SAP S/4HANA Controlling
Direct Activity Allocation
* Indirect internal activity allocation, the activity output is measured, entered, and assigned. To do so, you
Must create the corresponding measurable tracing factors (units of measure for cost occurrence) in the SAP
system which are known as activity types.
* Actiyity allocation starts through the confirmation of work operations o recording activity data, Thereupon
the SAP system multiplies the resulting activity by the price rate defined for the activity type
* Ifthe receiver ofthe activity allocation isnot a cost object (or example, cast center, business process or
internal order) and no manually set price exists, then the plan price is used
*+ If you do not make iterative price calculations, the SAP system uses the manually-set price of the activity type
or business process for direct activity allocation; that is, the price of the version plan/actual (000).
* Ifthe receiver of the activity allocation isa cost object (or example, production order ora product cost
collector), then the prices used in the valuation are determined based on the valuation variant. In this case,
the valuation variant is linked to the cost object through the costing variant for the simultaneous costing
+ Ifthe receiving cost object is not tied with a costing variant for the simultaneous costing, then the planned
price for the period is used for the valuation
+ The following tables are updated in SAPS/4HANA Finance through activity allocation ie, COBK, COEP and
aDirect Activity Allocation
- Secondary Cost Element
* Secondary cost elements are needed to create Activity type master
data with the category — 43 (Internal activity allocation) — T-code:
FSOO
* Menu path: SAP Easy Access -> Accounting -> Financial Accounting -> General
Ledger -> Master Records -> G/L Accounts -> Individual Processing -> Centrally
OR
+ Menu path: SAP Easy Access -> Controlling -> Cost Element Accounting ->
Master Data -> Cost Element -> Individual Processing -> Edit Cost ElementDirect Activity Allocation
-Activity Type Master Data (Individual/Group)
* To create Activity type master data with category 1 (Manual entry,
manual allocation)
* Activity type master data requires Secondary cost elements with category —
43
* Transaction code: KLO1 — Individual Processing
+ Menu path: SAP Easy access -> Accounting -> Controlling -> Cost Center
‘Accounting -> Master Data -> Activity Type -> Individual Processing -> Create
* Transaction code: KLH1 — Group Creation
* Menu path: SAP Easy access -> Accounting -> Controlling -> Cost Center
Accounting -> Master Data -> Activity Type Group -> Create
* Display Activity Types: Master Data Report — T-code: KL13Direct Activity Allocation
* Transaction code: KP26
+ Menu path: SAP Easy access -> Accounting -> Controlling -> Cost
Center Accounting -> Planning -> Activity Output/Prices
* You can do planning for sender cost center, sender activity type or the
respective groupDirect Activity Allocation
* Display Cost Centers: Activity Types: Period Breakdown — T-code:
S_ALR_87013646
* Display Cost Centers: Activity Types: Scheduled/Plan — T-code:
S_ALR_87013647
* Display Cost Centers: Period Breakdown Actual/Plan — T-code:
S_ALR_87013640Direct Activity Allocation
- Price Postings - Actual
* Transaction code to enter Actual Price: KBK6
* Menu path: SAP Easy access -> Accounting -> Controlling -> Cost
Center Accounting -> Actual Postings -> Actual Price -> Enter
* Display Cost Centers: Activity Types: Period Breakdown — T-code:
S_ALR_87013646SAP S/4HANA Controlling
- Direct Activity Allocation - Actual
* Transaction code: KB21N
* Menu path: SAP Easy access -> Accounting -> Controlling -> Cost
Center Accounting -> Actual Postings -> Activity Allocation -> Enter
* Besides Cost center, the other valid receivers are Network and Sales
order itemSAP S/4HANA Controlling
- Direct Activity Allocation - Reverse
* Transaction code: KB24N
* Menu path: SAP Easy access -> Accounting -> Controlling -> Cost
Center Accounting -> Actual Postings -> Activity Allocation -> ReverseIndirect Activity Allocation
in SAP S/4HANA Controlling
— Plan“enu"Aetvval DataSAP S/4HANA Controlling
- Indirect Activity Allocation
* Indirect activity allocation automatically allocates planned and actual
activities
* Unlike manual planning or actual activity allocation, you define keys to
allocate the activities
* In Indirect activity allocation, You define allocation cycles if you want
to allocate an activity across different cost objects in both planning
