You are on page 1of 4

2010 International Conference on Innovative Computing and Communication and 2010 Asia-Pacific Conference on Information Technology and Ocean

Engineering

Design and Implementation of Network Information System for Large Project


Construction Management

Guan Jiaqing Tang Jingying


School of Urban Design School of Urban Design
Wuhan University Wuhan University
Wuhan City,China Wuhan City,China
ggjjqq9271@163.com townj@163.com

Abstract—Based on practical construction management of procedures, rules and regulations and relevant technical
large construction projects, this paper demonstrates how to standards. Systems such as project legal person
establish a network information system suitable for project responsibility system, public bidding system, construction
construction to facilitate prompt information supervision system and contract management system shall
communication, real-time process control and decision be strictly implemented. Construction management system
support so as to achieve overall control of construction combining project legal person, designer, consultant and
progress, cost and quality and to realize the scientific and construction unit shall be established through contractual
modernized project management. relationship. Management of these projects involves
multiple parties and includes construction progress,
Keywords- Large construction project; network system;
design; implementation;
quality, safety, technology, contracts, funds and
equipment, etc. with frequent information exchange and
mass data which are correlated and mutually-restrained.
I. INTRODUCTION These characteristics require that network information
Large project construction is complicated systematic system for large project, based on project management,
work, during which many factors are correlated and shall be built in such a manner to be able to overall control
mutually-restrained. To facilitate better project the construction progress, cost and quality, especially cost
management, system engineering method and network control and information communication. Procedural and
technology shall be used to make in-depth analysis on standardized management shall be implemented to
mass project data produced during project planning, improve project management.
organizing, coordinating and control process so as to
promptly master actual project condition and to control III. SYSTEM REQUIREMENTS
construction better. In recent years, computer and network In order to realize control of construction progress,
technology have been applied in construction project quality and cost, the network information system shall
information management and have brought good result. meet the following requirements: Firstly, the system shall
This paper will discuss how to establish a network be able to provide overall control of data related with each
information system to provide pre-analytical prediction, phase and aspect of project construction, including
dynamic process control and decision support for construction progress, quality, contract, finance, design,
construction management of large project so as to improve documentation, materials and equipment, safety,
work efficiency, reduce project cost and manage the construction site and cost (plan, implementation, control
project in a scientific manner. and feedback). Secondly, the system shall be able to make
analysis and prediction on management object based on
II. CHARACTERISTICS OF LARGE PROJECT budget estimate, budget and practical data. Thirdly, the
CONSTRUCTION system shall be able to classify control objectives
Large projects means those built for the benefit of all according to duty, management level and construction
people and utilization of resources. These projects procedures of each party. Through defining their duty and
characterize in extensive influence, big investment, making clear the relationship and data flow among each
technical difficulty, complicated environment and long party, a comprehensive control system characterizing in
construction period, which require project construction to hierarchical authorization and responsibility is formed.
be conducted complying with basic construction

978-0-7695-3942-3/10 $26.00 © 2010 IEEE 20


DOI 10.1109/CICC-ITOE.2010.12
Figure 1. The network information system.

