities or owner for all temporary diversion; (©) complying with requirements of respective Service Authorities; (©) making good of any damage caused to the approval of the appropriate Service Authority; (@ providing all plants, labour and materials; (©) cutting off and disposal of redundant mains pipes, cables, chambers, covers, etc., (© the credit value of disposed materials as stated in (e) above; {g) provision of a competent and experienced person to liaise and coordinate the services operations with the works; (b) reinstate connection to properties and make good of all services; (@__ allowing for inspection by the respective Service Authorities. CONTRACTOR’S REQUIREMENTS MMI/I5 13.4 Contractor’s Accommodation and Buildings Unit The unit of measurement for establishment, maintenance and removal of the following Contractor’s accommodation and buildings shall be Lump Sum. (@) office (b) stores and workshops (©) .workman’s accommodations Measurement The measurement for payment for establishment, maintenance and removal shall be made as follows: (a) 60% on completion of the facilities as specified; (b) 20% for maintenance which shall be made in each interim payment in proportion of the total period lapsed to the Contract Period (excluding Defects Liability Period); (©) 20% on removal Pricing Factors The item for establishment and removal of Contractor’s accommodation and buildings inclusive of utilities shall in accordance with the Preambles to Bill of Quantities General Direction include: (@) preparation of site, foundations, bases, hard standings; (b) water, sanitation, power, lighting and communication systems; (©) fences, notices and direction boards, vebicle access, parking areas and footpaths; @__ buildings and accommodation including payment of fees and other charges; (©) office equipments, furniture and fittings, supplies and consumable stores, workshop tools and equipment; (© depreciation of buildings and accommodation, office equipments, furniture and fittings; (g) medical and first aid facilities; (h) safety equipments and clothing; telephone extension and switchboard, radio communication and the like; @) layout drawings for the approval of the $.0.; MM1/16 13.2 (&) getting approval from the relevant statutory authority; @ dismantling and temoval of all buildings, fences, notices and direction boards, office equipment, etc.; (m) disconnection and removal of services and sealing-off disused services, (®) disposal of surplus materials and reinstatement of site to its original condition. The item for maintenance of Contractor’s accommodation and buildings inclusive of utilities shall in accordance with the Preambles to Bill of Quantities General Direction include: (@) any costs incurred in the use of the land; (©) rental charges (where applicable); (©) fees and charges for water, power, sewage disposal and communication systems; (4) maintenance of all buildings, vehicle access, parking areas, hard standings and footpaths; (©) maintenance of all office equipment, furniture, fittings and communication systems, workshop tools and equipment; (f) cleaning; {g) replenishment of consumables stores. ‘Temporary Works Unit The unit of measurement for the design, construction, maintenance and removal of temporary works as follows shall be Lump Sum. (@) access and haul roads (b) hoardings (©) temporary drainage ‘Measurement ‘The measurement for payment shall be made as follows: (@) 60% on completion of the design and construction of the temporary Works; MMI/I7 133 (>) 20% for maintenance which shall be made in each interim payment in pfoportion of the total period lapsed to the Contract Period (excluding Defects Liability Period); (©) 20% on removal ‘icing Factors The item for access and havl road shall in accordance with the Preambles to Bill of Quantities General Direction include: (@) obtaining licenses, permission from owners of road and relevant authorities and complying with conditions imposed thereto; (6) making arrangements with owners and occupiers of land temporarily acquired and costs arising therefrom; (©) preparing design, amending and submitting to the S.O, and other interested bodies, two (2) copies of all working or shop drawings produced by him including all drawings made by his approved subcontractors for all temporary works; @) construction; ©) maintenance; (removal; (g) reinstatement of site to its original condition. Contractor’s Supervision Unit The unit of measurement for Contractor’s supervision shall be Lump Sum. Measurement The measurement for payment shall be made in each interim payment in proportion of the total period lapsed to the Contract Period (excluding Defects Liability Period). Pricing Factors ‘The item shall be in accordance with the Preambles to Bill of Quantities General Direction include: (@) the wages and other emoluments paid to the site agent and other personnel necessary for the Works; MMI/18 13.4 (b) working outside the Contractor’s normal working hours if so required by the $.0.; (©) costs and expenses incurred consequent upon the employment or hiring of the site agent and all other personnel including payment of Employee Provident Fund, insurance, medical and hospitalization; (@) replacement of unsuitable site agent and other personnel; (©) substitution of superintendent when the appointed site agent is absent or on leave for more than three (3) consecutive days. Mobilisation and Demobilisation of Construction Plant and Equipments Unit The unit for measurement for mobilization and demobilization of construction plant and equipments shall be Lump Sum. Measurement ‘The measurement for payment shall be made as follows: (@) 60% on completion of mobilisation; (b) 40% on completion of demobilisation Pricing Factors The item for mobilisation of construction plant and equipments shall be in accordance with the Preambles to Bill of Quantities General Direction include: (@) transport to site including loading and unloading at ports and