250 pi! I
80 pl!
span 20'
The maximum moment for this loading is 20267 lb. ft. The equivalent uniform load to
produce this moment would be 405 Ibs. per ft.
The maximum end reaction is 3588 Ibs. The equivalent uniform load to produce this
reaction would be 359 Ibs. per ft:
The K series joist tables show a 16K3 (with a 20' span) has a total load capacity of 410 Ibs.
per ft. The designer should show a 16K3SP on the drawings.
The SP indicates special requirements for the jOist. The joist manufacturer will review
the designated joist for its ability to carry the special loads shown.
Joist Girders with unequal panel point loads must also be defined by showing the load
diagram on the structural drawings.
'For all standard K series Joists the maximum end reaction is 8700 Ibs. 1f more reaction capacity is needed.
consider using two lor more) jOists to share the load. For LH and DLH joists a conservative end reaction
can be found by dividing the tabulated SAFE LOAD by two.
/NCJ/
NICHOLAS J. BOURAS, INC.
PO BOX 662. 475 SPRINGFIELD AVI:,
SUMMIT, NEW IERSEY 07902-066219081277-1617
MODERN STEEL
Volume 33, Number 4
CONSTRUCTION
------
April 1993 •
FEATURES
18 INNOVATIVE DESIGN CUTS COSTS
The use of composite construction with partially restrained
connections reduced framing costs on a 34,OOO-sq.-ft. retail
building by 27.4%
26 URBAN TRANSFORMATION
An addition to a nearly half-century old department store
allowed the creation of a modern urban mall
32 ATTRACfING ATTENTION
To survive in LAs Vegas, an old retail center had to expand
and create a new, bolder image for itself
•
Chicago, IL 60601 -2001.
Use newly introduced facilities like NON-LINEAR Release 17 marks the debut of AutoSTAAD/MAX - the
analysis, TIME HISTORY analysis, user-controlled world's first integrated structural software system that
mu ltiple iteration P-Delta analysis, steel design for works entirely within AutoCAD.
transmission towers (ASCE Pub. 52) etc. in addition to
14 different steel , concrete , and timber codes, to explore All these powerful capabilities coupled with the
the widest possible range of design solutions. industry's most knowledgeable and experienced support
staff, makes STAAD-IIIIISDS the ultimate productivity
Release 17's powerful printer plotting capabilities allow tool you've been waiting for.
you to generate the industry's sharpest and most
comprehensive run output. For the first time, you can STAAD-IIIIISDS Release 17 - there are those
combine numerical output with graphical output - all in who have seen the fu ture ... have you?
the same run document. Yes, we support the widest
..... Rese.rch
possible range of printers - from sophisticated lasers to
down-to-earth dot- matrix printers. CC
I11III Engineers, Inc_
On the graphics front, Release 17 features an 1570 N. Batavia, Orange, CA. 92667.
enormously enhanced graphics input generator with CALL TOLL FREE (800) 367-7373
speed and power. In addition , Tel : (714) 974-2500 FAX:(714) 974-4771
•
Editorial Staff
Scott Melnick,
Editor and Publisher
Endless Cycle
E
Patrick M. Newman, P.E., ven though one National Steel Construction Conference has just
Senior Technical Advisor
Charlie Carter, concluded, it's not too early to start thinking about next year's
Technical Advisor event. Specifically, AlSC is now soliciting papers to be presented
at the 1994 NSCC in Pittsburgh on May 18-20.
Editorial Offices Unlike this magazine, which concentrates on succes fu] projects, the
Modem Steel Construction Steel Conference looks for innovative design, fabrication and erection
One East Wacker Dr. techniques. As Patrick Newman, AlSC Senior Staff Engineer, states:
Suite 3100
Chicago, IL 60601-2001 "After attending a session, you should be able to take home either a
(312) 670-5407 time or cost 5<wing technique. The idea behind the conference is to
provide practical information that a designer or fabricator can readily
use in his or her office." Of course, papers can use projects to illustrate
Advertising Sales the technique.
Pattis-3M
7161 orth Cicero For example, at this year's conference, several engineers from
Lincolnwood, IL 60646
(708) 679-11 00 Skidmore, Owings & Merrill presented a paper on a Barcelona hotel that •
FAX (708) 679-5926 demonstrated several advances in fire protection for exposed steel
structures as well as an interesting application of exoskeleton design.
Another interesting paper, by Lawrence A. Kloiber of LeJuene Steel Co.
AISC Officers presented practical information on the design of tube connections. And
Stephen E. Egger, Mulach Steel presented a paper on reducing parking structure costs.
hairman
Frank B. Wylie, III,
First Vice Chairman Topics of general interest include-but are not limited to-seismic
Robert E. Owen, design, composite construction, LRFD, heavy framing, fire protection,
Second Vice Chairman
Robert D. Freeland, computer aided design and detailing, residential construction systems,
Treasurer minimizing floor-to-floor height with steel construction,
eil W. Zundel, eccentric-braced framing, and semi-rigid connections.
President
David Ratterman,
Secretary & General Counsel If you've developed any innovative design concepts and are
Lewis Bru nner, interested in presenting a paper in 1994, send a one-page abstract to:
Vice President, Patrick Newman, Senior Structural Engineer, American Institute of Steel
Membership Services
Geerhard Haaijer, Construction, One East Wacker Dr., Suite 3100, Chicago, IL 60601-2001.
Vice President, Or if you have any questions, call him at (312) 670-5417 (he's also
Technology & Research looking for suggestions on improvements in the conference that you'd
MorrisCaminer.
Vice President,
like to see made). Deadline for submission is July 15, 1993. SM
Finance/ Administration
P.S. For more il/[ormaiio/I ollilris year's show, clreck 0111 ti,e Marclr 1993
•
isslle as well as I/exlmol/tlr's magazille.
DESIGNDI
DATA III
• "First in ...software. solutions, service"
402-476-8378 or 1-000-443-0782
Our Tru-Temll1n f,olt W3.\ de"gned What If you h,we to venl) the r"'pcr mstallation of
with one \'cry important ~'Kkanrage a hurroll hcad holt! Ag,lln, It\ almo"o( lmpos"iible ... mcr you
"''Or other t\mt-off holts: a hex can't even get a wrench on the hcaJ to tc...,t or remove It.
head. So remo\lng this holt or checkmg the m,tallatlon With But you can verify m,wllatlon of our hex head holt with the
a mrque wrench ,. . jW,[ <.1'" C<l'ly a~ m.. talling It. (Urn of a wnst and a callhrated torque wrench. C'),
Usmg a qUiet, hand-held rower tool, our Tnl:rcn"on Clcmly, rh,., ,. . nne bolt that won'tlct you I I
s)'!'Itcm alw~lY"" provide.. the correer tcn .. ion. It al"iO ehmmates screw up. Our Tru#Tenslon sY'"'tcm I' also fully trilcc~lble ro
operator error JUring a..~mhIYI the bolts come rrc#a~mhlcJ our dome'tlc ,ource,. like all Nucor fa,teners. They're fully
and you can even .. ave money thanks [0 the quick, ca~y te,teJ anJ certified, mcluding comrllance with FHWA,
InMallatlon illllilowcr (0.. [ .... for vi .. uallll~rcctlon. DOT and AA HTO 'reClficatl"'" for hndge co"'truCtlon.
