JOIST DESIGN DATA SHEET

NEW COLUMBIA JOIST CO. No.1


P.O. Box 31' New Columbia, PA 17856-0031
717-568-6761 717-568-1001 (FAX)
0

HOW TO SPECIFY SPECIAL JOISTS


To obtain correct and competitive bids the specifying professional must show any special
loading on the structural drawings. Special loadings could include concentrated loads
and any non-uniform load distribution such as:

2' 2' J 5' 3' J,


.
8'

~PI! 2000 Ibs.

250 pi! I
80 pl!

3588 1bs. 2352 1bs.

span 20'

The maximum moment for this loading is 20267 lb. ft. The equivalent uniform load to
produce this moment would be 405 Ibs. per ft.

The maximum end reaction is 3588 Ibs. The equivalent uniform load to produce this
reaction would be 359 Ibs. per ft:

The K series joist tables show a 16K3 (with a 20' span) has a total load capacity of 410 Ibs.
per ft. The designer should show a 16K3SP on the drawings.

The SP indicates special requirements for the jOist. The joist manufacturer will review
the designated joist for its ability to carry the special loads shown.

Joist Girders with unequal panel point loads must also be defined by showing the load
diagram on the structural drawings.

'For all standard K series Joists the maximum end reaction is 8700 Ibs. 1f more reaction capacity is needed.
consider using two lor more) jOists to share the load. For LH and DLH joists a conservative end reaction
can be found by dividing the tabulated SAFE LOAD by two.

/NCJ/
NICHOLAS J. BOURAS, INC.
PO BOX 662. 475 SPRINGFIELD AVI:,
SUMMIT, NEW IERSEY 07902-066219081277-1617
MODERN STEEL
Volume 33, Number 4
CONSTRUCTION
------
April 1993 •
FEATURES
18 INNOVATIVE DESIGN CUTS COSTS
The use of composite construction with partially restrained
connections reduced framing costs on a 34,OOO-sq.-ft. retail
building by 27.4%

26 URBAN TRANSFORMATION
An addition to a nearly half-century old department store
allowed the creation of a modern urban mall

32 ATTRACfING ATTENTION
To survive in LAs Vegas, an old retail center had to expand
and create a new, bolder image for itself

34 AUSTRALIA REDISCOVERS STEEL


An aesthetically intricate building provided a toe-hold for
steel to penetrate a concrete stronghold
Rnther tlwn build another box-lIke structure.
Ihe developer of TIle Chifley Square Building •
in Sydney favored a higillyarliculated
building such as these popular today in the
United Stales. For more infu rmation on this
project, tum to page 34.

NEWS AND DEPARTMENTS


-----
I Modem Steel Construction (Volume 33.
Number 4). ISSN 0026·8445. Published
6 EDITORIAL 12 STEEL NEWS
monthly by the Amencan Inst~ute of Steel • Book Review
Construction. Inc. (AISC). One East 9 STEEL • Steel Calendar
Wacf<er Dr.• Suite 3100. Chicago. IL
60601 ·2001 . INTERCHANGE • AISC Lecture Series
I Adve~lslng offICe: Panis/3M. 7161 No~h
• Rigid Frame • Correspondence
Cicero. Uncoinwood. IL 60646.
Displacement • AISC for AutoCAD
Calculations • Prize Bridge Jury
Subscription price: • Connection Holes • New Design Guide
Within the U.S.-single issues $3; 1 year
$30; 3 years $85. • Weld Considerations • T.R. Higgins Award
Outside the U.S.-single issues $5; 1
year $36; 3 years $100.
40 WELDING PRODUCTS
Postmaster: PleaH send address
changes to Modern Steel Construction,
One East Wacker Dr., Suite 3100, 42 STEEL MARKETPLACE


Chicago, IL 60601 -2001.

Second·class postage paid at Chicago. IL


and at additonar mailing offices.

4 1 Modern Steel Cons truction I April 1993


There are those
• who have seen the future.

Announcing the arrival of STAAD-III/ISDS - Release 17. Once again ,


Research Engineers, has made the technology of tomorrow available to you tod ay.

Use newly introduced facilities like NON-LINEAR Release 17 marks the debut of AutoSTAAD/MAX - the
analysis, TIME HISTORY analysis, user-controlled world's first integrated structural software system that
mu ltiple iteration P-Delta analysis, steel design for works entirely within AutoCAD.
transmission towers (ASCE Pub. 52) etc. in addition to
14 different steel , concrete , and timber codes, to explore All these powerful capabilities coupled with the
the widest possible range of design solutions. industry's most knowledgeable and experienced support
staff, makes STAAD-IIIIISDS the ultimate productivity
Release 17's powerful printer plotting capabilities allow tool you've been waiting for.
you to generate the industry's sharpest and most
comprehensive run output. For the first time, you can STAAD-IIIIISDS Release 17 - there are those
combine numerical output with graphical output - all in who have seen the fu ture ... have you?
the same run document. Yes, we support the widest
..... Rese.rch
possible range of printers - from sophisticated lasers to
down-to-earth dot- matrix printers. CC
I11III Engineers, Inc_
On the graphics front, Release 17 features an 1570 N. Batavia, Orange, CA. 92667.
enormously enhanced graphics input generator with CALL TOLL FREE (800) 367-7373
speed and power. In addition , Tel : (714) 974-2500 FAX:(714) 974-4771

Researc h Engi neers Worldwide


U.S A • U K. • JAPAN . GERMANY . FRANCE . NORWAY . CANADA . INDIA
E o T o R A L


Editorial Staff
Scott Melnick,
Editor and Publisher
Endless Cycle
E
Patrick M. Newman, P.E., ven though one National Steel Construction Conference has just
Senior Technical Advisor
Charlie Carter, concluded, it's not too early to start thinking about next year's
Technical Advisor event. Specifically, AlSC is now soliciting papers to be presented
at the 1994 NSCC in Pittsburgh on May 18-20.

Editorial Offices Unlike this magazine, which concentrates on succes fu] projects, the
Modem Steel Construction Steel Conference looks for innovative design, fabrication and erection
One East Wacker Dr. techniques. As Patrick Newman, AlSC Senior Staff Engineer, states:
Suite 3100
Chicago, IL 60601-2001 "After attending a session, you should be able to take home either a
(312) 670-5407 time or cost 5<wing technique. The idea behind the conference is to
provide practical information that a designer or fabricator can readily
use in his or her office." Of course, papers can use projects to illustrate
Advertising Sales the technique.
Pattis-3M
7161 orth Cicero For example, at this year's conference, several engineers from
Lincolnwood, IL 60646
(708) 679-11 00 Skidmore, Owings & Merrill presented a paper on a Barcelona hotel that •
FAX (708) 679-5926 demonstrated several advances in fire protection for exposed steel
structures as well as an interesting application of exoskeleton design.
Another interesting paper, by Lawrence A. Kloiber of LeJuene Steel Co.
AISC Officers presented practical information on the design of tube connections. And
Stephen E. Egger, Mulach Steel presented a paper on reducing parking structure costs.
hairman
Frank B. Wylie, III,
First Vice Chairman Topics of general interest include-but are not limited to-seismic
Robert E. Owen, design, composite construction, LRFD, heavy framing, fire protection,
Second Vice Chairman
Robert D. Freeland, computer aided design and detailing, residential construction systems,
Treasurer minimizing floor-to-floor height with steel construction,
eil W. Zundel, eccentric-braced framing, and semi-rigid connections.
President
David Ratterman,
Secretary & General Counsel If you've developed any innovative design concepts and are
Lewis Bru nner, interested in presenting a paper in 1994, send a one-page abstract to:
Vice President, Patrick Newman, Senior Structural Engineer, American Institute of Steel
Membership Services
Geerhard Haaijer, Construction, One East Wacker Dr., Suite 3100, Chicago, IL 60601-2001.
Vice President, Or if you have any questions, call him at (312) 670-5417 (he's also
Technology & Research looking for suggestions on improvements in the conference that you'd
MorrisCaminer.
Vice President,
like to see made). Deadline for submission is July 15, 1993. SM
Finance/ Administration
P.S. For more il/[ormaiio/I ollilris year's show, clreck 0111 ti,e Marclr 1993


isslle as well as I/exlmol/tlr's magazille.

