You are on page 1of 1

CANOPY INSTALLATION

- Install the aft canopy track in place, be sure the inside of the turtle deck has a stiffener
to reduce stress on skin from canopy track. (Do not install canopy stop at this time.)

- Assemble canopy.

- Position canopy rails (pre-drill & countersink rivet holes) match drill holes to the center
of the canopy hoop. Cleco as you go. (This is the only fuselage tube that gets drilled
during aircraft construction.)

- Mark canopy crank positioning on inner cockpit skin, remove rail and drill hole.

- Canopy chain should be installed prior to final assembly.

________________________________ _________________
By Date

________________________________ _________________
Checked Date

________________________________ _________________
Approved Date

Document No. T51-08-DOC-0011-A


Date: 12/9/2009
Page 1 of 1

You might also like