But, 1O.,wll all)' hutwn head fastener compared to Su, forget about cutting bolt~ off with i1 fOrch if
our hex head f,,,tener, and there\ no turnmg hack. Because ",methmg goe, \\Tong. C,lIu, at 00/955-6826, FAX 219/
It\ almo~[ Impo...... lhlc to remove a blltton head (a . . tcncr. you 337-5394 or wme PO Box 6100, St. Joe, IN 46785 til find
may even neeJ a welder to hum It off. That com you time our more ahout our Tru#Tcn . . u:m "'y"'(em. And get a fa . . tcner .
and money. If you'd ""railed our hex head holt m the fir" that has" good head ~ c::G:fjlJ1::j 11 ::j .{
placc you could remove I( wuh a "'Imple, four dollar wrcnch. flU hU"'lllc'"'''',
Steel Interchange
• -------
SIN'f ftltrrduwgt is an open forum for Modem SIN'f COtlstrllctlOtl
readers to exc.hange useful and prac.tical professional ideas and in-
formation on aU phases of slrel building and bridge construction .
Opinions and suggestions are welcome on any subject covered in
this mag,nine. If you have a question or problem that your fellow
readers might help to solve, please forward it to Modf~m Steel Con-
structlotl . At the s..lme time feel free to respond to any of the ques-
Answers and / or questions should be typcwntten and double
spaced . Submittals thai have been prepared by word .process mg
are appreciated on computer dlsh'He (either as a wordperfect file or
In ASCII format) ,
The opinions expressed in Slt'ff f"terduwge do nol necess.lrily
represent an official position of the American Institute of Steel Con-
struction, Inc. It is recogmzed that the design of structures IS within
tions that you have read here. Please send them to: the scope and expertise of a competent licensed s tructural engineer,
S teellnte rchange architect o r other licensed professional for the application of princi-
Modem Steel Constructi on ples to a particular s tructure.
1 East Wacker Dr. InformaHon on ordering A ISC publications mentioned In this ar-
Suite 3100 ticlecan be dbtained by calling AISC at 312/670-2400 ext. 413.
Ch icago, Il 60601
• L =frame span
P = lateral load
E = modulus of elasticity
I!. = displacement
!!.. - PlY +2
- 12ElcOL 6K + 1
(3K J
I
I
K -- ( ICOL
'8M J(hI J /
I
These simple formulas could be very useful even
in the age of computers. The book, Rigid Frame Formu -
las by A. Kleinlogel is a very good reference.
Fig . 2 Full,y !1.xed frame
Rudolf J. Budesky
•
City of San Francisco
San Francisco, CA
L
New Questions
---
Mike Pentecost
Roscoe Steel and Culvert Co.
Billings, MT
I
Weld Considerations
n developing the strength of a connection or the re-
quired length of weld to develop the member
strength, the welds "a" and "b" were first considered
•
(see diagram at right). These welds were parallel to
the load. Then as the codes and research continued
weld "c" was included, thus increaSing the capacity
of the member. Later weld "d" was introduced .
However, in the current AISC design criteria (Al-
lowable Stress Design and Load and Resistance Fac- '"
tor Design) this weld has not been addressed. Upon
questioning AISC, I was referred to the American
Welding Society Code. Upon examination weld "d"
,.QlfS
was omitted here as well. Additionally, my review of , S11IIJ[f\.II ..... Wfi.D s.n: Al.1J'''; -.c:
'CUll 5US C. flo«! . .ItS.
current materials on this particular subject has
1 ..no IIZl lIS POIftIII DIAl. ~
yielded no further information. I'f.I'tIDIIM · "<fSSA ~PI'K
WELD DET AIL .usc, «:ovo! .. ~..., .....
llI[DJ,Cjill[~'
IJ.O .IIS
•
Frames in Eurocode 4 explains the This topic contains six papers. Pro-
approach for semi-rigid composite posed design recommendations are
frames taken in Eurocode 4 and summarized in Behavior of Semi-
identifies the difficulties encoun- Rigid Connections and Implementa-
tered and needed research. In Para- tioll ill Frame Desigll. The use of
metric Study of Composite Frames, LRFD in semi-rigid frames is dem-
the behavior of semi-rigid compos- onstrated in Design Allalysis of
ite frames is compared favorably Semi-Rigid Frames with LRFD. A
with that of similar rigid frames to simplified approach allowing the
show that the use of semi-rigid
L· -
inclusion of flexibility effects on
composite construction is valid. frame design is presented in Practi-
The force transfer mechanisms in- cal Desigll Allowillg for Semi- Rigid
volved in semi-rigid composite _...,.,,- -:=:- COIlllections. The Effect of COIlllectioll
0,;::-
connections is investigated in Slab Flexibility on Portal Frame Behavior
and Beam Load Introduction in Com- examines both full scale testing
posite Columns, while a model for and analytical modeling in flexibly
analysis is proposed in Energy- connected portal frames. The effect
Based Prediction for Composite Joints of static and dynamic loadings on
Modelillg. The ability of composite frame stability is examined in Allal-
connections to meet the necessary ysis of Frames for Stability. All Alla-
performance criteria is assessed in Iytical Allalysis alld Design System
Tests on Composite Connections. Ro- CONXPRT. A CAD System for Semi- for Steel Frames with Partially Re-
tational behavior and the outcome Rigid Joints in Non-Sway Steel strailled COIlllectiolls describes a
of cyclical testing is presented in Frames elaborates on the analysis method for modelling semi-rigid
Semi-Rigid Composite Joints: Experi- method, design approach, and fea- beam-to-column connections in
mental Studies. The non-linear be- tures of this limit-states based pro- steel frames.
havior of this connection is further gram.