6 / Modern Steel Construction I Apri l 1993


..- -- - -- - - - - - - - - - - - - - -

• Our breakthrough 3-D


technology can't be shown
in a 2-D ad.

Call for your first hand


demonstration of the SDSj2
Detailing System.
• Break through time·mnsuming 2-D, line-by-Iine graphics with the 3-D
technology of the SDS.'2 Version 5.4 gives you the ability to automatiatlly
produce shop drawings and other information about a structure never before
possible. The benefits are invaluable to design engineers, steel fabricators and
detailers ...or anyone who is involved in the conception and production of steel.
The SDS/ 2 Software Solutions are the ultimate steel fabriattion tool. All
information created in SDS/ 2 or transferred through DesignLiNK from third-party
design software, atn be used throughout all phases of design and fabriattion.
The SDS '2 Software Solutions include:
• Engineering Analysis and Design Module • Detailing Module
• Production Control Module • CNe Interface
• &timating Module • DesignLINK
Call Design Data to arrange your personal demonstration or to request
additional information.

DESIGNDI
DATA III
• "First in ...software. solutions, service"
402-476-8378 or 1-000-443-0782
Our Tru-Temll1n f,olt W3.\ de"gned What If you h,we to venl) the r"'pcr mstallation of
with one \'cry important ~'Kkanrage a hurroll hcad holt! Ag,lln, It\ almo"o( lmpos"iible ... mcr you
"''Or other t\mt-off holts: a hex can't even get a wrench on the hcaJ to tc...,t or remove It.

head. So remo\lng this holt or checkmg the m,tallatlon With But you can verify m,wllatlon of our hex head holt with the
a mrque wrench ,. . jW,[ <.1'" C<l'ly a~ m.. talling It. (Urn of a wnst and a callhrated torque wrench. C'),
Usmg a qUiet, hand-held rower tool, our Tnl:rcn"on Clcmly, rh,., ,. . nne bolt that won'tlct you I I
s)'!'Itcm alw~lY"" provide.. the correer tcn .. ion. It al"iO ehmmates screw up. Our Tru#Tenslon sY'"'tcm I' also fully trilcc~lble ro

operator error JUring a..~mhIYI the bolts come rrc#a~mhlcJ our dome'tlc ,ource,. like all Nucor fa,teners. They're fully
and you can even .. ave money thanks [0 the quick, ca~y te,teJ anJ certified, mcluding comrllance with FHWA,
InMallatlon illllilowcr (0.. [ .... for vi .. uallll~rcctlon. DOT and AA HTO 'reClficatl"'" for hndge co"'truCtlon.
But, 1O.,wll all)' hutwn head fastener compared to Su, forget about cutting bolt~ off with i1 fOrch if
our hex head f,,,tener, and there\ no turnmg hack. Because ",methmg goe, \\Tong. C,lIu, at 00/955-6826, FAX 219/
It\ almo~[ Impo...... lhlc to remove a blltton head (a . . tcncr. you 337-5394 or wme PO Box 6100, St. Joe, IN 46785 til find
may even neeJ a welder to hum It off. That com you time our more ahout our Tru#Tcn . . u:m "'y"'(em. And get a fa . . tcner .
and money. If you'd ""railed our hex head holt m the fir" that has" good head ~ c::G:fjlJ1::j 11 ::j .{
placc you could remove I( wuh a "'Imple, four dollar wrcnch. flU hU"'lllc'"'''',
Steel Interchange
• -------
SIN'f ftltrrduwgt is an open forum for Modem SIN'f COtlstrllctlOtl
readers to exc.hange useful and prac.tical professional ideas and in-
formation on aU phases of slrel building and bridge construction .
Opinions and suggestions are welcome on any subject covered in
this mag,nine. If you have a question or problem that your fellow
readers might help to solve, please forward it to Modf~m Steel Con-
structlotl . At the s..lme time feel free to respond to any of the ques-
Answers and / or questions should be typcwntten and double
spaced . Submittals thai have been prepared by word .process mg
are appreciated on computer dlsh'He (either as a wordperfect file or
In ASCII format) ,
The opinions expressed in Slt'ff f"terduwge do nol necess.lrily
represent an official position of the American Institute of Steel Con-
struction, Inc. It is recogmzed that the design of structures IS within
tions that you have read here. Please send them to: the scope and expertise of a competent licensed s tructural engineer,
S teellnte rchange architect o r other licensed professional for the application of princi-
Modem Steel Constructi on ples to a particular s tructure.
1 East Wacker Dr. InformaHon on ordering A ISC publications mentioned In this ar-
Suite 3100 ticlecan be dbtained by calling AISC at 312/670-2400 ext. 413.
Ch icago, Il 60601

A quick equation for calculating Rigid Frame Dis-


placement from Lateral Loads without resorting to a
computer:
/:,

I t is sometimes necessary to rapidly calculate a rigid


frame displacement from the lateral load without
the computer application.
-
p
r---------, -,
It
I
Simple theoretical formulas are presented below;
they were derived using a moment-area theorem for I
symmetrica l rectangular frames . I
Nomenclature: /
I
It = frame height
IBM = moment of inertia of beam I I
leOL =moment of inertia of colum n I

• L =frame span
P = lateral load
E = modulus of elasticity
I!. = displacement

For two-hinged frame (Figure 1):


Pig.l Two-hinged frame

!!.. _ Ptf ( h + _L_ )


- 6E ICOL 218M
For fully fixed frame (Figu re 2): p

!!.. - PlY +2
- 12ElcOL 6K + 1
(3K J
I
I
K -- ( ICOL
'8M J(hI J /

I
These simple formulas could be very useful even
in the age of computers. The book, Rigid Frame Formu -
las by A. Kleinlogel is a very good reference.
Fig . 2 Full,y !1.xed frame
Rudolf J. Budesky


City of San Francisco
San Francisco, CA

Modern Steel onstructlon I April 1993 / 9


Steel Interchange

L
New Questions
---

isted below are questions that we would like our


readers to answer or discuss. If you have an an-
'-----
Questions:
A. Can weld "d" be used to develop or determine
the strength of the connection (member)?
B. If weld "d" is used to develop the strength of

swer or suggestion please send it to the Steel Inter- the connection, are there restrictions or parameters
change Editor. Questions and responses will be that must be placed on the weld (i.e. placement, size,
printed in future editions of Steel Intercha nge. Also, if etc.)?
you have a question or problem that readers might C. Does weld "d" take away from the jOint effi-
help solve, send these to the Steel Interchange Editor. ciency (strength)? With "d" there is a concentrated
area of weld, inducing large amounts of heat because
of the welding process. Because of this introduction of
heat. material properties are altered resulting in mem-
Connection Holes bers which are less ductile than ASTM A36 steel.

D oes anyone have any information pertaining to


the acceptability of burning connection holes in
connection material using an automated burning de-
failles R. Seale, P.E.
EIMCO P.E.C.
vice? AISC on ly addresses the burning of short and Salt Lake City, UT
long slots and indicates that it is acceptable with
proper cleanup.