site, places of assembly in Melaysia or other sites to the sites where they are to be used on the works; (b) obtaining any import licenses/permits; (© alltaxes, import duties and other fees; @ assembling, erection and installation. ‘The item for demobilisation of construction plant and equipments shall be in accordance with the Preambles to Bill of Quantities General Direction include: (a) dismantling; (b) transport from site including loading and unloading at ports and site; (©) obtaining any export licenses/permits. MML/19 GENERAL ITEMS AND DESIGN AND BUILD ELEMENTS. TE DESCRIPTION OF WORKS Tur AMOUNT No. (@M) «| GENERALITEMS * 4 CONTRACTUAL REQUIREMENTS 4A4 | Performance Bond a) Banker Insurancel Financial Institution Guarantee" sum ) Perormance Guarantee Sum* sum 442 | Insurances 41.24 | Insurance ofthe Works Including Insurance Against Personal sum Injuries and Damage to Properties 14.22 | socso Sum 1.4.3. | Construction industry Development Board (CIDB) Levy Sum Provision of payment for levy to the Lertoage Pembangunan Indust Pembinaen Malaysia under Part Vill of the LPIP Act 1994 andthe ‘Consttction Industry (Levy Collection) Regulations 1996 42 PD's REQUIREMENTS 1.2.4: | Accommodation for the PO's Staff 12:44 | Establishment, maintenance and remaval of office including fitings and furntures ans listed in Appendix AF of the Spactication 42) Alternative 1- JKR Design Type AIBICIDIEJF/G* or Su ') Alternative it- Relocatable Type (newiused)* oF Sum ¢) Altemative ll -Rentel of shoplot Sum 12:42 | Establishment, meintenance and removal of laboratories sum 122. | Services for the PD's Stott 1224 | Provision of suitable transport services as listed in Appendix 1G" of the Spectication @) "08. ype (_vehicle-waeks per vehile) Sum ) “nos. ta — (_ vehisle-weaks per vehicio) Sum ©) “nos. type — (__vehleie-weeks per vehicla} Sum 1.2.22 | _ Operation and maintenance of vehicles 2) nos. ype _{___vahicle-waeks per vehicle) Sum +) “nos. type ( vehicle-wosks per vehicle) Sum ) nos. ype — (__ vehlcle-waeks per vehicle) Sum 12.3. | Equipmonts for use by the PD's Stalt 12.3.4 | Provision and maintenance of laboratory equipments as sted in Sum ‘Appendix 10’ of the Speciation 12.3.2 | Provision ana maintenance of office equipments as ited in ‘Appendix 1E' ofthe Specification a) __nos, mierooomputer system Sum +) ro, photocopy machine Sum ©) 0. cighal camera Sum 4) “a0, facsimile machine Sum ‘e) nos. AS laser jt colour printer Sum ) no, scanner Sum ‘Amount Carried Forwark * Delete whichever is not applicable GENERAL ITEMS AND DESIGN AND'BUILD ELEMENTS TEM ‘DESCRIPTION OF WORKS UNIT AMOUNT NO. (ea . ‘Amount Brought Forward A GENERAL ITEMS (cont 42 O'S REQUIREMENTS (cont'd) 1.24 | Attendance for the PD's staff 12.4.1 | __ nos. drivers (___man-weeks per vehicle) ‘sum 1.24.2 | Laboratory assistants sum a) ___nos. Technician (___man-weeks) b) “nos. Assistant (_“~man-weeks) 128 Setting out, levelling and checking of all Works ‘Sum 128 Miscellaneous 12.6.1 ) Project sign boards (__n0s.) ‘Sum 1.262 | Progress photograph (__weeks) sum 4.2.63) Performance ceport comprising 10 sets of progress report, sum project report and quality control report __weeks) 1.2.64 | Provide and update the Works Programme using Master sum Programme to produce Critical Path Method (CPM) and ‘Works Breakdown Structure (WBS) ec. 38 spectiad in Appendix 1G" including supply of software. 1.265 | as-built drawing including periodic updating as specified in ‘Sum ‘Appendix tH’ 1.2.6.6 || Clearing up of site on completion ‘Sum 12.7 | License security services Sum 1.2.8 | quality Assurance Plan sum Provide @ Quslty Assurance Team ful ime on Site forthe Institution, ‘administration and maintenance of the Quality Assurance Plan and the preperation and submission ofall Quality Assurance Reports ‘as specified, throughout the duration ofthe contract. 1.28 | Provision for locating, eriporary protection and temporary sum relocation of Pubic Utility installations and other services 13 CONTRACTOR'S REQUIREMENTS: 134 Establishment, malntenance and removal of accommodation and bulldings a) Office sum b) Stores and workshops ‘Sum ¢)_ Workmen accommodations Sum ‘Amount Canled Forward * Delete whichever is not applicable GENERAL ITEMS AND DESIGN AND BUILD ELEMENTS [xo | 13 132 138 134 14 tat 142 18 pra DESCRIPTION OF WORKS Amount Brought Forward GENERAL ITEMS (cont'd) CONTRACTOR'S REQUIREMENTS (cont'd) Temsoracy works a} econ and haul reads? by hoardngs* c} temporary erainage Contractor's superintendence A197 2) __no. Project Manager (_ man-weaks) 2) Thos. Engmaors { —_“manwecks} &) _Tnos. Supenvisors (_—_mannwveeks) 4) nas. Clark |_ man weeks) 2) 108. (_ man-weeks) Mobilisation and demobilisation of construction plants and equipments excluding piling and specialise plants OCCUPATIONAL SAFETY ANO HEALTH REQUIREMENT, Occupational safety and health officar (_ man-wesks) Health and safety report (__ weeks) UTILITIES DETECTION WORKS Covering 2) Detection, Survey and Mapping (Level A) of existing above Ground and underground serviges and witias b) Motilsation and demobilsation of equipment, temporary Works and traffic management, ete ©) Proparetion of reports, programme and traffic management plan 4d) Preparation of § sets of Utities and services mapping full colour hard copy drawings At size ®) Preparation of2 sels egal cata on CO-ROM in AUTOCAD format 4) Liason with relevant utities and services provider 8) Consultancy servioas anette during design and construction ONT ‘AMOUNT {Ray Sur, Suro Sum Sum ‘Sum sum ‘Sum ‘Aiount for Genoral items Carried te Collection | * Delete whichever is not applicable "DESIGN AND BUILD ELEMENT’ - KERJA-KERJA SIVIL GENERAL ITEMS AND DESIGN AND BUILD ELEMENTS EW DESCRIPTION OF WORKS NT AMOUNT NO. (RM) B. | DESIGN AND BUILD ELEMENTS > Ma PREPARATION AND PATA COLLECTION ‘Sum Preparatory and aison works for submission of Contractor's Proposal including data collection (sol investigation, detailed ‘engineering survey, trafic