described in The NonLinear Behavior Economy of Design-Four pa-
• of Composite Joints. Finally, the ef- Global Behavior of Semi-Rigid pers were presented. In Economy of
fect of cyclical loading is further Connections-Eight papers were Semi-Rigid Frame Desigll, the cost
explored in Cyclic Load Analysis of presented. Connection Momen t-Ro- benefit of using semi-rigid connec-
Composite Connection Sub- tatioll Curves for Semi-Rigid Frame tions is evidenced. The cost benefit
assemblages. Design examines the use of actual of the "temporary" semi-rigid
versus simplified representations frames used in a 3D-story building
Semi-Rigid Connections-Four of the connection characteristics. in Mexico City is described in Tem-
papers were presented in this The relationship between joint flex- porary Flexible COllllectiolls ill the
topic. Reliability of Rotational Behav- ibility and frame stability is investi- COllstruction Process. For bracing
ior of Framing Comlections addresses gated in COllllectioll Respollse alld connections, a cost comparison of
the statistical variations caused by Stability of Steel Frames. In addition different design methods is pre-
fabrication and erection tolerances. to this the effect of force distribu- sented in A Cost Comparison of Some
Refinements to existing methods tion and deformations are exam- Methods for Desigll of Bracillg COII-
are presented in Plastic Capacity of ined in Prediction of the Influence of nectiolls. Finally, the use of cold-
End-Plate and Flange Cleated Connec- COllllection Behavior on the Strength, formed members and semi-rigid
tions: Predictions and Design Rules. Deformation, and Stability of Frames, columns is investigated in Semi-
The effect of cyclical loading is ex- by Classification of Connections. The Rigid Lightweight Steel Frame SKEL-
amined in Analysis of Flexibly Con- semi-rigid nature of joints in hol- ETON.
nected Frames Under Non-Propor- low sections is investigated in
tional Loading. In Moment-Rotation Semi-Rigid Connections in Lattice Current Research Needs for
Characteristics of Bolted Con nections, Girders Formed with Hollow Struc- Connections in Steel Structures-
the effect of column flexibility is tural Sections. The results of a study The final segment of this publica-
considered for bolted semi-rigid of seismic behavior of rigid and tion presents the current research
connections. semi-rigid frames is presented in needs for connections in steel
Cyclic Behavior of Frames with Semi- structures. These needs were de-
Connections Software-Three Rigid COIlllections. A similar stud y veloped from the technical papers
papers, describing connection de- is presented in Dynamic Tests of presented and the ensuing discus-
•
sign software, were presented . The Semi-Rigid COImections. Finally, an sions.
Eureka "ClMSTEEL" project, a Eu- analytical modelling approach is
ropean approach, was described in described and interpreted in Ana- Charlie Carter is Staff Ellgineer-
one paper, while a second de- lytical Modeling of Cyclic Behavior of Structures with AISC.
scribed AISC's expert system, Bolted Semi-Rigid Connections.
B
AISC Lecture Series: New Ideas In Structural Steel
eginning in March, AISC Mar-
keting, Inc. will offer a new
lecture series focusing on innova-
tions in structural steel design. Nw
•
•
The four-part seminar covers:
Low-rise buildings.
Design of connections.
•
Eccentric braced frames.
registration fee are a dozen hand-
outs and publications plus a meal.
For information, contact: Colleen
Hays, AISC, Inc., One East Wacker
•
Ideas In Structural Steel will present •
Partially restrained connections. Dr., Suite 3100, Chicago, IL 60601-
practical design concepts for engi- Registration fee is $60 ($45 for 2001 (312) 670-2400.
neers and fabricators. AISC members). Included in the
•
Atlanta 9128 Cincinnati 10121
Richmond 9/30
-
Stee l Bridge Forum (April 1 in Baltimore) Steel Bridge Forum (April 22 in Raleigh, Topics include: equipment selection and
sponsored by American Iron &: Steel Insti- C) sponsored by American Iron & Steel In- cost justification; precision laser cutting
tute. Topics indude: Guide to Selection of stitute. Topics include: Overvie w of Steel techniques; YAG. fiber-delivercd process-
Bearings and Short Sp..1" Steel Bridges. Con- Service Centers; Skewed & Curved Bridges; ing; laser/ punch combination machines;
tact: AIS!. 1I0117th 51., .W., Suite 1300, Short Span Steel Bridges; and Guide to Se- high-energy thennal processing; program-
Washington, DC ~700 (202) 452-7100; lection of Bearings. Contact AlSt, 1101 17th ming laser cutting systems; C()2 multiaxis
Fax (202) 463-6573. St., N .W., Suite 1300. Washington, OC processing; material handling equipment;
200J6.4700 (202) 452-7100; Fax (202)46J. equipment Specifications; maintenance; and
Tr~nsportation Planning for Livable Com- 6573. safety. For more information , call (815) 221-
munities (April 2-3 in San Francisco, April 8202.
23-24 in Atlanta, and April30-May 1 in Win- Symposium on Project Management (May
ter Park, FL) sponsored by FHWA, Na tional 13-14 in Chicago) sponsored by Association 1993 Symposium on Computer Integrated
Trust for Historic Preservation, a nd others. for Project Managers in the Ocsign Profes- Building Sciences OunelO-l1 in Anaheim.
Workshops explain the lntennodal Su rface sions. Topics include: sta te of the art project CA) sponsored by the Internationa l Cound l
Transportation Efficiency Act of 1991 management techniques; the e merging con- for Building Research a nd Documentation.
(lSTEA). For information, ca ll (800) 937- cept of partnering; creating a Total Quality Topics will include: automated const ruc-
6847 Management component to each design tion (using no people); automated fabrica -
project; making effective project decisions; tion; robotic tools for construction; and 3D
Workshops for Rural and Small Urban Of- new project ma nagement directions fo r the modeling. An additional session will fea-
ficials (April ~7 in Burlington, vr, and economy of the '90s; a nd case s tud ies in- ture the new Disney Concert HalJ Project,
May 18-19 in Hershey, PAl sponsored by cluding managing quality on the new Inter- which has been designed on 3D CAD and
Na tional Association of Counties, U.S. na tional Complex at O'Ha re Airport. Con- has used NC for the cutti ng of stone and
J:)('pl. of Agriculture, NACE. and USOOT. tact: APM al (312) 4n - lm; Fax (312) st ructural steel. For more information, con-
•
Sessions will focus on new opportunities 525-0444. tact : Ha rold Jones. SCIBS'93, 1700 Asp Ave-
for roads and bridges, rural trans it, eco- nue, Norman, OK 73037-000 1 (405) 325-
nomic development and research and tech- Lasers in Fabricating Conference (May 18- 1947; Fax: (405) 325-7968.
nical assistance. For infonnation, ca ll: (202) 20 in Schaumburg, III sponsored by the
nO-8042. Fabricators &- Manufacturers Association .
TRUE
FALSE
FALSE
I n the January, 1993 issue of Mod-
em Steel COllstruction you pub-
lished a list of various structural
prablems must be complex and difficult
to use.
Structural engineering software can never TRUE FALSE
steel shapes and the principal pro- be fun to use.
ducers of these shapes. What is not
clear, however, is whether all If you answered TRUE to any of the above, or you would like to know more
shapes listed are available in A36 about a truly innovative software program, colt us!
and A572 Grade 50 materials. It has
been my understanding that A572 L~,.,
Grade 50 material is available for - ~ ~
~.!
r-;;:
W shapes only. -
RISA-2D
~
f- ~'
E,
M . Garkawe
Director, COli tract Desigll Dept.