Mike Pentecost
Roscoe Steel and Culvert Co.
Billings, MT

I
Weld Considerations
n developing the strength of a connection or the re-
quired length of weld to develop the member
strength, the welds "a" and "b" were first considered

(see diagram at right). These welds were parallel to
the load. Then as the codes and research continued
weld "c" was included, thus increaSing the capacity
of the member. Later weld "d" was introduced .
However, in the current AISC design criteria (Al-
lowable Stress Design and Load and Resistance Fac- '"
tor Design) this weld has not been addressed. Upon
questioning AISC, I was referred to the American
Welding Society Code. Upon examination weld "d"
,.QlfS
was omitted here as well. Additionally, my review of , S11IIJ[f\.II ..... Wfi.D s.n: Al.1J'''; -.c:
'CUll 5US C. flo«! . .ItS.
current materials on this particular subject has
1 ..no IIZl lIS POIftIII DIAl. ~
yielded no further information. I'f.I'tIDIIM · "<fSSA ~PI'K
WELD DET AIL .usc, «:ovo! .. ~..., .....
llI[DJ,Cjill[~'
IJ.O .IIS

10 I Mod('rn 51"-'1:'1 Construction I April 1993



ADVERTISEMENT

The SJI 60-Year Steel Joist Manual is


Steel Joists Make It Easier also now available. The new, 318-page
60-Year Manual replaces the 50-Year

to Build Well For Less Digest and features 98 more pages of


information. The practical section in the
Manual is designed to aid the profes-
To make building design more efficient, the Steel sional by listing four helpful categories :
Joist Institute has provided three new tools: a com- • The various building documents
required and what use they can be.
puter diskette to determine vibration characteristics, • Building site information and equipment
the SJ160-Year Steel Joist Manual, and a Catalogue needed.
• Step-by-step investigative procedures.
of Standard Specifications and Load Tables, • Time-saving data for use when analyz-
The Steel Joist Institute (SJI) has This program allows the designer to ing existing structures.
Another helpful reference that's now
created a computer program to assist the calculate swiftly and easily the frequency
available is the SJI 1992 Catalogue of
qualified professional engineer in and amplitude resulting from transient
Specifications and Load Tables. All of the
determining probable vibration charac- vibration caused by human activity on a 1992 revisions are prominently listed so
teristics of floor systems using open web joist-concrete floor. The " what if?" that specifiers can review these changes
steel joists. This program is designed for scenario-variations in slab thickness, quickly and easily.
use in conjunction with the institute's concrete strength , joist size, joist spac- The section of fire-resistive assem-
Technical Digest #5 " Vibration of Steel ing, floor decking, live and dead loads, blies has been expanded and completely
Joist-Concrete Slab Floors." span lengths-can be accomplished in revised. It lists the requisite criteria for
seconds. using K-series Joists in an assembly and
\ The program is user friendly, includes a simple, five-step procedure for
can handle spans up to 100 ft. selecting the proper and most economi-
and can accomplish in seconds cal joist. In addition , the catalogue
calculations that previously contains over 75 floor and roof assem-
required several hours. It is avail- blies listed in an easy to use chart for
able on 5V4 and 3'I2 -in. disks quick reference, with specific UL designa-
and is IBM PC compatible. A tions for fire ratings from one to four hours.
comprehensive user's manual is Last year, Underwriters Laboratories,
included. Inc. increased the allowable design stress
Long·apan Joists provide broad,
of fire-rated steel joists by 36% for floors
column·',. . expan ••• llke and 18% for roofs. The allowable tensile
the • • nctuary of this Charlotte, stress of joists used in most fire-rated
N.C., church. assemblies has been increased to 30,000
psi for floors and 26,000 psi for roofs, as
compared with the previous maximum
stress level of 22,000 psi. The new stan-
dards now make it more economical to
achieve desired fire resistance ratings
without added expense for heavier joists.
For information contact the Steel Joist
Institute, 1205 46th Ave. North, Myrtle
Beach, SC 29577.
Steel Joist Institute Members:
Canam Steel Corp.
Delong's Inc.
East Coast Steel
Gooder-Henrichsen
John W. Hancock, Jr., Inc.
The New Coiumbia Joist Co.
Owen Joist Corp.
Quincy Joist Co.
SMI Joist Co.- A Commercial Metals Co.
Socarlnc.
Valley Joist Div./EBSCO Industries
Vulcraft Div.lNucor Corp.

Ste.1 Joists, steel gird.,. and a"e' deck


make shopping cent.r construction
f •• t and economical.
Book Review:
Connections in Steel Structures II:
Behavior, Strength, and Design

By Charlie Carter rent research needs. beam-to-column connections. A
Its variety of topics results in a simplified design approach to con-

C Ollllectiolls in Steel Structures II:


Behavior, Strellgth, alld Design
is the Proceedings of the Second In-
very thorough reference on recent
research and current developments
in steel connections. Connectiolls in
cenlrated forces at beam-to-<olumn
connections is proposed in Plastic
Analysis alld Simplified Design of the
ternational Workshop on Connec- Steel Structures ll: Behavior, Strellgth , Compression Zone of a Beall/-to-Col-
tions in Steel Structure, held in alld Design (Pub. #G455) is avail- umn Connectioll. The final paper in
April 1991 in Pittsburgh. Spon- able from AISC for $44 plus $5 this topic, Review of International
sored by the European Convention shipping and handling. Call (312) Desigll Criteria for Fillet Welds in
for Constructional Steelwork, the 670-2400 ext. 433. Hollow Structural Section Truss Con-
U.s. National Science Foundation, lIections contrasts the approaches to
the University of Pittsburgh, and Bolts-The four papers pre- weld proportioning in hollow sec-
the American Institute of Steel sented on this topic addressed tion trusses in the United States,
Construction, the workshop pro- three specific areas. In Differellces Europe, and Canada and preferred
vided a forum for the assessment Betweell Europeall and American De- design approaches are proposed.
of ongoing connections research, a sigll Rules, the AISC LRFD Specifi-
review of current developments in cation and Eurocode 3 are con- Predesigned and Special Con-
connections, and the identification trasted and the author proposes nections-Seven papers were pre-
of needed future connections re- suggestiOns for the resolution of sented on this topic. New develop-
search. differences which exist. Verifica- ments in single plate and tee shear
The invited participants at this tion of Quality Assurance on Euro- connections, stiffened seated shear
conference were internationally pean 4.6 and 8.S-Bolts and Bolt Pre- connections, and bracing connec-
recognized experts in the field of loads in Laboratory and ill Field: tions are summarized in Recellt De- •
steel connections. Whereas a text- Conditiolls of Acceptance both ad- velopmellts in COllnection Research
book would attempt to address the dress quality assurance issues. The and Desigll in the USA. A review of
widest range of topics possible, the former presents the results of ran- the evolution of AlSC design aids
proceedings focuses on the latest dom sample testing verification of is made in Bolted Framing Allgle
research and developments in sev- European 4.6 (A307) and 8.8 (A325) COllnectiolls Desigll Aids: Past alld
eral, very specific topics. Further- bolts. In this paper it was found Present. In Simple Beam-ta-Column
more, the international navor of that 8.8 bolts were completely sat- COllnections, four simple connection
this publication is unmistakable isfactory, while precautionary mea- commonly used in British practice
with authors from the United sures were recommended for 4.6 are reviewed with general guide-
States, Canada, Mexico, several bolts. In the latter paper, the qual- lines and recommendations for en-
countries throughout Europe, the ity assurance performance of vari- suring rotational nexibility and sta-
former Soviet Union, and Aus- ous bolt tightening methods was bility. The paper A Desigll Approach
tralia. The resulting text provides investigated. The final paper in this for Semi-Rigid COllnections in Cold-
the reader with both a knowledge segment, Use of Snug-Tightened Formed Steel Industrial Racks de-
of work performed in other coun- Bolts in End-Plate Connections, pres- scribes current design procedures
tries and insight into how this ents tests results and recommenda- based on the recommendations of
work compares with current prac- tions for use. the Rack Manufacturers Institute.
tice in the reader's country. Welded Hollow Section COllnections
In all, fifty papers by 77 authors Welds and Local Strength Re- Under Predominalltly Static Loadillg
and co-authors were given and can quirements-Five papers were presents design recommendations
be categorized in these general top- presented on this topic. Influence of for hollow section joints in lattice
ics: bolts; welds and local strength Bose alld Weld Metal Strength on Ihe structures (trusses). The effect of
considerations; predesigned and Strength of Welds explores the valid- deformations on the soil-footing in-
special connections; composite ity of basing design weld strength terface on the rotational resistance
connections; semi-rigid connec- predictions on the mean value of characteristics of a foundation sup-
tions; available connections soft- the strength of the base and weld port is the subject of Steel Boseplate-
ware; global behavior of semi-rigid metals. Forces in Beam-ta-Columll Footing-Soil Behavior. •
connections; examples of frame de- Connections presents an alternative
sign; and economy of design. A approach to the determination of Composite Connections-Eight
final segment documents the cur- forces in semi-rigid and rigid papers were presented on this