application system. It also allows adjustment and variation


IV. OVERALL SYSTEM STRUCTURE of department.
A. Application System B. Structural System
The system horizontal management objective includes Network based software architecture mainly includes
manpower, finance, materials and equipment, Client/Server and Browser/Server. However, since the
documentation which form different subsystems. Each Client/Server system requires higher quality of hardware,
subsystem is vertically divided into three levels of service software and personnel for clients, the system is generally
systems including decision-making level, management installed on the INTRANET structure. And the
level and operational level. The three level service system BROWSER/SERVER is applied. Clients can conduct
involves project legal person, business department, design internal information processing and external information
party, consultant and construction party, etc. The decision- inquiry through uniform interface of the browser. This can
making level reflects management and decision-making achieve “zero maintenance” for clients and reduce total
function of the project legal person. Data of this level system maintenance cost greatly.
derive from data of the management level. The
management level provides comprehensive accurate V. NETWORK DESIGN
information and decision-making suggestion for the The network platform shall be established in such a
decision-making level. Data of this level is formed manner to meet requirements such as resource sharing
through summarizing, analyzing and processing of basic within the system, paperless office, management
data from the operational level. The operational level application system, Internet access, E-mail and remote
mainly involves practical operation work of functional login, etc. The design is based on 200-300 computers.
department of the project legal person and the consultant, Ethernet topology structure is applied. 1000Mbps twisted
construction party and design party, etc. This level has to pair/optical fiber is used to connect to the switch and the
deal with mass basic data and is the basis of the 3-level server. Through the switch, users can adopt Gigabit
service system. The application system has the following copper cable/optic fiber to access to the core switch.
advantage: The functional structure of the whole network Multi-Service router is adopted for Internet outlet. And
information system is provided for the whole management Secpath F1000-C or UTM is used as security gateway and
level to ensure the source of information collection. It is VPN access gateway for mobile users.
relatively independent and can be assembled with different

21
Figure 2. Network Design.

It has the advantage of simple structure, quick punishment, contractor’s manpower, material and
installation and easy use. Maintenance requires no equipment schedule and consumption, construction
professional personnel. It adopts Gigabit for the main part progress, contract payments, contract acceptance and final
and Mb access so that network information flow account, etc.
congestion and server bottleneck is uneasy to occur.
5) Material and equipment procurement management:
Network delay is rare. Its flexible network architecture
makes it possible to be expanded according to user’s need This module is mainly used to follow up and control the
as well as to protect existing investment. whole process from application, procurement, transport
and storage of material and equipment to installation.
VI. SYSTEM FUNCTION DESIGN 6) Capital and financial management: The module is
According to design concept of application system, used for management of accountancy service such as
sub-module of system function mainly includes: project cost settlement and payment of charges. This
1) Project schedule management: This module mainly module includes payment voucher management,
includes investment schedule, design schedule, accounting document entry and review, cheque application,
procurement schedule and construction progress schedule. accounting, preparing of chart of accounts, contract
In other words, modules such as 4-level project schedule payment account and fixed assets management, etc.
are established based on design management, construction 7) Quality management: This module is used to
contract and actual site condition. control whether construction of each quality control unit
2) Cost control: This module is mainly adopted to complies with quality requirements, including quality
establish project budgetary estimate and prediction and to inspection standard, unit engineering break-down, work
follow up cost, including budgetary estimate management, procedure inspection record, material and sample
engineering settlement, contract cost forecasting, price inspection record, registering and dealing with quality
difference management, capital flow and unit price defect, quality acceptance and assessment, etc.
analysis, etc. 8) Safety management: This module is mainly for
3) Design management: This module is mainly used maintenance of relevant construction safety information,
for management of design of the whole project, including including safety measures, safety inspection, accidents,
the whole project design schedule, budget, submitting accident casualty, safety conference, and safety training,
progress of design drawings and technical data and their etc.
quality. 9) File management: This module is mainly to control
4) Contract management: This module is adopted to file receiving, issuing and file stream at filing position.
provide management for the whole process of bidding, And it is responsible for registering, receiving, retrieval
contract signing, contract performance, contract payment and management of all project documents.
and contract acceptance. It includes sub-module such as
bidding management, contract basic information
maintenance, contract alteration claims, reward and

22
VII. CONCLUSION functional modules and working program are provided.
This paper firstly decides the objective of network This system is of high pertinence, practicability and
information system for large engineering construction operability.
management. Based on management content, management REFERENCES
level and work flow, overall planning and design is
[1] AN hongchang,Information systems project management and
conducted with regard to contract management, investment knowledge management[M],Chinese Literature and History Press,
control and construction progress control by combining Bei Jing, China, 2005.
characteristics of large project construction management. [2] SHENG shoulin, Principles of remote power system
In this paper, system requirements, overall structure, monitoring,2e[M], China Electric Power Press, Bei Jing, China,
1998.

23

You might also like