-
Foster WIleeler Energy Corp.
Clinton, NJ
·V~ f-
I--
Your complete solution for
frames, trusses, beams,
L
shear walls and much more!
Editor's Response: Most struc-
tural shapes, including angles and
channels are available in A36, A572
and A588. In addition, some mills
n
K.
ISA 26212 Dimension Drive, Suite 2DO
Lake Forest, CA 92630
•
In the above table, LP is the
maximum span with prestressing, For more information. or to request a free trial . contact:
LO is the maximum without pre-
stressing, P is the prestressing
force, and e is the eccentricity. MDX software
Phone (314) 446-3221
Fax (314)446-3278
•
S TEE L NEW S
-----------------
:::~
• .,_
,- ~I~~
..
.. .. . ft ",..
.. .. . " I' ..
weathering steel; horizontally
curved bridges; bridge reports on
Prize Bridge Symposium, contact
the AISC Membership Services I~ ..:: ...: ::"
,,,
~
.. .. . 11
•
major structures; innovations in Dept. at (312) 670-5420; Fax (312) M il . . .
tf ......1L ,--".
steel design; and workshop reports. 670-5403. II . . ..
. .. . M
•
•
highway or viaduct; movable span; Wacker Dr., Suite 3100, Chicago, fL For ordering information, con-
railroad; special purpose; and re- 60601 -2001 (312) 670-5432; Fax tact: AISC, One East Wacker Dr.,
constructed . Deadline for entry is (312) 670-5403. Suite 3100, Chicago, lL 60601-2001
june 18, 1993, and there is no entry (312) 670-2400; Fax (312) 670-5403.
OESCON
DESIGNS AND DETAILS
STEEL CONNECTIONS
Il-.+li.:!1l·· -- ••.•.•••
c
•
OMNITECH ASSOCIATES
P.O. BOX 7581
BERKELEY, CA 94707
658-8328
Innovative Design.
Cuts Costs
The use of composite construction
with partially restrained connections
reduced framing costs on a
34,OOO-sq.-ft. retail building by 27.4%
P until October 1990, the
•
tion during the final phase," he ex- "This additional strength is at least point of maximum negative mo-
plained . "An end plate is a particu- equal to the ultimate moment ca- ment and point of zero moment.
larly good choice because not only pacity of the composite beam and "The number of such studs shall be
does it deliver forces to the column is not influenced by the type of selected to develop the negative
but it also reinforces the column by connection between the steel ele- moment," Wexler said .
spreading compression forces over ments. The rotational capacity of
larger areas, just like a bearing the composite beam-column con- Cost Savings
plate, thus redudng the need for nection also is at least equal to that The cost savings on the Mt.
compression column stiffeners. It is of a conventional, non-composite Kisco project were dramatic. With
especially economical when full rigid steel connection. simple supported girders, the proj-
penetration welds are not re- Wexler adds that the AlSC Man- ect would have used A36 W14x34
quired ." lIal of S/eel Construction (LRFD) al- girders with no camber and no re-
Another acceptable connection, lows calculations of the negative bars and 40 studs. Wexler reports
according to Wexler, are top and design moment strength based on that in the New York City area, the
bottom angles. "Angles are a good plastic stress distribution of the 20' girder plus the 40 studs would
choice because the bottom flange is composite section provided that cost approximately $610 (on pro-
reinforced against local buckling the following are met: jects outside of New York City,
by the horizontal leg of the angle." • Shear connectors are located in Wexler has paid as little as $450).
For this project, an L8x4x1l2 was the negative moment region. The composite system with par-
used to enure that the girder bot- • The slab reinforcement is ade- tially restrained connections, how-
tom flange bears against the col- quately developed. ever, required A36 W14x22 mem-
umn. The project utilized 2112" (64 • The steel beam is compact and bers with :V4" 09 mm) camber, four
mm) of light weight concrete braced . #5x8' long rebars and 34 studs. The
poured over 1112" (38 mm) metal "The designer can use this addi- cost in ew York City for the 20'
deck. At one location, where the tional strength to reduce the girder (6.09 m) girder, camber, rebars and
span is 34' 00.4 m), the concrete size further," Wexler said. "Only studs is approximately $443 (out-
thickness was increased to 5" 027 additional studs and negative con- side of New York City, about
mm) in order to decrease floor vi- crete reinforcement are needed." $328), for a savings of $167 per
• brations. Bay sizes are typically 23' He does caution, however, that member, or more than 27% com-
x 23' (7.01 m x 7.01 m). Van Dalen's research shows that in pared with other design methods.
Increasing the connection size order to ensure a uniform cracking
beyond that required for full fixity pattern in the slab in the vicinity of
_.-.!'"
I
Alamodome, remember Vulcraft. A Dw;,,,," of Nt/cor Corporal/on
1'0 IJ,» 637. Bngham e ll). UT 84302.80 1/73 4-9433; PO 00., 100520. F.w,nc,. SC ]9501. &3/662")3RI.
1'000x 169. F." Po,"..,. AL 35967. 205/845·246('!; 1'0 00x 186. C;,.,,,,,,,,,J. TX 75844. 4CI9/6il7·4665.
1'0 IJ"., 59. No1v1k. NE 68702. 402/644 -8500; 1'0 Il<,. 1000.SI}",. IN 46785. ZI9/.Uii411
Archuecu:: Marmon Barclay SOU!t'T FOSfeT' Ha)'s and I 10 K Sports Flier/JIleS Groll!'; SmccftlTal Engll'1<:t'1' \~. E
Snllpsol'I (",(). lru.'_; PI'(IJCt:f Mttrltwt.'T: Day & ZlIIlIlIemlt;nl , Inc; SmKumJ ContT(I((Il'r: L:;Jl irk:f)!porareJ, 'Icd
F,dmcat(lf1, CrottTl Slee/ lnc, and InJlLSITUlI :-"Il't:hlmll·a/ (:11.; Suel crn:IQr' John F lkusk) (:mum"llf," (:n.
AISC 1993 Prize Bridge Competition
Rules •
I Eli9ibility Entry Requirements
To be eligible, a bridge must be built of fabricated All entries must contain an entry form. photographs and a
I structural steel, must be located within the United States
(defined as the 50 ;tates. the District of Columbia, and all
written description of the project. A separate binder must be
submitted for each entry. 0 entry free is required;
U.S. tenritories), and must have been completed and opened submission materials will nOl be returned. The use of any
to traffic between May I. 1988 and April 30. 1993. entry's submitted data. detail and/or photographs by AISC
shall be unrestricted. Note: Projects not receiving an award
still may be used in Modern Steel COlis/ruction magazine or
other AISC marketing materials.