12 1 Modern Steel Constructio n I April 1993


topic. Semi-Continuous Composite Examples of Frame Design-


Frames in Eurocode 4 explains the This topic contains six papers. Pro-
approach for semi-rigid composite posed design recommendations are
frames taken in Eurocode 4 and summarized in Behavior of Semi-
identifies the difficulties encoun- Rigid Connections and Implementa-
tered and needed research. In Para- tioll ill Frame Desigll. The use of
metric Study of Composite Frames, LRFD in semi-rigid frames is dem-
the behavior of semi-rigid compos- onstrated in Design Allalysis of
ite frames is compared favorably Semi-Rigid Frames with LRFD. A
with that of similar rigid frames to simplified approach allowing the
show that the use of semi-rigid

L· -
inclusion of flexibility effects on
composite construction is valid. frame design is presented in Practi-
The force transfer mechanisms in- cal Desigll Allowillg for Semi- Rigid
volved in semi-rigid composite _...,.,,- -:=:- COIlllections. The Effect of COIlllectioll
0,;::-
connections is investigated in Slab Flexibility on Portal Frame Behavior
and Beam Load Introduction in Com- examines both full scale testing
posite Columns, while a model for and analytical modeling in flexibly
analysis is proposed in Energy- connected portal frames. The effect
Based Prediction for Composite Joints of static and dynamic loadings on
Modelillg. The ability of composite frame stability is examined in Allal-
connections to meet the necessary ysis of Frames for Stability. All Alla-
performance criteria is assessed in Iytical Allalysis alld Design System
Tests on Composite Connections. Ro- CONXPRT. A CAD System for Semi- for Steel Frames with Partially Re-
tational behavior and the outcome Rigid Joints in Non-Sway Steel strailled COIlllectiolls describes a
of cyclical testing is presented in Frames elaborates on the analysis method for modelling semi-rigid
Semi-Rigid Composite Joints: Experi- method, design approach, and fea- beam-to-column connections in
mental Studies. The non-linear be- tures of this limit-states based pro- steel frames.
havior of this connection is further gram.
described in The NonLinear Behavior Economy of Design-Four pa-

• of Composite Joints. Finally, the ef- Global Behavior of Semi-Rigid pers were presented. In Economy of
fect of cyclical loading is further Connections-Eight papers were Semi-Rigid Frame Desigll, the cost
explored in Cyclic Load Analysis of presented. Connection Momen t-Ro- benefit of using semi-rigid connec-
Composite Connection Sub- tatioll Curves for Semi-Rigid Frame tions is evidenced. The cost benefit
assemblages. Design examines the use of actual of the "temporary" semi-rigid
versus simplified representations frames used in a 3D-story building
Semi-Rigid Connections-Four of the connection characteristics. in Mexico City is described in Tem-
papers were presented in this The relationship between joint flex- porary Flexible COllllectiolls ill the
topic. Reliability of Rotational Behav- ibility and frame stability is investi- COllstruction Process. For bracing
ior of Framing Comlections addresses gated in COllllectioll Respollse alld connections, a cost comparison of
the statistical variations caused by Stability of Steel Frames. In addition different design methods is pre-
fabrication and erection tolerances. to this the effect of force distribu- sented in A Cost Comparison of Some
Refinements to existing methods tion and deformations are exam- Methods for Desigll of Bracillg COII-
are presented in Plastic Capacity of ined in Prediction of the Influence of nectiolls. Finally, the use of cold-
End-Plate and Flange Cleated Connec- COllllection Behavior on the Strength, formed members and semi-rigid
tions: Predictions and Design Rules. Deformation, and Stability of Frames, columns is investigated in Semi-
The effect of cyclical loading is ex- by Classification of Connections. The Rigid Lightweight Steel Frame SKEL-
amined in Analysis of Flexibly Con- semi-rigid nature of joints in hol- ETON.
nected Frames Under Non-Propor- low sections is investigated in
tional Loading. In Moment-Rotation Semi-Rigid Connections in Lattice Current Research Needs for
Characteristics of Bolted Con nections, Girders Formed with Hollow Struc- Connections in Steel Structures-
the effect of column flexibility is tural Sections. The results of a study The final segment of this publica-
considered for bolted semi-rigid of seismic behavior of rigid and tion presents the current research
connections. semi-rigid frames is presented in needs for connections in steel
Cyclic Behavior of Frames with Semi- structures. These needs were de-
Connections Software-Three Rigid COIlllections. A similar stud y veloped from the technical papers
papers, describing connection de- is presented in Dynamic Tests of presented and the ensuing discus-


sign software, were presented . The Semi-Rigid COImections. Finally, an sions.
Eureka "ClMSTEEL" project, a Eu- analytical modelling approach is
ropean approach, was described in described and interpreted in Ana- Charlie Carter is Staff Ellgineer-
one paper, while a second de- lytical Modeling of Cyclic Behavior of Structures with AISC.
scribed AISC's expert system, Bolted Semi-Rigid Connections.

Modern Stl'el Construction I Apnl 1993 / 13


S T E E L C A L E N o A R

B
AISC Lecture Series: New Ideas In Structural Steel
eginning in March, AISC Mar-
keting, Inc. will offer a new
lecture series focusing on innova-
tions in structural steel design. Nw


The four-part seminar covers:
Low-rise buildings.
Design of connections.

Eccentric braced frames.
registration fee are a dozen hand-
outs and publications plus a meal.
For information, contact: Colleen
Hays, AISC, Inc., One East Wacker

Ideas In Structural Steel will present •
Partially restrained connections. Dr., Suite 3100, Chicago, IL 60601-
practical design concepts for engi- Registration fee is $60 ($45 for 2001 (312) 670-2400.
neers and fabricators. AISC members). Included in the

WEST Date MIDWEST O••e NORTHEAST 081.


