(8) “Rules” means the Indian Electricity Rules 1956 or their successor regulations framed
under section 53 of the Electricity Act, 2003.
(9) “UPCL” means Uttarakhand Power Corporation Limited and its successor
entity/entities, presently the sole distribution licensee in the State, which has been
assigned distribution and retail supply license by the Commission.
(10) All words and expressions used and not defined in these regulations but defined in the
Electricity Act, 2003 shall have the meanings assigned to them in the said Act.
(2) All loads more than 1 MVA shall be sanctioned with independent feeders emanating
from nearest 33 kV/66 kV/132 kV/220 kV substation with metering arrangements at
both ends.
Provided that if the right of way for the proposed independent feeder is not available,
such loads above 1 MVA may be sanctioned either through underground cables or from
the existing feeder provided more than 50% spare capacity is available on such feeder.
1[Provided further that existing Steel Units described in 2nd proviso and who have
connection at 11 kV shall be permitted to enhance their load so that their contracted load
after such enhancement does not exceed 1000 KVA]
Provided that applicants shall be allowed to take connection at voltage higher than
1
Ins. by UERC (Release of new HT & EHT Connections, Enhancement and Reduction of Loads)(First
Amendment)Regulations,2014 notified vide No. F-9(22)(I)/RG/UERC/2014/1694 (w.e.f. 08.12.2014).