Judging Criteria
Judging will be based upon aesthetics, economics, design I. Entryform: The complete and accurate entry form and
and engineering solutions. Quality of presentations. though one copy must be enclosed.
not a crilerion. is Important.
2. Photographs: A minimum of four professional quality
8x 10 color prints of various views showing the entire
Award Categories bridge. including abutments as well as selected details. are
Entries may be judged in one or more categories, but can required. 35 mm slides are strongly recommended.
receive only one award. Photographs will not be returned.
Long Span One or more spans more than 400 ft. in length. 3. Description: Explanation of design concept, problems
and solu tions. aesthetic studies. project economics and
Medium Span, High Clearance Venical clearance of 35 unique or innovative aspect of the project. Include no
ft. or more with longest span between 125 and 400 ft. than II x 17 drawings showing elevation, framing system
and typical details.
Medium Span, Low Clearance Venical clearance less
than 35 ft. with longest span between 125 and 400 ft.
Method of Presentation
Short Span No single span greater than 125 ft. in length. Each entry should be submitted in an 811.!'· x II" binder.
containing transparent window sleeves for displaying
Grade Separation Basic purpose is grade separation. insens back to back. The entry form included in the
brochure must be easily removable, so that the
Elevated Highway or Viaduct Five or more spans. identification of the entry can be concealed during judging.
crossing one or more traffic lanes.
L
Suite 3100, Chicago, IL 60601·2001. For further
information, call 3 12/670-5432.
l .
• Entry Form
Enlry Oale_ _ _ _ _ _ _ _ _ __
O~ignFirm: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _~~--------------------
Phone
Address:. _ _~~-----------------~~~~--------~~-------
StlH.t C'lyand 51J11r up
Person to COnt3Ct: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _:;;::;::-_ _ _ _ ____
•
Tllk
Consulting Firm (ifa ny): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ --,=,.,....__________________
Phone
Address:._ _~~----------------""~~~-------~~------
Stree1 C,IY and St.t . ~ ZiP
Person locontacl: _ __ _ _____________________________ =,-______
T,tk
General Contracting Firm: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _-=-_____________________
Phone
Addre~:: _ _~-----------------~-~,.,....-------~~------
Strttt ell)' and Sllle ZIp
Person locontact: _ __ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _:;;::;::-_ _ _ _ __
Title
Steel Fabricating Firm: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _--,,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Phone
Addre~:: _ _~~----------------""~~~-------~~------
S~I CIty and Stale up
Person locontacl:_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _:;c::_ _ _ _ _ __
Tllk
Steel Erecting Firm: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. .:=::-__________________
Phone
Address: _ _~~----------------~~~=_-------~=------
S.,., City and SI.II~ 7,.
Person locontact: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _:;;::;::-_ _ _ _ __
Title
Owner: ________________________________________________~~------------------------------------
Addre<S: _ _---;;-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ =_=-,-_______--,;_______
Phone
•
This entry submitted by:
Name: _____________________________________________________________ T."-~----------
Title
Firm::__________________________________________~-----------------------------------
Address: _ _----;::-,----_______________________
Sln'ltt
-;;,===-______________
Ph"'"
Urban •
Transformation
An addition to a nearly half-century old
department store allowed the creation of a
modern urban mall
By Thomas A. Bouffard, P.E.
lthough City Place was
existing structure.
Structural Considerations
"Steel was chosen as the struc-
tural system for the building be-
cause of the flexibility it offered the
•
design team," explained Wayne
Bryan, P.E., a pri ncipal with
Ehlert/Bryan, Inc., the project's
structural engineer. "The steel
structure allowed for long column-
free areas in the common mall, in
some cases spanning up to 70' (21.3
m). Steel also gave us the ability to
use a 30' x 30' (9.14 m x 9.14 m)
typical bay, which worked well for
both the retail and the future
tower."
Unshored composite construc-
tion utilizing ASTM A572 Grade 50
high strength steel combined with
a lateral bracing system of cross
The exterior of the ce"fer retains urban elements but also shares some design features with and eccentric K braces was used .
typical 5uburbtw malls. The design also was jnte"ded to stress the cenlers overall This system provided cost control
horizonta//ayout. while allowing the framing flexibil-
ity the architects would need to de-
sign a successful mall. The project
used a total of 373 tons of A36 steel
Registered Head Markings on all Products from v.. -3. diameter include:
structural and machine bolts:
'" ffi
S)'!-
OJ "325
COUNTERSUNK
A-325 A·325
1YPe 1 'TYpe 3
SQUARE BUTTON
MACHINE HEAO
• Production Control
mediate dead load deflection. This on the two main components of the the existing concrete floor . The end
.... ,In
I~ ~" ~ M~I~ II~ I
computer and get instant. detailed tracking reports on the status
01 Individual pieces or entire jobs in your shop? Thafs exac1ly ,
what Struc1Ural Software's new Production Cootrol Tracking
System can do lor you. Shipping tickets, loading repo<1S and
other status repo<1S show what shop stations a piece passed
through 00 what date. who did the work, how many manhours
the work tool< and what still needs to be done to that piece. Bar
111111 /I
graphs, like the one shown, give the number and percentage of compkJtion on any piece mari<. sequence or job. The new tracking system
gives you the power to see exactty what shop work remains to finish a given piece mark. sequence or}ob. Sorted lists show individual piece
weights . assembly weights , even weight of all steel on a drawing. Production Control intorfaces wtth our Purchase Orders program 10
generate cutting lists that give you the addled capability of traCking material from the time ~' s ordered to the time it's cut. The cutting lists
show shopempioyees exac1lywhich pieces to pull, which pieces to cut lrom them and which pieces to scraporren.m to invento<y. Production
Control also works with our new Combining program to optimize your material cutting for Gvon more savings.
•
vided the mechanism to resist the Various framing schemes were pan joists and girders. The new ar-
eccentric support. This support investigated but the tried-and-true chitectural plan called for expand-
was fixed to the column using a approach of unshored composite ing the loading dock by two bays,
traditional rocker plate pintle con- structural steel was selected. [nfill installing escalators at each level,
nection. The opposite end of the beams were placed across the adding a new freight elevator and
bridge was supported on free- width of the auditorium at the lo- adding a 4,800-sq.-ft. (446 m 2) me-
standing concrete columns with an cations of changes in the noor chanical penthouse on the existing
expansion joint at the adjoining slope. roof.
parking structure. In the smaller theaters, the noor Two bays of concrete framing
The bridge, due to its size and construction consisted of 31,4" (83 on each level were removed to
location, required a substantial mm) lightweight concrete fill over allow for the escalators and new
amount of pre-planning. Erection 2" (51 mm) metal deck. Infill beams noor framing. Structural steel was
of the bridge would require the were spaced at a maximum of 10' used to frame out each area to sup-
closing of a major downtown street (3.05 m) on center. In the large the- port the perimeter of the existing
for three days. The 6O-mile (96.6 aters with the radial seating, the concrete noor. The trickiest part of
km) travel path from the fabricator same framing scheme was used; the construction was drilling the
to the site had to be carefully se- however, the thickness of the con- existing concrete for the expansion
lected since the W36 girders were crete fill varied to maintain the bolts. Due to the age of the struc-
being shipped full length. The curved noor contours. The noor ture, the concrete was extremely
girders had to be properly oriented slopes were framed by placing the hard and difficult to drill. Standard
on the trucks to be ready for the beams at the chord of the arc of the impact rotary hammers were inef-
lifting as the street was not wide slope changes. This system proved fective in drilling the 25 mm holes.
enough to reposition the steel. to be an ideal way to solve this The erector found success by using
framing condition. A sophisticated a water-cooled, diamond-tipped
Serviceability
table of dimensions keyed to a typ- drill.