Los Angeles 5/4 St.louis 4/13 NewYorX 4/29
Irvine 6110 Detroit 5/11 Newark 6122
Sacramento 6122 Indianapolis 5/13 Rochestor 9~;-
- -
San Francisco 6124 Minneapolis 5/25 Albany 9123
Milwaukee 5/27
-
Chicago 613
--
I- ..... Date-
SOUTHWEST Date SOUTH Dal. MID-ATLANTIC
--
- Denver
Kansas City
Dallas
San Antonio
411
4/15
5/6
611
- - r-
Greenville
Charlone
BIrmIngham
Miami
4120
4121
9/9
911 4
+ r-
- Pinsburgh
Baltimore
Washington
Philadelphia
-
4127
5/18
5120
6123
-

Houston 618 Orlando 9/16 Cleveland 10119 _


Atlanta 9128 Cincinnati 10121
Richmond 9/30
-
Stee l Bridge Forum (April 1 in Baltimore) Steel Bridge Forum (April 22 in Raleigh, Topics include: equipment selection and
sponsored by American Iron &: Steel Insti- C) sponsored by American Iron & Steel In- cost justification; precision laser cutting
tute. Topics indude: Guide to Selection of stitute. Topics include: Overvie w of Steel techniques; YAG. fiber-delivercd process-
Bearings and Short Sp..1" Steel Bridges. Con- Service Centers; Skewed & Curved Bridges; ing; laser/ punch combination machines;
tact: AIS!. 1I0117th 51., .W., Suite 1300, Short Span Steel Bridges; and Guide to Se- high-energy thennal processing; program-
Washington, DC ~700 (202) 452-7100; lection of Bearings. Contact AlSt, 1101 17th ming laser cutting systems; C()2 multiaxis
Fax (202) 463-6573. St., N .W., Suite 1300. Washington, OC processing; material handling equipment;
200J6.4700 (202) 452-7100; Fax (202)46J. equipment Specifications; maintenance; and
Tr~nsportation Planning for Livable Com- 6573. safety. For more information , call (815) 221-
munities (April 2-3 in San Francisco, April 8202.
23-24 in Atlanta, and April30-May 1 in Win- Symposium on Project Management (May
ter Park, FL) sponsored by FHWA, Na tional 13-14 in Chicago) sponsored by Association 1993 Symposium on Computer Integrated
Trust for Historic Preservation, a nd others. for Project Managers in the Ocsign Profes- Building Sciences OunelO-l1 in Anaheim.
Workshops explain the lntennodal Su rface sions. Topics include: sta te of the art project CA) sponsored by the Internationa l Cound l
Transportation Efficiency Act of 1991 management techniques; the e merging con- for Building Research a nd Documentation.
(lSTEA). For information, ca ll (800) 937- cept of partnering; creating a Total Quality Topics will include: automated const ruc-
6847 Management component to each design tion (using no people); automated fabrica -
project; making effective project decisions; tion; robotic tools for construction; and 3D
Workshops for Rural and Small Urban Of- new project ma nagement directions fo r the modeling. An additional session will fea-
ficials (April ~7 in Burlington, vr, and economy of the '90s; a nd case s tud ies in- ture the new Disney Concert HalJ Project,
May 18-19 in Hershey, PAl sponsored by cluding managing quality on the new Inter- which has been designed on 3D CAD and
Na tional Association of Counties, U.S. na tional Complex at O'Ha re Airport. Con- has used NC for the cutti ng of stone and
J:)('pl. of Agriculture, NACE. and USOOT. tact: APM al (312) 4n - lm; Fax (312) st ructural steel. For more information, con-


Sessions will focus on new opportunities 525-0444. tact : Ha rold Jones. SCIBS'93, 1700 Asp Ave-
for roads and bridges, rural trans it, eco- nue, Norman, OK 73037-000 1 (405) 325-
nomic development and research and tech- Lasers in Fabricating Conference (May 18- 1947; Fax: (405) 325-7968.
nical assistance. For infonnation, ca ll: (202) 20 in Schaumburg, III sponsored by the
nO-8042. Fabricators &- Manufacturers Association .

14 1 Modern Steel Const ruction 1 April 1993


STEEL NEWS
A Quick Quiz
• Correspondence
Dear Editor:
For Structural Engineers
The more a computer program costs, the
better it is.
A program that solves complex, difficult
TRUE

TRUE
FALSE

FALSE
I n the January, 1993 issue of Mod-
em Steel COllstruction you pub-
lished a list of various structural
prablems must be complex and difficult
to use.
Structural engineering software can never TRUE FALSE
steel shapes and the principal pro- be fun to use.
ducers of these shapes. What is not
clear, however, is whether all If you answered TRUE to any of the above, or you would like to know more
shapes listed are available in A36 about a truly innovative software program, colt us!
and A572 Grade 50 materials. It has
been my understanding that A572 L~,.,
Grade 50 material is available for - ~ ~

~.!
r-;;:
W shapes only. -
RISA-2D
~

f- ~'
E,
M . Garkawe
Director, COli tract Desigll Dept.
-
Foster WIleeler Energy Corp.
Clinton, NJ
·V~ f-
I--
Your complete solution for
frames, trusses, beams,
L
shear walls and much more!
Editor's Response: Most struc-
tural shapes, including angles and
channels are available in A36, A572
and A588. In addition, some mills
n
K.
ISA 26212 Dimension Drive, Suite 2DO
Lake Forest, CA 92630

• offer special grades for bridge de-


sign. ~~TiEiCiHiNiiOiLiOiiGiliEiSiiiiiiiiii~iili-8iOiOi-~3~3~2~-7~4~72~~~~~~;:
An updated version of the Struc-
tural Shapes Availability List will
appear in the July 1993, followed
by regular updates in each January
and July issue. STEEL BRIDGE DESIGN on your PC

MD X's steel bridge girder design program is licensed by many of


Clarifications the largest EN R Top 500 Design Firms, as well as smaller firms and
state DOTs. Now this program interacts with a grid analysis module
that loads user·defined lanes with standard or custom trucks.

T he phone number for EJE In-


dustries was incorrectly listed
in the February issue of MSC. The Integrated Grid Analysis & Bridge Girder Design
correct phone number is (800) 321- • Non-prismatic I girders and box girders, rolled shapes
3955. We regret the error. • Up to 12 continuous spans, horizontal curvature, skewed supports
• Generates geometry for girders and bracing

T he following chart should


have been included on page 16
of the December 1992 issue:



Generates influen ce surfac es, loads lanes for live load forces
User may specify ranges for (or fix) any of the design variables
Designs girders with a powerful optimization method (one that works!)
• Generated designs satisfy the 1992 AASHTO Specification
Section LP LO P e • Allowable Stress and Load Factor versions
(ft) (ft) (kips) (in) • Excellent for analyzing existing structures for specification compliance
W36x300 96 75 464 11 .37 • Full control of composite action
W33x152 69 48 350 10.25 • Either free f orm or m enu driven input, comprehensive output
• Graphical output of stresses and deflections on screen or printer
W16x40 24 15 119 2.26
And many more!


In the above table, LP is the
maximum span with prestressing, For more information. or to request a free trial . contact:
LO is the maximum without pre-
stressing, P is the prestressing
force, and e is the eccentricity. MDX software
Phone (314) 446-3221
Fax (314)446-3278

S TEE L NEW S
-----------------

Atlanta To Host Steel New Version •


Bridge Symposium Of AISC For
AutoCAD
T he National Symposium on
Steel Bridge Construction is
In addition, a special Student
Bridge Competition demonstration
scheduled for Nov. 10-12 in At-
lanta. Presented under the auspices
of the Council for the Advance-
will be held . (The Student Bridge
Competition is a series of regional
events where teams of engineering
A utoCAD Release 12 users can
now save even more tIme
doing detail drawings with Version
ment of Steel Bridge Technology, students from approximately 100 2.0 of AISC for AutoCAD. The lat-
the symposium is intended to cre- schools with civil engineering pro- est release offers several enhance-
ate a dialogue between owners, de- grams compete to design and con- ments, including: a more intuitive
signers, and builders. Co-sponsors struct a 20' working scale model. dialogue box user interface with
include AISC, FHW A, AASHTO, The students are judged on the point-and-click list box shape selec-
and AISI. weight of the bridge, its load-carry- tion; metric support; optional inser-
Workshop sessions will kick-off ing capacity, aesthetics, and speed tion point selections; and overall
the symposium on ovember 10. of erection.) increased speed . Version 2.0 takes
Anticipated topics include: shop The winners of the 1993 Prize full advantage of the improve-
and field painting; relevant EPA re- Bridge Awards will be honored at a ments made to AutoCAD in Re-
quirements; and economical and November 11 dinner banquet. A lease 12.
innovative steel bridge design and slide presentation will highlight the
construction techniques. winning projects. An entry form for
Following the workshops will be the Awards program appears on 'e- ..... .. ,_ _
.110; 1.. . , ..:.. , .
• _'0"" '_ ''"' ,,...
technical sessions featuring such
topics as: performance reports on
pages 24 and 25 of this magazine.
For more information on the
M .. . ..