survey, te search’ for land acquisition, ete) 12 CONTRACTOR'S CONSULTANTS 121 | Consultancy Services as specified inthe respective ‘Memorandum Agreement for # 4) Civil & Structural Engineer ‘Sum 1.22 | Supemision as per Organisation Chart sum ‘a) __n0. CRE (__ man-weeks) | nos. RE (—_ man-wesks) c) ___nos, ARE (_~__man-weeks) d) nos. Supervisors ‘man-weeks) ‘e) nos. Oraughsman (__ man-weeks) 4) “nos. Clerk (___man-weeks) 9) “nos (_ man-wecks) 43 INDEPENDENT CHECKERS Punfessional services as specified in respect of 4) Structurel sum )) Road Safety um fi), Geotechnical sum Note: The cost shall be the design fee forall works excluding Provisional Sum ‘iount fer Design and Sulld Elements Carried to Collection” * Delete whichever Is not applicable GENERAL ITEMS AND DESIGN AND BUILD ELEMENTS TEM NO. DESCRIPTION OF WORKS ONT ‘AMOONT (RM) 7 SOLLECTION GENERAL ITEMS - From Page ASIA DESIGN AND BUILD ELEMENTS - From Page ASIS ‘AHOUNY CARRIED TO TENDER SUM ANALYSIS, * Delete whichever is not applicable JADUAL KADAR HARGA - KERJA-KERJA SIVIL F. METHOD OF MEASUREMENT AND PRICING FACTORS SECTION 2 - SITE CLEARANCE AND DEMOLITION WORKS 21 CLEARING AND GRUBBING Unit : ha Measurement {it shall be the plan area of the area actually cleared. No deduction shall be made for the areas occupied by buildings, structures or carriageways. Item Coverage ‘The rate shall include = (a) Uprooting and felling of all bushes, tress and hedges; (6) Grubbing up stumps and roots; (©) Filling stump and root holes with suitable material and compaction ; (@ Leaving and protecting those structures, trees, hedges and the like indicated to be left in the contract or directed by the S.O ; (©) Making good damage to any existing structures, services, fences and the like which are designated to remain ; (© Demolition and removal of structures not separately listed or not designated to remain ; (2) Disconnecting and sealing services ; (h) Credit value of materials which become the property of the contractor; () Disposal of surplus materials at soil tips provided by the contractor outside the site and all costs arising therefrom including royalties. 22 DEMOLITION AND REMOVAL OF EXISTING STRUCTURES Unit: sum Measurement It shall be the complete removal of the structure or as directed by the S.0 Item Coverage ‘The rate shall include :~ (2) Demolition of all concrete building, timber building and other structure (exclude the existing bridge) as directed by the S.0; (&) Blasting, excavation and removal of all foundation works and the structures of whatsoever materials and in whatsoever conditions ; (©) Backfiling voids formed by the removal of the foundations and the structures with suitable material from any source and compaction ; (@ _Disconnecting and sealing services ; (©) Credit value of material which becomes the property of the contractor; MM 214 (Q) __ Disposal of surplus material to spoil tips provided by the Contractor outside the Site and all costs arising therefrom, including royalties. (g) Demolished of existing street lighting as directed by the S.0; SECTION 3 - EARTHWORKS 31 For the purpose of this section it shall be assumed that one cubic metre of ‘material excavated forms one cubic metre of compacted fill ard no allowance shall be made in the measurement for bulking and shrinkage and the volume shall be computed net from the drawings. ‘Where (a) Settlement occurs subsequent to the finished earthworks levels having been reached and the compaction of the embankment has been completed in accordance with the Contract ; OR (b) Settlement of or penetration into the ground beneath the embankment occurs; Then the additional deposition, fill and compaction required shall, subject to the provision below, be measured and be paid at the same rate as quoted for the embanksment fil Provided that the first 75mm of settlement or penetration into the ground beneath the embankment shall not be measured, STRIPPING TOPSOIL Unit : m? Measurement It shall be the plan area of topsoil excavated from the surface of the ground after clearing to the depth of average 150mm or as directed by the $.0. Item Coverage ‘The rate shalll include :- (@) Loading into transport ; (6) Haulage and deposition in tempgrary stockpiles including of sites for stockpiles ; (©) Haulage and deposition of surplus in tips off site provided by the contractor ; (@) Multiple handling of excavated material ; (©) Keep the stripped free of water. MM 311 32 3.21 ROADWAY EXCAVATION Y OF ALL. MATERIAL OTHER THAN ROCK The unit of measurement for excavation of suitable materials other than rock, in cutting, below embankments, below formation levels or in borrow pits within the right of way, transpoxt to places of fill or transport to tips off the site provided by the Contractor for disposal shal be cubic metres. Measurement ‘The quantities of excavation in cuttings, below embankments, below formation levels or in borrow pits shall be the net cubic content of voids formed between the original ground surface after stripping and finished surface as shown on the Drawings and specified or as directed by the S.O. Item Coverage (a) ‘Excavation within the right of way in whatever ground condition and terrain that may be met with except unsuitable material and rock but including consolidated hardcore and to any depth; (6) making good overcutting and overbreak; (c) increase in bulk of excavated material; (d) removing roots, foundations, drains, pipes, pavements and all other minor obstructions; (©) loading, hauling and double handling (where necessary) of excavated material fiom the excavation to its point of final use of to disposal or to stockpile including payment and royalties (if any); (® forming benches on slopes of cuttings; (g) Levelling, trimming, shaping and compacting the surface of the ‘excavation and cleaning the exposed surfaces all in accordance with the Specification and to the lines, levels, grade and dimensions shown on the Drawings or as directed by the