"Based on our retail experience, ical plan and elevation was devel-
we have learned that some of the oped to provide the necessary in- Thomas A. Bouffard, P.E., is a proj-
longer beam and girder spans, 50' formation to the detailer and ect engineer with Ehlert/Bryall , IIIC., a
•
(15.2 m) and over, can be suscepti- contractor. structural ellgineerillg firm with of-
ble to vibration problems," ex- fices in McLean, V A and Southfield,
plained Bryan. "Specifically, long Lateral Stability MI.
span beams that frame into girders The lateral stability of the build-
• Volume /I Connections
is a companion and
extension to the AISC
Manual of Steel
Construction (both LRFD.
1st Edition. and ASD. 9th • Covers bolted
Edition). and welded
shear. moment.
and bracing
• Contains examples
and information on steel connections in
connections not published applications not
anywhere else. treated in either
the ASD or LRFD
Manual of steel
• Has practical and
economical examples of Construction.
complex connection
designs in both LRFD • FREE BONUSI
and ASD. An updated copy
of the AISC Code
of Standard
• Based on the latest
AISC LRFD and ASD Practice will be
specifications. sent with each
book.
Attracting
Attention
•
To survive in Las Vegas, an old retail
center had to expand and create anew,
bolder image for itself
s Las Vegas has become
make it stand out as much as possi- tends twice that height- and it
ble and to attract attention," said needed to be supported on cantile-
Donn Logan, FAIA, a principal vered W12x40 steel columns. Gen-
with ELS. "Las Vegas is a place eral contractor on the project was
where you can transcend the genre Taylor International Corp., Las
to where garishness becomes art." Vegas.
•
Towards that end, the panels jut "The wood diaphragm holds the
out here and there and rise up to structure together, but lateral loads
different elevations. "There's an are picked up by K braces spaced
angularity to the site itself since approximately 100' (30.5 m) apart
one of the adjacent streets is an- along the 300' (91.4 m) length of
gled," Logan said. "This design is the structure," Khoury explained.
reflective of its site and location." In addition, there is a row of steel
And topping it off is a series of beams at both the roof level and at
both free-standing and attached the top of the columns.
trellises and canopies. "Besides at- The beam line at the roof level
tracting attention, they also pro- are W14x22 wide flange sections,
vided shade, which was very im- while 6x4xV4 tube shapes were
portant in Las Vegas' climate," used at the top of the structure.
Anziani explained. As Las Vegas "We used tubes for the top beam
becomes more of a family vacation line because they are exposed in Duri"g ti,e day. the trellises a"d canop'es
destination, pedestrian traffic has SOme places," Khoury said. Clip provide shade, while at 1/;Sl1t they act as
increased, so this structure is much angles are welded to the tube and brig/It beacons to attract atteution to tlte
more pedestrian oriented than then bolted to the wide flange col- site. Both the trellises and canop'es are
older Las Vegas buildings. umns on the top and bottom. supported 011 steel members that were left
Of course, supporting all of the Several large trellises, some of exposed to create VISIIa I interest.
cladding and ancillary structures which are as much as SO' (15.2 m) Photos by Timothy Hll rslry.
effected the structural design. high, are free standing and are sup-
The new structure is steel ported on tube columns. To further
framed with a wood joist roof, ac- enhance the structure's angularity,
cording to Raymond Khoury, S.E., cut and bent wide flange sections
a structural engineer with Martin were used to support the trellises'
& Peltyn Structural Engineers, Las metal roofs. The tube columns
Vegas. "Because of the high facade, range from 5x5x:}l4 to 12x12x\lz. The
•
wind governed the design," he shading material at the top of the
said. While the building's roof line trellis is supported on T-shapes cut
is approximately 15' (4.57 m) high, from W2lx44.
in some places the parapet wall ex-
Australia
Rediscovers Steel
•
An aesthetically intricate building provided a toe-hold for
steel to penetrate a concrete stronghold
By Leonard M. Joseph and
Thomas Z. Scarangello
W
hy would engineers in
very English, very mod-
ern Australia look to the
United States for technical exper-
tise? There's a one-word answer:
Steel.
During the past few decades,
straight-sided, flat-topped concrete
towers have become nearly univer-
sal for Australian commercial con-
struction. Steel construction was
generally limited to heavy indus-
trial appHcations such as ore load-
ers or mills.
But rather than building another •
box-like building, the developer of
The Chifley Square Building in
Sydney favored a highly articu-
lated building design by architects
Kohn Pederson Fox of New York
and Travis Partners, Ltd . of Syd-
ney. And in another departure
from the "Australian-norm", the
developer had no preconceived no-
tions about structural framing sys-
tems.
Thornton-Tomasetti/ Engineers
was brought into the design pro-
cess for this new high-rise office
tower by Flack + Kurtz AustraHa
Pty. Ltd., a structural / MEP engi-
neering design firm, to study alter-
native highrise structural systems
and develop the wind resisting sys-
tem. This included the opportunity
to give steel framing another look.
Steel offered three potential advan-
tages: speedy erection, easy cabling
access, and cost savings.
Erection Speed. Based on US ex-
perience, steel frame erection at a
rate of two floors a week or better
The Chifley Sqllare BlIildillg facade is higllly articlllated to help create a trallsitioll from was anticipated, excluding start-up •
the local street front titles to the overall city grid, while also e,,}lQlIcillg views of Sydney and non-typical floors . High-rise
Harbour. concrete construction in Sydney
The basement core column shawl! above is built up from sewn plates, while the split
coilimlls shown at right straddl. a sidewalk arcade below.