:::~
• .,_

,- ~I~~
..
.. .. . ft ",..
.. .. . " I' ..
weathering steel; horizontally
curved bridges; bridge reports on
Prize Bridge Symposium, contact
the AISC Membership Services I~ ..:: ...: ::"
,,,
~
.. .. . 11

major structures; innovations in Dept. at (312) 670-5420; Fax (312) M il . . .
tf ......1L ,--".
steel design; and workshop reports. 670-5403. II . . ..

. .. . M

1993 Prize Bridge A1SC for AutoCAD is a shapes


library that will parametrically
draw to full scale the end, eleva-
Jury Named tion, and plan views using the de-
sign dimensions of W, S, M, and
HP shapes, American Standard
E ntries are now being accepted
for the 1993 Prize Bridge
Awards. To be eligible, a bridge
fee. A complete entry form appears
on pages 24-25 of this issue.
This year's jury is comprised of:
channels (C), miscellaneous chan-
nels (MC), structural tees cut from
must be located within the U.s. or Frederick Gottemoeller, a consul- W, M, and S shapes (L and 2L),
structural tubing (TS), and pipe.
its territories, be built of fabricated tant with Frederick Gottemoeller &
structural steel, and have been Associates; james McCarty, presi- The shapes correspond to data
completed and opened to traffic be- dent of ASCE and a consultant; published in Part 1 of both the 1st
tween May 1, 1988 and April 30, james Powers, preSident of En- edition LRFD Mallllal of Steel COIl-
1993. Bridges are judged based on virodyne Engineers; and joseph structioll and the 9th edition ASD
aesthetics, economics, and de- Siccardi, a staff bridge engineer Mallllal of Steel COllstructioll.
sign/ engineering solutions. with the Colorado Dept. of High- Version 2.0 runs only in Auto-
Categories are: long span; me- ways. CAD Release 12 and above. Ver-
dium span, high clearance; me- For more information, contact: sion 1.0 is still available for Auto-
dium span, low clearance; short Christy Depkon, A1SC Director of CAD Release 10 and 11 users. The
span; grade separation; elevated Public Affairs, AlSC, One East cost for either version is $120.


highway or viaduct; movable span; Wacker Dr., Suite 3100, Chicago, fL For ordering information, con-
railroad; special purpose; and re- 60601 -2001 (312) 670-5432; Fax tact: AISC, One East Wacker Dr.,
constructed . Deadline for entry is (312) 670-5403. Suite 3100, Chicago, lL 60601-2001
june 18, 1993, and there is no entry (312) 670-2400; Fax (312) 670-5403.

16 / Modern St<'Ci Cons truction I April 1993


~D
~
,to.
'-.l
tT'

• Design Guide On W-Shapes T.R. Higgins


T "Load
he sixth AlSC Design Guide, erate composite column design ta-
a nd Resistance Factor bles as described in Part Four. The
Design of W-Shapes Encased in
Concrete (D806)" is now available.
Award
software cost is $80, and includes
the Design Guide.
D oberto T. Leon, an expert on
.I.'-steel composite connections,
The publication, which was au- The other fi ve AlSC Design
has won the 1993 T. R. Higgins
thored by Lawrence G. Griffis, P.E., GUides prevIOusly published are:
Lectureship Awa rd sponsored by
of WaIter P. Moore Associates, Inc., D801-Column Base Plates (by
AlSC. Leon, selected for his pa-
covers composite columns com- John DeWolf and David Ricker);
pers on semi-rigid composite con-
prised of roUed wide flange shapes D802-Design of Steel and Com-
~ections, is an associate professor
encased in reinforced structural posite Beams with Web Openings
In the Department of Civil and
concrete with vertica l deformed re- (by David Darwin); D803-Service-
Mineral Engineering at the Uni-
inforcing bars and lateral ties. ability Design Considerations for
versity of Minnesota.
Part One covers composite Low-Rise Buildings (by James
frame construction, reviews impor- Fisher and Michael West); D804- Leon gave a presentation based
on his papers at the NSCC in
tant practical considerations, and Extended End-Plate Moment Con-
nections (by Thomas Murray); and March and will give an add itional
presents pertinent design criteria.
six lectures during 1993 and 1994.
A set of suggested design details in D805-Design of Low- and Me-
Lectures are tentatively scheduled
given in Part Two. Part Three in- dium-Rise Steel Buildings (by
for Oct. 14 in Kansas City and Oct.
cludes five examples, while Part Horatio Allison). Each design
15 in Houston.
Four contains comprehensive de- guide costs $16.
For more information, contact:
sign tables. For more information or to order
Robert F. Lorenz, AISC Director of
A companion computer pro- a copy, caIl the AlSC Publications
Education & Tra ining, (312) 670-
gram, CMPOL, is available to gen- Department at (312) 670-2400.
2400; Fax (312) 670-5403.

OESCON
DESIGNS AND DETAILS
STEEL CONNECTIONS

Il-.+li.:!1l·· -- ••.•.•••
c

FOR A FREE DEMO DISK


CALL OR WRITE TO

OMNITECH ASSOCIATES
P.O. BOX 7581
BERKELEY, CA 94707
658-8328

Phone (205) 79 1-2011


Modern Steel Construction
RETAIL CONSTRUCTION

Innovative Design.
Cuts Costs
The use of composite construction
with partially restrained connections
reduced framing costs on a
34,OOO-sq.-ft. retail building by 27.4%
P until October 1990, the

U Mt. Kisco Furniture Store


was a thriving retail estab-
lishment in downtown Mt. Kisco,
NY. Then tragedy struck in the
form of a raging fire that destroyed
the structure. The owners, the
Saroken family, moved quickly to
replace the building which had
long housed the family business.
"The owners wanted the re-
placement building to fit into the
context of the community, but they •
also wanted the best looking build-
ing on the block," according to
Kenneth Nadler, a principal with
Nadler Philopena Architects. "We
photographed the entire street and
our design tries to pick up the scale
and proportion of the nearby prop-
erties." The result is a limestone fa-
cade with classic features such as
AI firsl glance, Ihe brass light fixtures. "We wanted
m!wMt . Kisco the structure to be reminiscent of a
Fumiture Store in turn-of-the-century cast iron build-
MI . Kisco, NY, looks ing, but with modern touches," he
like mosl of Ihe olher explained. The two-story building
nearby s/ruc/ures. houses a Gap store on the first
Closer examinatiml, floor and the family furniture busi-
however, reveals all ness on the second .
imlOvntive But while the architectural de-
structural system sign of the building is traditional,
that ",inimizes the structural design is thoroughly
material use. modern.
Typically, a small 34,OOO-sq.-ft.
(3160 m 2), two-story retail store
would be designed with simply
supported girders. Instead, the en-
gineer, N. Wexler Consulting Engi-
neers, ew York City, decided to
use composite girders with par- •
tially restrained connections
(Wexler calls his design a Re-