S.0. (h) Keeping earthworks free from water from from whatever cause; (Upholding the sides of excavation ; ( Selection and separation of materials ; (k) Excavating around and between structures and other obstructions and taking precautions to avoid damage to them ; @ Disposal of surplus excavated material not required for use in the works, levelling and compacting including preparing the disposal areas are providing all drainage and other erosian protection measures in and around the disposal areas; (m) The cost of acquiring or use of land outside the site as disposal areas including payment of royalties, if any ; (a) Provision of sites for stockpiles and the costs arising therefrom including payment of royalties, if any; (0) Erosion protection, unless otherwise and paid for separately ; (p) Additional excavation required for working space, timbering, shoring MM 3/2 3.2.2 or other temporary works and its subsequent backfilling with ‘approved materials and compaction ; (@) replacing suitable material rendered unsuitable; (2) maintenance of the cut areas during the period of the Contract and the Defects Liability Period. EXCAVATION IN ROCK Unit : ‘The unit of measurement for rock excavation shall be cubic metres. Measurement ‘The measurement for excavation of rock in cutting or in structural shall be the nett cubic content, in cubic metres, of the voids formed in cuttings or in structural foundations between the original surface after removal of over- ‘burden and the finished surface as shown in the Drawings and specified or as irected by the $.0. Item Coverage ‘The rate shall include :~ (@) Obtaining all necessary permits ; (6) Prelimanary site trials of blasting ; (©) Boring hole in rock to required depths and size by manual or mechanical means ; (@) Provision of magazine for storing or explosives, fuses and detonators; (©) Supply, prime and firing of explosive charges ; (Warnings and all security measures, and provision fuses and detonators ; (2) Loosening and breaking up by pneumatic drills or other means or ripping by use of tractor mounted and drawn ripper in places where blasting is not permitted by the S.O (a) Increase in bulk of excavated material ; (® Selection and separation materials; @ Loading, hauling and double handling (where necessary) of excavated ‘materials from the excavation to its point of final use are to disposal areas are to stockpile including payments of royalties (if any); (&) Provision of sites for stockpiles and the costs arising therefrom, including payment of royalties, if any; () making good overcutting and overbreak ; (m) trimming of formation and slopes; (0) Forming benches on slopes of cuttings where required and clearing away loose rock ; (0) Keeping excavation free form water from Whatsoever cause. (p) additional excavation the Contractor may require for working spec, timbering, formwork or other temporary works and its subsequent backfilling with approved materials and compaction; MM a3 3.2.3 (@ excavation arround and between piles, structures and other obstructions and taking precautions to avoid damage to them; (®) inthe case of the watercouses and culverts, grading beds and working in a dealing with the flow of water; (s) disposal of surplus excavated material not required for use in the works, levelling and compacting including preparing the disposal areas; (0) the cost of acquiring or use of tand outside the site as disposal areas including payment of royalties, charges and fees. EXCAVATION OF UNSUITABLE MATERIAL Units ‘The unit of measurement for excavation of unsuitable materials shall be cubic metres. Measurement The quantities excavation of unsuitable material shall be the nett cubic content of the voids formed in the excavation below proposed embankments within the right-of-way between the original ground surfaces after stripping and the good ground surfaces as shown on the Drawings and specified or as directed by the S.0. Item Coverage Rate of excavation of unsuitable materials shall include (but without limiting the stipulation that the rates shall be inclusive of all costs): (a) Excavation of unsuitable material within the right-of-way; () Excavating around and between piles; (©) Additional around the Contractor may require for working space, timbering formwork or other temporary works and its subsequent backfilling with approved material and compaction, (@) Increase in bulk of excavated material; (©) Removing roots, foundations, dsains, pipes, pavements and all other minor obstructions; (8 Transport and double handling (where necessary) of excavated materials to sides of embankment and disposal areas including payment of royalties (if any); (e) Disposal of excavated materials not required for use in the works; (b) Upholding the sides, (@ Replacing with the suitable material; () Keeping excavation free from water from whatever cause; {&) Taking precautions to avoid damage to property, structuces, sewers, drains and services. MM aia 33 PLACEMENT AND COMPACTION OF EARTH EMBANKMENT Unit : ‘The units of measurement for placement and compaction of suitable fill ‘material or rock fill in embankments and surcharge to embankments where necessary or instructed shall be in cubic metre. jeasurement The units of measurement for placement and compaction of suitable fill materials shall be made of the volume of the embankment measured from the original or stripped or excavated ground levels to the finished, levels, grades and dimensions shown on the Drawings or as directed by the S.0. The line of the top of embankment shall be the formation levels or surcharge levels as shown on the Drawings and for the embankment over soft ground the settled volume as derived and computed by the method as stated below shall be added to the volume above for payment. (@) Prior to the commencement of filling works, rod settlement markers shall be installed by the Contractor at the edge, at the toes and at the centre line of the embankment at the approximately 