and actual during period-end closingIndirect Activity Allocation
- Secondary Cost Element
* Create Secondary cost element for Machine Hours — T-code: FSO0O
+ Menu path: SAP Easy Access -> Controlling -> Cost Element Accounting ->
Master Data -> Cost Element -> Individual Processing -> Edit Cost ElementIndirect Activity Allocation
- Activity Type Master Data
* Create Activity Type with category 3 (manual entry, indirect
allocation) — T-code: KLO1
* Menu path: SAP Easy access -> Accounting -> Controlling -> Cost Center
Accounting -> Master Data -> Activity Type -> Individual Processing -> CreateIndirect Activity Allocation
- Activity Type/Price - Plan
* Create Activity Type/Price Planning — T-code: KP26
+ Menu path: SAP Easy access -> Accounting -> Controlling -> Cost Center
Accounting -> Planning -> Activity Output/Prices
* Display Cost Centers: Activity Types: Period Breakdown — T-code:
S_ALR_87013646
* Display Cost Centers: Activity Types: Scheduled/Plan — T-code:
S_ALR_87013647
* Display Cost Centers: Period Breakdown Actual/Plan — T-code:
S_ALR_87013640SAP S/4HANA Controlling
- Allocation Cycles
* Allocation cycles are defined if you want to perform an assessment or a
distribution
* These allocate the activities or cost to different cost objects where they are
originally belonged to
* Every cycle consists of one or more allocation segments
* Within each allocation segment, you define the sender and receiver for the
allocation segment, as well as the allocation rules
* You can define several cycles that are then processed by the system in the
order in which they were entered
* The system ensures that a cycle is processed in full before the next cycle is
carried out
* Allocation cycles are created in Display IMG screen and are executed in SAP
Easy access screen as one of the periodic activitiesIndirect Activity Allocation
- Create Plan Indirect Activity Allocation Cycle
* Create Plan Indirect Activity Allocation Cycle — T-code: KSC7
* Menu path: Display IMG -> Controlling -> Cost Center Accounting ->
Planning -> Allocations -> Activity Allocation -> Indirect Activity
Allocation -> Define Indirect Activity Allocation
* Planned Cycle: ZPIAO2Indirect Activity Allocation
- Execute Plan Indirect Activity Allocation Cycle
* Execute Plan Indirect Activity Allocation Cycle — T-code: KSCB
* Menu path: SAP Easy Access -> Accounting -> Controlling -> Cost
Center Accounting -> Planning -> Allocations -> Activity Allocation ->
Indirect Activity Allocation
* Display Cost Centers: Period Breakdown Actual/Plan — T-code:
S_ALR_87013640
* Display Cost Centers: Activity Types: Period Breakdown — T-code:
S_ALR_87013646Indirect Activity Allocation
- Sender Activities/Enter Services - Actual
* Transaction code: KB51N (Sender Activities / Enter Services)
* Menu path: SAP Easy access -> Accounting -> Controlling -> Cost
Center Accounting -> Actual Postings -> Sender Activities -> Enter
* Display Cost Centers: Activity Types: Period Breakdown — T-code:
S_ALR_87013646
* Display Cost Centers: Activity Types: Scheduled/Plan — T-code:
S_ALR_87013647
* Display Cost Centers: Period Breakdown Actual/Plan — T-code:
S_ALR_87013640Indirect Activity Allocation
- Create Actual Indirect Activity Allocation Cycle
* Create Actual Indirect Activity Allocation Cycle — T-code: KSC1
* Menu path: Display IMG -> Controlling -> Cost Center Accounting ->
Actual Postings -> Period-End Closing -> Activity Allocation -> Indirect
Activity Allocation -> Define Indirect Activity AllocationIndirect Activity Allocation
- Execute Actual Indirect Activity Allocation Cycle (Period-End
Closing)
* Execute Actual Indirect Activity Allocation Cycle — T-code: KSC5
* Menu path: SAP Easy Access -> Accounting -> Controlling -> Cost
Center Accounting -> Period-End Closing -> Single Functions ->
Allocations -> Indirect Activity Allocation
* Display Cost Centers: Period Breakdown Actual/Plan — T-code:
S_ALR_87013640Indirect Activity Allocation
- Reverse Plan and Actual Indirect Activity Allocation Cycle
* Execute Plan Indirect Activity Allocation Cycle — T-code: KSCB
* Menu path: SAP Easy Access -> Accounting -> Controlling -> Cost
Center Accounting -> Planning -> Allocations -> Activity Allocation ->
Indirect Activity Allocation
* Execute Actual Indirect Activity Allocation Cycle — T-code: KSC5
* Menu path: SAP Easy Access -> Accounting -> Controlling -> Cost
Center Accounting -> Period-End Closing -> Single Functions ->
Allocations -> Indirect Activity Allocation