18 ' Modern Steel Cons truction I Apnl 1993


strained Girder System, or RGS).
The reason for the design, ac-
• cording to eil Wexler, P.E., was
economics. "Simply supported
girders would have been W14x34;
with restrained girders, only
W14x22 were required," he ex-
plained. "The entire project used
only 76 tons (68950 kg) of struc-
tural steel, resulting in about 4.5
Ibs. of steel per sq. ft. (22 kg / m2)-
a very efficient structure."
Wexler has been working with
composite girders and partially re-
strained connections for several
years and has recently begun giv-
ing presentations on the subject.
"The traditional design for
building with steel frames is
based on composite girders with
simple connections," Wexler
writes. "The disadvantage of this
traditional design is that the entire
moment requirement is at one por-
tion of the girder, resulting in large
size girders. Also, girders have
large mid-span deflections during
construction, when the concrete is
wet. In order to eliminate these dis-
advantages, the designer specified
• camber or temporary shoring.
However, since both of these meth-
ods are costly and difficult to im-
plement, contractors often pre-
ferred to do without them and
instead increased girder sizes even
further. With partial restraint con-
nections, girder sizes can be de-
creased and deflections reduced ."
With RGS, two different re-
straint types are poSSible, accord-
ing to Wexler. "When deflections
during construction are large,
and/or the girder sizes are gov- By /lsi"g composite cotls/ruction witlt part ially reslrained emmec/iotls, tltl' project's
erned by construction loads, desigller reduced Ihe Iypical girder size from W14x34 10 W14x22 . The RGS desigll also
girder-to-column moment connec- reduced the tlumber of studs required, though il did require the member to be cambered.
tions are preferred. When deflec-
tions do not govern, and the girder
size is governed by superimposed
loads, negative concrete reinforce-
ment bars are preferred." Due to
the small calculated deflections
during construction, only concrete
reinforcement was used for the Mt.
Kisco Furniture Store project.
As with composite construction
with simple connections, the de-
• sign of a partially restrained sys-
tem is done in two phases-a con-
struction phase when the concrete

Modern Steel onstruchon I Aprtll991 / 19



tion has reached its elastic capacity, during the construction phase is the column that at least twice the
it will deform plastically," accord- unnecessary. One way to evaluate minimum area of steel reinforce-
ing to Wexler. "All excess moment a girder with moment connection ment be extended on each side of
"shaken off" by the semi-rigid mo- is by making use of moment con- the column centerline.
ment connection is now transferred nection rotation curves. 'With
to the middle section of the girder. RGS, a composite girder with par- Other Considerations
Since this middle section is com- tial restraint behaves just like a Unbalanced loads: While unbal-
posite with the concrete, it is both steel girder with full restraint when anced loads might overstress non-
strong and rigid. Therefore, any the concrete is wet," according to composite steel girders with partial
deflections associated with the Wexler. "After the concrete hard- restraint, this is not the case with
final phase are small." ens, and additional loads are su- composite girders for most com-
Wexler does caution that the de- perimposed, the connection pro- mon buildings as long as adequate
sign engineer must investigate for vides additional restraint until concrete reinforcement is prOVided.
each individual project the sensi- yielding of the reinforcement bars; Ductility: Ductility is associated
tivity of the system to deflections then the girder behaves just like a with the ability of the joint to rotate
when the concrete is wet. [n some simple supported composite after yielding. Joint rotation can be
cases, the engineer will need to girder." prevented by premature local or
give recommendations for the con- overall buckling of the bottom
crete pour sequence and the ac- Additional Restraint flange and buckling of the web.
ceptable locations of construction Research done at Queens Uni- The use of under-reinforced sec-
joints. versity in Kingston, Ontario (Can- tions assures adequate post-yield-
ada) by Professors Karl Van Dalen ing rotations, Wexler stated.
End Moment Connections and Hernan Godoy reveals that ad- Composite Studs: Stud design
For moderate size moments, ditional moment strength can be criteria is similar to composite
Wexler uses an end plate type con- achieved at the beam column con- girders without restraint with the
nection. "It performs well as a rigid nection if only 0.46% of the con- exception that if top reinforcement
connection during the construction crete slab area is provided as slab is used for restraint then additional
phase and as a semi-rigid connec- reinforcement, reports Wexler. studs are required between the


tion during the final phase," he ex- "This additional strength is at least point of maximum negative mo-
plained . "An end plate is a particu- equal to the ultimate moment ca- ment and point of zero moment.
larly good choice because not only pacity of the composite beam and "The number of such studs shall be
does it deliver forces to the column is not influenced by the type of selected to develop the negative
but it also reinforces the column by connection between the steel ele- moment," Wexler said .
spreading compression forces over ments. The rotational capacity of
larger areas, just like a bearing the composite beam-column con- Cost Savings
plate, thus redudng the need for nection also is at least equal to that The cost savings on the Mt.
compression column stiffeners. It is of a conventional, non-composite Kisco project were dramatic. With
especially economical when full rigid steel connection. simple supported girders, the proj-
penetration welds are not re- Wexler adds that the AlSC Man- ect would have used A36 W14x34
quired ." lIal of S/eel Construction (LRFD) al- girders with no camber and no re-
Another acceptable connection, lows calculations of the negative bars and 40 studs. Wexler reports
according to Wexler, are top and design moment strength based on that in the New York City area, the
bottom angles. "Angles are a good plastic stress distribution of the 20' girder plus the 40 studs would
choice because the bottom flange is composite section provided that cost approximately $610 (on pro-
reinforced against local buckling the following are met: jects outside of New York City,
by the horizontal leg of the angle." • Shear connectors are located in Wexler has paid as little as $450).
For this project, an L8x4x1l2 was the negative moment region. The composite system with par-
used to enure that the girder bot- • The slab reinforcement is ade- tially restrained connections, how-
tom flange bears against the col- quately developed. ever, required A36 W14x22 mem-
umn. The project utilized 2112" (64 • The steel beam is compact and bers with :V4" 09 mm) camber, four
mm) of light weight concrete braced . #5x8' long rebars and 34 studs. The
poured over 1112" (38 mm) metal "The designer can use this addi- cost in ew York City for the 20'
deck. At one location, where the tional strength to reduce the girder (6.09 m) girder, camber, rebars and
span is 34' 00.4 m), the concrete size further," Wexler said. "Only studs is approximately $443 (out-
thickness was increased to 5" 027 additional studs and negative con- side of New York City, about
mm) in order to decrease floor vi- crete reinforcement are needed." $328), for a savings of $167 per

• brations. Bay sizes are typically 23' He does caution, however, that member, or more than 27% com-
x 23' (7.01 m x 7.01 m). Van Dalen's research shows that in pared with other design methods.
Increasing the connection size order to ensure a uniform cracking
beyond that required for full fixity pattern in the slab in the vicinity of

Modern Steel Construction I April 1993 / 21


IF YOU'RE WONDERI
THE
HER STEEL JOISTS
When San Antonio needed an economical structural ystem for the roof
of their new AlamoJome, Vulcraft had them covered.
Because they had a lofry construction goal: to build the most economical
and fl exible hard-roof stadium ever built. How economical did it need to he l
Let's put it this way. The entire structure had to be paid for in fi ve year; with
only the help of a one-half cent sa les tax.
Which meant when it came to choming
partner , everyone had to . harren their pencils
i and do their financial homework. When it was
all over, everything pointed to a cable-suspended
sy tem using Vulcraft super long span steel joists.
A chief benefit of joist ' high strength-to-
weight ratio is that there's Ie tonnage to pay for,
ship, and erect. And there's no more effective
way to save money than to keep these to the absolute minimum.
As for experience, no one has accomplished more with steel jobt, than
Vulcraft. As the largest producer of stee l joists and steel deck in the United
States, we have more engineering background and know-how than any other
joist company.
So our engineers were able to interact closely with the AlamoJome'
project designers right from the beginning. Bringing our many year; of
experience to the project at every stage, from early planning through erection
of the entire job. Addressing the proper use of each component. alculating
loads. And helping determine requirements for attachments, and ,tnlctural
relationships.
As a result, we were able to supply 1,700 tons of prohlem-free steel joist,
for thi job, 35 of them measuring 210 feet in length- extraordinary hy any
standards. Plus, we supplied nine acres of acoustical steel deck to cover them.
A you might have noticed, we're proud to have been a part of a project
like this. We'd be no less proud to assist you. Call anyone of our plant, Ii,ted

make your next project a success.