75 metre intervals or at closer spacings as approved by the 8.0. (b) The measured settlement which is the difference in level between the initial level (to be taken immediately after the compaction of the first layer of fil over the soft ground area) and the final level (taken immediately after the completion to shape and levels of the surcharge work) of the respective rod settlement gauges shall be the settlement of the embankment at those locations; (©) For the purposed of computing the volume of embankment setiled, the first 75mm of the settlement as obtained above shall be subtracted from the measured settlement; (@) The net settlement as derived above shall be assumed linear and shall be used for calculating the volume of embankment settled below the foundation level. - Item Coverage ‘The rate shall include :~ (a) Selection of suitable material, depositing, spreading, leveling, compacting and finishing of embankment or fill including filling in swamps and old water courses. (Materials placed beyond requirement shall not be measured) ; (b) Shrinkage in compacted material; (©) The mechanical or chemical treatment of soil required to facilitate the use of particular plant; MM 315 34 (@) Placing fil to slope away from vertical drainage layers and providing temporary drainage to prevent surface water from entering such drainage layers; (©) Forming and trimming of side slopes, benching and berms including to required Jevels and contours; (Keeping earthworks free from water; (g) Taking precaution to avoid damage to property, structures, sewers, drains and services; (hb) Replacing suitable material rendered unsuitable; (i . Processing on or off site to bring material within the required moisture content limit for compaction; @ Complying with requirements for the equalisation of earth pressures or the sequence or rate of filling; (6) Placement and compaction of the first 75mm of fil resulting from the settlement of or penetration into the underlying material beneath embankment; () Operations necessary to produse an acceptable ground surface where the method of deposition and compaction of material into soft areas or below water is adopted; (m) Blinding of rock fill; () Spreading, levelling and compaction of suitable material for the protection of subgrade and its subsequent removal; (0) Additional instrumentation to suit the contractor’s method of work; (p) Standby and waiting time for tests to be carried out; (@ Complying with the requirements of staged construction and the estimated period of considalition before the removal of the surcharge material; (Provision of tellteles and working around them; (s) Trials by the Contractor to demonstrate compaction methods different from those stated in the contract except that materials compacted by such trials and accepted as part of the Works will be included in the measurement of the Works. ORROW, PLACEMENT AND COMPACTION OF EARTH EMBANKMENT Unit : - The unit of measurement for borrow, placement and compaction of earth ‘embankment from Contractor's own source shall be cubic metre. Measurement ‘The quantities of excavation in borrow pits outside the right of way or approved imported material for road embankment construction shall be the nett cubic metres of the compacted embankments constructed to the finished lines and levels as shown in the drawings and specified or as directed by the 8.0. MM 316 Item Coverage The rate shall include (a) (b) © (d) © 3} (e) ) oO w oO (m) &) (0) @) © (s) ® qu) ” ™ ‘Supply of approved materials of stated types from sources outside the site including royalties and other costs including for searching for and «finding borrow pits, acquiring the right to occupy the sites and extract material, obtaining right of access, establishing and maintaining access, Excavation in whatever ground that may be met with and costs of the approved filling material; Loading, hauling and double handling (where necessary) to points of deposition or stockpiles including payment of royalties (if any); Provision of sites of approved imported filling material; Increase in bulk of approved imported filling material; Depositing, spreading, leveling, compacting and finishing of embankment or fill including filling in swamps and old water courses. Filling placed beyond requirement shall be measured); Shrinkage in compacted material; The mechanical or chemical treatment of soil required to facilitate the ‘use of particular plant; Placing fill to slope away from: vertical drainage layers and providing temporary drainage to prevent surface water from entering such drainage layers; Forming and trimming of side slopes, benching and berms including to required levels and contours; Keeping earthworks free Grom water, Take precautions to avoid damage to property, structures, sewers, drains and services; Replacing suttable materials rendered unsuitable; Processing on off site to bring material within the required moisture content limit for compaction; Complying with requirements for the equalisation of earth pressures or the sequence or rate of filling; Placement and compaction of the first 75mm of fill resulting from the settlement of or penetration into the underlying material beneath embankments; Operations necessary to produce an acceptable prownd surface where the method of deposition and compaction of material into soft areas or below water is adopted; Blinding of side slopes; Spreading, levelling and compaction of suitable material for the protection of subgrade and its subsequent removal; Additional instrumentation to suit the contractor's method of work; Standby and waiting time for tests to be carried out; Complying with the requirements of staged construction and the estimated period of considalition before the removal of the surcharge material; Provision of tell-teles and working around them; MM 37 35 3.6 (x) Trials by the Contractor to demonstrate compaction methods different from those stated in the contract except that materials