•
sizes and weights, which may composite 45' floor beam in the rication, erection and force trans-
work for industrial use but ig- U.s. might be a W21 x44, but the fer through sections built from
nores the different needs of nearest equivalent in Australia six to eight plates.
beams and columns. was a 530 UB 82 (W24x55). This • Making base plates from 300 mm
• Plate stock is supplied as slabs, extra weight was not wasted, thick by 1800 mm square cast
and in only a few lengths and however. Additional live load ca- steel slabs. This approach had a
widths. pacity was inexpensively made material cost premium and re-
• Plate stock thicknesses vary in available by an extra bolt added quired careful quality control
large steps. to beam end connections. and assurance but was still more
• Plate is not available thicker than • Setting shipping lengths and economical than alternatives of
100 mm (3.9"). splice elevations to work with as- stacked or stiffened 100mm
Due to these limitations, some shipped slab lengths (minus mill- rolled plates.
premjums were paid to ensure ing allowances). While the result-
construction speed . Solutions in- ing splice locations may not have Slab construction
cluded : been as convenient as the usual 2' The standard deck profile is 50
• Pre-ordering stock in advance of to 4' above the deck, the wastage mm (2"), which limits spans to
the design. By ordering a selec- avoided was worth it. about 10', and has "dovetail" or
tion of plate we "mixed and • Designing plate widths to work "keystone" ribs with wide flats of
matched" during design to mini- with as- hipped slab widths maximum slab depth, requiring
mize waste. (minus trim and cutting allow- more concrete fill than a typical US
• Ordering 350 MPa stock even ances). pattern and boosting slab dead
though much of the heavier steel • Designing custom built-up sec- load from the 45-50 psf typical for
would be deflection-controlled tions for the many members be- stone concrete in the U.S. to about
and could be 250 MPa material. yond the range of available hot 65 psf. Lightweight expanded-
This simplified ordering, stock- rolled sections. This included shale aggregate was not a practical
ing and tracking material in the most tower column sections, choice.
"mix and match" process. girder sections and wind bracing
load criteria
•
• Determining the range of likeliest sections.
member sizes and lengths for • Building up ections from multi- u.s. office floors have 50 psf live
rolled sections, and ordering just ple 100mm plates. While built-up load, reduced to as low as 20 psf at
enough over length pieces to get sections are commonly required columns. The Australian code calls
going until the design was better in the U.s. for lower-tier core col- for a 3 kPa live load, equivalent to
W E L 0 N G PRO 0 U C T S
(230 / 460 / 575 - 3PH - 60Hz; 220 1079, Appleton, WI 54912 (BOO) which also sells plasma cutting
• / 380 / 440 - 3PH - SOHz; 380 / 400 950-9353. tools, has entered into a marketing
/ 415 - 3PH - SOHz); thermostati- agreement with Kemppi to sell
cally controlled alarms on rectifier their product line of inverters in
to automatically shut-down power the U.S.
source in case of overheating; units MIG Welding For more information, contact:
can be paralleled together for PowCon Inc., 8123 Miralani Dr.,
higher amperage output; units are
stackable for maximum power in
Gun San Diego, CA 92126 (BOO) 833-
9353.
minimal space; and three year war-
ranty on power transformers, recti-
fiers, and current control resistors.
B ernard Welding Equipment
Co. has announced the avail-
ability of its new "Q" Gun Series,
For more information, contact: an advanced MIG welding gun
AFrEK, Inc., 1023 Pineville Road, with three basic models: 500 Amp
Chatanooga, T 37405 (BOO) 742- MIG gun; 3SO Amp MIG gun; and
5458. 200 Amp M1G gun. In addition to
exceeding the features included in
most other MIG guns, this new
generation of easy-to..handle,
higher performance guns will pro..
vide users with consistent, high-
quality welding performance, in-
cluding less waste, simplified
access, and easier operator han-
dling. Dramatically new "jump
liner" technology makes it possible
to reduce liner costs by as much as
65%. In addition, a new 6" long
jump liner enables the welder to re-
place the body tube liner without
Power Source
having to change the gun liner. The
series also offers seven new heavy MIG Wire
duty, two..piece, spatter resistant
B uilt for rugged use at COn-
struction sites, the Miller XMT
copper nozzles, as well as inter- Feeder
changeability with a broad range
Rack product line has been ex- M.K. Products ha introdu ed a
of EZ Feed lJ nozzles.
panded to include a second eight For a free information package, new integrated power supply and
Pak and a new four Pak model. push-pull wire feeder, with capa-
contact: Bernard Welding Equip-
While the original XMT 8 Pak Rack ment Co., P.O. box 667, Beecher, IL bilities of welding up to SO'. The
was designed for operation on 230 60401 (BOO) 323-8768; Fax (708) 946- CobraMIG 250 welding package
VAC or 460 VAC power, the new 8 includes a self-contained 2SO amp
6726.
Pak Rack operates on 460 VAC or CV, push-pull combination power
575 VAC primary power. The new supply and MIG wire feeder. The
4 Pak Rack is designed for 230 or unit comes fully assembled and,
460 VAC primary power operation.
With eight 300 amp power sup-
Inverters after unpacking, can be up and
running within 15 minutes. It has
plies and 40 amps of auxiliary
power, XMT 8 Pak Racks weight
just 1,700 Ibs. Four 300 amp power
P 0wCon's inverter welding
power sources allows up to
75% reductions in size and weight
excellent short and spray arc char-
acteristics and no spatter. It's foun-
dation is a rugged, all-steel rolling
supplies bring the weight of the of the transformer and up to 45% cart with cylinder rack. Three op-
XMT 4 Pak Rack to just BOO Ibs. All energy savings as compared to tional kits further increase flexibil-
of the models have a compact 63" SMAW or GTAW power upplies. ity: remote voltage kit with 25'
wide x 40" deep footprint and Can When combined with an engi- cable and 25' extension; digital
be easily transported from job site neered plastic hOUSing, the result is meter kit; and a stitch / timer kit.
to job site. Fork lift access is pro.. a power source that weighs only For more information, contact:
vided on all sides, as well as a cen- one-third that of a conventional M.K. Products, Inc., 16882 Arm-
• tral eye for crane movement. transformer and takes up signifi- strong Av., Lrvine, CA 92714 (714)
For free literature, contact: cantly less floor space, yet provides 863-1234; Fax (714) 474-1428.
Miller Electric Mfg. Co., P.O. box the same power output. PowCon,
STEEL MARKETPLACE
STEEL SHAPING SPECIALISTS Ram Analysis Steel Design Software
WE CAN BEND STRUCTURAL STEEL: THE EASY WAY, THE Now. get SBEAM by Ram Analysis ror only $100. Full reaturc.
compofliteinon-composite single beam desi~ 8.nd analysis software (LRF
HARD WAY, IRREGULAR CURVES, OFFSETS, ELLIPTICAL or ASO). E8Sy-t.o-U8e With Windows graphIcal mterface. Full 90 day money
SHAPES, CIRCLES, SETMENTS WITH TANGENTS AND AND WE back guarantee.
CAN BEND IT TO TIGHT RADII WITH MINIMAL DISTORTION. Also available. t.he RAMSTEEL Integrated Structural Software System.