compacted by such trials and accepted as part of the Works will be included in the measurement of the Works () Maintenance of embankments and fil areas during the period of the Contract and the period of maintenance. PREPARATION OF FORMATION Unit: of Measurement It shall be the plan area of the platform prepared to the lines and grades shown in the drawings or as directed by the S.0. Item Coverage The rate shall include :- (a) Protection of the formation with suitable material and its subsequent removal; (&) Taking measures to protect the formation from deterioration and contamination due to ingress of water and the use of construction plant; (c) Cleaning, leveling, trimming, grading and compacting the surface in accordance with the Specification. PROTECTIVE VEGETATION FOR EROSION CONTROL The unit of measurement for close turfing to surfaces at any inclination shall be square metre, Measurement ‘The Measurement for close turfing to surfaces shall be made of the sloping area placed to the lines, level grades and dimensions shown on the Drawings or as directed by the 8.0. Item Coverage ‘The items for close turfing shall be in accordance with the Preamble to the Bill of Quantities General Directions including:- MM 38 3.7 ENAT 312 3.7.3 3.74 (2) removal of debris from the surfaces of earthwork to be turfed; (b) the preparation of the areas to be turfed, including if appropriate the amount of topsoil to be used and its method of application; (©) the details and results of investigations to determine which types of grass and legume are compatible with the soil in the areas to be turfed. (4) the types of grass and legume (if any) and strains of seed to be used, and the function, root and growth characteristics of each type; (©) the rates of application of the grass and legume seeds, (© the composition of fertiliser to be used at the time of turfed and its rate of application; (g) the type of mulch to be used and its method and rate of application; (h) the amounts of lime or other chemicals (if any) to be applied to improve the soil before, during and after turfing; @® the equipment and methods to be used in placing the turf and other materials; (k) the cultivation and after-care of the turfing areas, including rates and frequencies of watering, fertilising, grass cutting and general maintenance for | year after hydroseeding; () —anestimate of the time required after turfing for establishment of a permanent, dense growth of grass which will require minimal maintenance, and (m) any documentation or case histories demonstrating the previous success of the proposed method. R.C RETAINING WALL EXCAVATION As set out in the M.O.M Section 3-Earthworks. CONCRETE As set out in the M.O.M Section 8-Conerete for Structures. FORMWORK ‘As set out in the M.O.M Section 8-Concrete for Structures. STEEL REINFORCEMENT - ‘As set out in the M.O.M Section 8-Concrete for Structures. MM 3i9 SECTION 4 - DRAINAGE WORKS 4d 412 SURFACE DRAINS EXCAVATION FOR DRAINAGE Unit: The unit of measurement for excavation of drains if separately measured shall be cubic metres. Measurement Excavation for drains, water courses culverts and foundations if separately measured shall be measured nett and the dimensions for the purpose of measuring shal! be based on the horizontal area at the bottom of the wall, foundation or other structure to be built multiplied by the mean depth. The ‘mean depth shall be taken from the foundation level to the finished surface or formation level as shown on the Drawing or the existing ground level, whichever is lower. The quantities of excavation for open drains and ditches are to be the nett cubic content, in cubic metres, of the void to be to be formed by the removal of excavated in accordance with the specification and Drawings. Item Coverage ‘These shall include for the foilowing:- (2) Getting out roots, foundations, drains, pipes and all other minor obstructions; (b) Excavation in whatever ground may be met with (except hard rock) including consolidated hard-core; (©) Removal of pavements, (@ Hand or machine digging (©) Timbering or other temporary works in supports to sides of excavations; (®) Additional evcavations required for tembering of formwork; (g) Kepping the excavations free from water from whatever cause arising, by pumping, building of gofferdams, sheet piling as directed; (b) Double handling where necessary in connection with the removal and disposal of excavated materials; () Transportation and disposal of excavated materials unsuitable for or not required for use in the work; () _ Timming and dressing bottoms, sides and slopes of excavation. DRAINS Unit The unit of measurement for surface drain (type to be specified in Bill OF Quantities) shal! be linear metre. MM ait 413 Measurement It shall be measured along the centre line of the drains between any of the following:~ (a) the external faces of headwalls, sumps and manholes (b) the intersections of the centre lines at drain junctions (©) the position of terminations shown in the drawing (@) the point of change of stage depth ‘The depth of drains shal! be the vertical measurements between the invert and one of the following as the case may be: (@) where the invert level is below existing ground level - the measurement shall be taken ti the existing ground level, except that where the finished earthwork level is below existing ground level, the measurement shall be taken to the finished earthwork levels; (b) where the invert is at or above the existing ground level as in the case of shoulder drain, the measurement shall be taken to the finished earthwork levels. The average depth to invert shall be the arithmetic mean measurements of depths taken at intervals of 10 metres along the drains starting at the outfalls. For terminal lengths of drains less than 10 metres, the measurements of depth shall be taken at their ends. Item coverage (@) concrete drain section (cast in-situ or precast) (b) formwork and reinforcement. (c) blinding and bedding. (d) stepping of inverts. (©) cement mortar. (® locating, hacking through, cutting reinforcement and joining into the existing sumps, headwalls and the like. (g) multiple handling and disposal of surplus material. (h) reinstatement of surfaces. (i) taking precautions to prevent siltation and desilting prior to handing over. BRICKWALL Unit The unit of measurement of brickwall shall be square metre. Measurement The measurement shall be actual area of wall constructed as specified in drawings and as directed and accepted by the S.O. mm ar2 42 43 Item coverage The item shall include:- (a) Transport, labour and materials required to prepare the wall foundation; (&) Excavation, backfilling, levelling and compaction of approved material; (©), Weephole including geoteatile filter fabric and graded filter material where specified or shown in drawings, (@) earthworks free of water Keeping; (©) Taking precautions to avoid damage to property, structures, sewers, drains and services. REINFORCEMENT CONCRETE STRUTS Unit -m Measurement ‘The length of R.C Struts shall be actual length of struts measured along the centre lines of the strut. Item coverage The item for precast reinforced concrete slab shall include: (a) Formwork; (>) Reinforcement (c) Conerete grade 20/20 and curing protection; (6) Placement, align and cement mortar for setting, jointing and pointing. SUMPS (BRICK OR R.C) Unit - nr Measurement It shall be the complete construction of walls and base. Item coverage (@) excavation in any material except rock to any depth, dewatering upholding the sides, keeping the excavation free of water backfilling with approved material from any source and compaction. (b) excavation and filling of soft spots with bedding material and ‘compaction. (©) taking precautions to avoid damage to existing works including providing temporary supports. Mw ara 44 (A) (d) additional excavation for working space and its subsequent backfilling. (e) trimming of side slopes and inverts to required level (Q blinding and bedding, (g) concrete, formwork and reinforcement. (h) movement joints. (2 ___ brickwork and rendering for brick sump. G) channels, benchings, building in pipes and drains, step irons, safety chains, ladders, handholds and the like. (k) weepholes including geotextile filter fabric and graded filter material where specified or shown in the drawings. (Disposal of surplus material. (mm) _ reinstatement of surfaces. (n) taking precautions to prevent siltation and desilting prior to handing over. (0) waiting time for the S.0. to determine foundation strength at invert level or lower level after excavation and to determine foundation type from insitu test results. CULVERT PRECAST REINFORCED CONCRETE BOX CULVERT (NEW OR EXTENSION) U: -m Measurement It shall be measured along the centre line of the culvert between the external faces of sumps or headwalls. Item coverage (®) excavation in any material except rock to any depth, dewatering, upholding the sides, keeping the excavation free of water backfilling with approved material from any source and compaction. (6) excavation and filling of soft, spots with bedding material and compaction. (©) taking precautions to avoid damage to existing works including providing temporary supports. (@ additional excavation for working space and its subsequent backfilling. (©) trimming of side slopes and inverts to required level (© supply of precast box culverts to the specified size. (g) transport, unload, storage and multiple handling. (h) hardcore and sand bedding. () formwork and reinforcement. (cutting, laying and jointing. (k) joint filter, sealant and waterstops where specified or shown in drawings, () building pipes to headwalls or sumps. Mi ait 45 AG over. 4.6.1 (m) disposal or surplus material (a) reinstatement of surfaces. (0) taking precautions to prevent siltation and desiiting prior to handing over. {p) waiting time for the 8.0. to determine foundation strength at invert level or lower after excavation and to determine foundation type from insitu test results. gINFORCEMENT __ CONCRETE BOX _ CULVER’ PROTECTION WORKS. Unit - nr Measurement It shall be the complete construction of headwall, wingwall, apron and protection works Item coverage (a) excavation in any material except rock to any depth, dewatering, upholding the sides, keeping the excavation free of water backfilling ‘with approved material from any source and compaction. (b) excavation and filling of soft spots with bedding material and compaction. (©) taking precautions to avoid damage to existing works inchading providing temporary supports. () additional excavation for working space and its subsequent backfilling {e) trimming of side slopes and inverts to required level (8 blinding and bedding, (g) concrete, formwork and reinforcement. (h) matress apron including geotextile filter where specified or shown in the drawing. (movement joints. () _weepholes including geotextile filter fabric and graded filter material where specified or ra (K) disposal of surplus material. () reinstatement of surfaces. a (m) taking precautions to prevent siltation and desilting prior to handing (x) waiting time for the S.O, to determine foundation strength at invert level or lower level after excavation and to determine foundation type from insitu test results. PRESSURE TREATED TIMBER PILES Mobilisation and demobilisation init MM ais 4.6.2 ‘The units of measurement for mobilisation and demobilisation of plant and equipment for construction and completion of piles shall be sum. Measurement a) The measurement for payment of mobilisation and demobilisation of plant and equipment for construction and completion of pile shall be ’) 80% of the tender sum upon complete mobilisation of plant for the construction of the bridge. ii) 20% of the sum upon the removal of plant from the site, Item Coverage (a) The items for establishment of plant and equipment for constsuction and completion bored pile shail