Fully integrated analysis, des ign and draning or steel beams, joi8t.8.
We also offer forging. the hOI shaping of melals and the roiling and forming of columns, and baseplates
rubing. rail and bars. Call or Fax Frank Huttsrsr for more InformatIOn. Ram Analysis
Telephone 414-355-8220 FAX 414-355-4698 5315 Avenlda EnCinas, Suite M, Carlsbad, CA 92008
MAX WEISS CO., INC. 8625 W. Bradley Rd., Milwaukee, WI 53224
Phone: 8001726-7789
Fax orders: 6191726-7789
Kelp Wanted - Structural Engineer You'll be a.m.Qed at what you can draw from our e.perlence:
CADVlSIONS hili beoen proVldlngCAD..,lutlOfll ror ttw A'EIC mdWltry'lnce 1989.
Con.ullln, [ngmeen", Finn IIHU Slnlctura1 Engtneer to eng. In C'OfICf'ete dKlgll. by offennl adya~ .oftwa", and hardware producta. IW:rvKe. IUpport and proreulonal
both mildly J't'lnforred and plfl'treued; retlponllble for llinoua pro,J«U InvolvlnK demgn trammlJ Our product.a proVIde the bHt CAD IIOlutM>na ror an:h,l.«Ui, enlJlnC'ers.
or multl-.tory relfl(o~ concrete and 1t.eeI.lructUl'ft; delLgn poal·U!.n'loned nat plate fabncators and df'lallers
'lructun; loed Leal. repair and .tre:ngthemng of mulu ..tory pMl.teMlOfIed tl8t plate
.tturtun.; poIIl-tenllOnC'd foundatIOn dl!llJgn; "",norm .Iab analy.i. by finite element •• .. •••• .. • ..... •• ...... • .. •••• .. ·Authon~ dealers ror:····· .. •••• .. •••• .. • .... •••••••
Software Platten
method, u.t MICAS and ETABS to J)l!rfonn ,lJIllC and dynamiC Ilructural.naJYSII and AutoCAD tA utode.k. ) NovaJET
dC!llgn and ADAYr to deelgn p~treued contl'Me .lructure._ RequlN' bachelor of AuloDetllgn (SAT ) ProTRACER
ICIt'nce dejp'H In cIvIl or structural engmeenng Re<tulre one yea r expenence In job Dellgn Companion (Woodbourne ) OJlJltlle... ·
offered or one yur I!Itpenence in related ooropatlon In .trud.ural detllgnfconltruelion. Storephm (Gra phIC BY'lema) GTCO Uhlma
IWqUlroe one rradua~ OOW"8e Ul reinforcement COncn!~ repalr ....d .trength and one Softdetlk !.truct.ural, mech. , an:h .• civill GTCO RoII·U.,.
gnduate OOUnte In Itabih ty oratructUJ"N. $31,197.05 per ~ar, rorty hour work week. Power 486 Worbt./ltlon. OenCADD ProduC1.l
trquallfi~.lIpply at the Texa. Employment Commltllion, Dalltl •• Teu •• J .O. ~7876 -rREE DEMO DlSKAVAILABLE UPON REQUEST-
or send roe.ume to the Texaa Employment Co mrnlMlon, TEC BUilding. AUitin. TeJ:aa CADVIS IONS
78778. JO '667876. Ad paid by an equal emp1c)yment opportunity employer 2200 N t..lNlr, SUite 104, Dall... Tex.u 76202
(214)720-2023, FAX (214) 720-0617
•
w...
Apply at the Te.aa Employment Commililon, Dallu. Te..... J.O . • 6681881 or send
resume to the Texal Employment Commllllion. TEC BUilding. Austm. Texaa 78778, J .O. Nicholas J. Bouras ............................................... C II
6687881 . Ad pIIld by Itn eqU1l1 employment opportunity employe r
FROM AISC
61 10
11 2
F.ctored Moment Envelope
CONXPRT ELRFD
A knowledge-based. menu.<Jri- A new sophisticated program
ven PC software system for for interactively checking
the design of comections in structural steel building
steel framed buildings. All components for compliance
strength limit states are with AISC specification.
checked and expert advice Checks whether member
from long-time fabricator engi- satisfies all limit states and
neers is used to augment the limitauon requirements set by
design rules. the LRFD Specification and
• Generates cope sizes. allows reports which sections are
bolt stagger and permits satisfied or violated.
diNerent bolt diameters for • Review in detail the formulas
shop and field Use and rules used in the
• Designs can be stored on evaluation and interactively
disk, allowing electroric WEBOPEN assess any mathematical
communication between Designed to enable engineers expression on the screen.
design parties.
• Generates complete reports
to quickly and economically
design beam web openings. lIIOITJ • Fully interactive MS Windows·
based user intertace.
showing details and strength Uses state of the art criteria • Disk includes ELRFD
for each limit state checked. and features a clear and logi-
cal data entry system with
1110 il ChecklBrowser, AISC
Structural Shapes Database
3- fl2" or 5·114" disk
MODULE I:
SHEAR CONNECTIONS
easy-to·use color coded input
windows. Wrinen by practicing
engineers for engineers, incor·
8Iorn and sample problems
• User Guide and Reference
1st edition LRFD
Version 1.02
9th ediuon ASD
$300 porating expert design checks
and warning messages which
enhance the application of the
BPIOITJ Manual.
3-112" disk only $495
Version 2.0
MODULE II:
MOMENT CONNECTIONS
$400
AISC Design Guide-Steel
and Composite aeams with
c[00 AISC
ASD format only $400 Web Openings-to specific
design problems.
3-112" or 5-114" disk. Includes
IIc[oD DATABASE
Contains the properties and
STEMFIRE AISC Design Guide $495.00 dimensions of structural steel
Determines safe and economi· shapes, corresponding to data
cal fire protection for steel
beams, columns and trusses. AISC FOR published in the most recent
LRFD and ASD Manuals of
Based on rational procedures
developed by AISI which ex- '<. ;"....y r1 1- / >/OOv
/-
AUTOCAD Steel Construction. Presented
in the ASCII format for W, S,
Saves time doing detail draw-
tend the published UL fire M, HP and other common
resistive designs to other
possible rolled structural
,- -i- - _.n
ings of structural steel shapes
in AutoCAD. Usts properties
corresponding to data in the
shapes and chamels.
Available in U.S. customary
shapes and common protec- units or metric units. May be
tion material requirements.
Two 5-114" disks
Irl or
![ Irl' ""~ most recent LRFD and ASD
manuals. Parametrically draws
to scale the end, elevation and
converted to Lotus 1-2-3 PRN
format.
& users manual $96 3-112" or 5·114' disk $60
plan views of common shapes.
(sorry, no 3-112"
3-112" or 5-114" disk $120