be in accordance with the Preambles to Bill of Quantities General Directions including :- (i) bringing plant and equipment to the site of the bridge or other structure; ii) erecting and setting up plant and equipment including site preparation, levelling and access ramps; (Gimoving and setting up plant and equipment at each pile position including site preparation or levelling, iv)dismantling and removing plant and equipment from site on completion Supply and deliver Unit - nr Measurement a) It shall be the number of pile of stated length expressly required to be supplied of specific cross-section type and cross-sectional dimensions. b) Piles that fail to meet the pile acceptance criteria will not be paid for. The Contractor is solely responsible for assessing and ordering adequate lengths of piles required for the completion of the Works. Item coverage a) Transport and delivery to Site, off loading, stacking and storing on Site b) Marking members for identification and delivery in matching sequences ©) Removal from Site of surplus pile lengths @) Removal from Site of failed and rejected piles ) Substitution of failed and rejected piles or compensation piles f) Mild steel joint sleeve g) Submission of preservative treatment certificate, to supply starter pile with tapered points and the extension piles with chamfers at the pile ends, prefabricated joints and joint fitments MM 46 4.6.3 Handle,Pitch and drive Pressure-Treated Timber Piles Unit -m Measurement a) It shall be the lengths permanently incorporated into the works and accepted by the S.O. and shall be measured along the axis from the toe ‘of the pile to the specified cut-off level b) "The handling, pitching and driving of piles that fail to meet the pile acceptance criteria will not be paid for. Item coverage a) _ Setting out of pile positions b) Taking from store, handling, pitching and driving piles in accordance with the Specification ©) Driving piles to any inclination 4) _ Driving trial piles to determine the pile length requirements e) Jetting where permitted by the S.O 4) Moving plant and equipment from one pile position to another pile position and from one piling site to another piling site including site preparation, levelling and access ramps to individual piles 2) Moving plant and equipment back and redriving risen piles h) Lengthening including welding and testing of joints and welds as specified i) Lost time due to moving plant and equipment and standing time and disruption caused by the process of lengthening and overcoming obstructions J) Taking observations and compiling pile records and supplying two copies to the S.0. k) Walings, ties and the like 1) Achieving tolerances m) _ Redriving or further redriving of piles as directed n) Stripping of concrete and exposing the reinforcement in pile heads and bending projecting reinforcement 0) Capping plate p) Continue driving to a driving resjstance higher than twice the working load including change to a heavier hammer where necessary to achieve the set requirement as specified. q) Cutting off piles and removing and disposing from the Site, surplus Jengths of piles 1) Supply and install mild steel plates, starter bars and spiral binding reinforcement to connect piles to pile caps all to details as shown on the drawings uM 47 4.6.4 Pile Testing Unit - nr Measurement ) It shall be the number of completed load tests on piles which have met the pile acceptance criteria. Item coverage a) Setting up test rigs, PDA Test, cable anchorages, anchor piles and reference bench marks and dismantling and removing them on completion b) Providing, calibrating, setting up, operating and maintaining instruments and apparatus required to complete the tests, ©) Constructing temporary pile caps and subsequent stripping off @) Applying and re-applying the test load and releasing e) Taking readings, measurements and observations of pile performance under test and recording and supplying two copies of the record of each test to the S.0 ) Moving plant and equipment from one pile test location to another and from site including site preparation, levelling and access ramps 2) In the case of trial pile testing all additional costs involved in bringing testing equipment and and PDA Test to Site and removing on completion of test. MM a8 SECTION 5 : PAVEMENT WORKS 5 5.2 SCARIFY AND BREAKUP OF EXISTING PAVEMENT Unit The units of measurement for scarify and breakup of existing pavement shall be square mete, Measurement The measurement of scarify and breakup of existing pavement shail be the surface area of that material to be scarified and breakup to receive the new pavement as instructed by the $.0. ‘tem Coverage The item shail be full compensation for scarifying and for break up as directed by the S.O., compacting and for all plant, equipment, labour, and incidentals necessary to complete the work. The items for scarifying and breaking up existing flexible pavements, shall be in accordance with the Preambles to Bill of Quantities General Directions including :- (a) re-shaping and rolling; (>) shaping to cambers, falls and crowns; (©) breakdown of material to comply with the requirements of fill: (@) multiple handling of material; (©) breaking up of existing pavement to as specified depth inclusive of granular subbase, roadbase, bituminous surfacing courses and subgrade material; (© taking precautions to avoid damaging surrounding works, (g) disposal of materials where required at spoil tips provided by the Contractor outside the Site and all costs arising therefrom. including royalties; (h) levelling, trimming shaping and compacting to requirements as specified and to lines, levels and grades shown on the Drawings or as directed by the $.0. (@ cleaning of completed works; @ use of road cutter for cutting of any vertical edge. UNBOUND PAVEMENT COURSES Unit The units of measurement for :~ (® — Sub-base. (b) Crushed aggregate roadbase. shall be cubic metre, MM s/t

You might also like