Until then, when you think of the
WLCRA-=
below, or consult Sweet's 051 00/VUL and 05300/VU L, to 'oCe how we can

_.-.!'"
I
Alamodome, remember Vulcraft. A Dw;,,,," of Nt/cor Corporal/on
1'0 IJ,» 637. Bngham e ll). UT 84302.80 1/73 4-9433; PO 00., 100520. F.w,nc,. SC ]9501. &3/662")3RI.
1'000x 169. F." Po,"..,. AL 35967. 205/845·246('!; 1'0 00x 186. C;,.,,,,,,,,,J. TX 75844. 4CI9/6il7·4665.
1'0 IJ"., 59. No1v1k. NE 68702. 402/644 -8500; 1'0 Il<,. 1000.SI}",. IN 46785. ZI9/.Uii411
Archuecu:: Marmon Barclay SOU!t'T FOSfeT' Ha)'s and I 10 K Sports Flier/JIleS Groll!'; SmccftlTal Engll'1<:t'1' \~. E
Snllpsol'I (",(). lru.'_; PI'(IJCt:f Mttrltwt.'T: Day & ZlIIlIlIemlt;nl , Inc; SmKumJ ContT(I((Il'r: L:;Jl irk:f)!porareJ, 'Icd
F,dmcat(lf1, CrottTl Slee/ lnc, and InJlLSITUlI :-"Il't:hlmll·a/ (:11.; Suel crn:IQr' John F lkusk) (:mum"llf," (:n.
AISC 1993 Prize Bridge Competition

Rules •
I Eli9ibility Entry Requirements
To be eligible, a bridge must be built of fabricated All entries must contain an entry form. photographs and a
I structural steel, must be located within the United States
(defined as the 50 ;tates. the District of Columbia, and all
written description of the project. A separate binder must be
submitted for each entry. 0 entry free is required;
U.S. tenritories), and must have been completed and opened submission materials will nOl be returned. The use of any
to traffic between May I. 1988 and April 30. 1993. entry's submitted data. detail and/or photographs by AISC
shall be unrestricted. Note: Projects not receiving an award
still may be used in Modern Steel COlis/ruction magazine or
other AISC marketing materials.
Judging Criteria
Judging will be based upon aesthetics, economics, design I. Entryform: The complete and accurate entry form and
and engineering solutions. Quality of presentations. though one copy must be enclosed.
not a crilerion. is Important.
2. Photographs: A minimum of four professional quality
8x 10 color prints of various views showing the entire
Award Categories bridge. including abutments as well as selected details. are
Entries may be judged in one or more categories, but can required. 35 mm slides are strongly recommended.
receive only one award. Photographs will not be returned.

Long Span One or more spans more than 400 ft. in length. 3. Description: Explanation of design concept, problems
and solu tions. aesthetic studies. project economics and
Medium Span, High Clearance Venical clearance of 35 unique or innovative aspect of the project. Include no
ft. or more with longest span between 125 and 400 ft. than II x 17 drawings showing elevation, framing system
and typical details.
Medium Span, Low Clearance Venical clearance less
than 35 ft. with longest span between 125 and 400 ft.
Method of Presentation
Short Span No single span greater than 125 ft. in length. Each entry should be submitted in an 811.!'· x II" binder.
containing transparent window sleeves for displaying
Grade Separation Basic purpose is grade separation. insens back to back. The entry form included in the
brochure must be easily removable, so that the
Elevated Highway or Viaduct Five or more spans. identification of the entry can be concealed during judging.
crossing one or more traffic lanes.

Movable Span Having a movable span.


Awards
The winners will be notified shonly after the mid-August
Railroad Principal purpose of canying a railroad. may be
judging. Public announcements of the winners will be made
combination. bUI non-movable.
in the November issue of Modern Steel Construction
Special Purpose Bridge not identifiable in one of the magazine. Award presentations will be made to the winning
designers at the National Symposium on Steel Bridge
above categories. including pedestrian. pipeline and
airplane. Construction, November I I. 1993. in Atlanta, GA.

Reconstructed Having undergone major rebuilding.


Deadline for Submission
Entries must be postmarked on or beforelune 18, 1993.
I and addressed to: American Institute of Steel ConstruCtion.
Inc .. Attn: Awards Committee. One East Wacker Drive, •

L
Suite 3100, Chicago, IL 60601·2001. For further
information, call 3 12/670-5432.
l .

AISC 1993 Prize_Bridge Competition ~


J'
, )

• Entry Form
Enlry Oale_ _ _ _ _ _ _ _ _ __

Name of Bridge'_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 'ComplellOn Oale'_ _ _ _ _ _ _ _ _ _ _ __

Location'____________________ Date opened to traflic____________________

Category in which cntered,____________________~A pprox. 10lal cost______________

Span lenglhs, _ _ _ _ _ _ _ _ _ ,Roadway wldths _ _ _ _ _ _ _ _~Sleel wl./sq. fl. of deck_ _ _ _ _ _ _ _ _ __

Vertical clearance,_ _ _ _ _ _ _ _ _ _ Slcellonnage'_ _ _ _ _ _ _ _ Paonlcd: ye._ _ _ _ _ _ _ No'--_ _ _ _ __

Structural system(s) (describe briefly hcre)'_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

Innovative Concepts ___________________________________________

Descriptive data: Attach separate sheets (see entry requi rements)

No. of photographs enclosed: Color prints 35 mm slides

O~ignFirm: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _~~--------------------
Phone

Address:. _ _~~-----------------~~~~--------~~-------
StlH.t C'lyand 51J11r up
Person to COnt3Ct: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _:;;::;::-_ _ _ _ ____


Tllk
Consulting Firm (ifa ny): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ --,=,.,....__________________
Phone
Address:._ _~~----------------""~~~-------~~------
Stree1 C,IY and St.t . ~ ZiP
Person locontacl: _ __ _ _____________________________ =,-______
T,tk
General Contracting Firm: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _-=-_____________________
Phone
Addre~:: _ _~-----------------~-~,.,....-------~~------
Strttt ell)' and Sllle ZIp
Person locontact: _ __ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _:;;::;::-_ _ _ _ __
Title
Steel Fabricating Firm: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _--,,_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Phone

Addre~:: _ _~~----------------""~~~-------~~------
S~I CIty and Stale up
Person locontacl:_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _:;c::_ _ _ _ _ __
Tllk
Steel Erecting Firm: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. .:=::-__________________
Phone

Address: _ _~~----------------~~~=_-------~=------­
S.,., City and SI.II~ 7,.
Person locontact: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _:;;::;::-_ _ _ _ __
Title
Owner: ________________________________________________~~------------------------------------
Addre<S: _ _---;;-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ =_=-,-_______--,;_______
Phone

SUl~cl City and Sllle u.


Person to comact: _________________________________::--,_______
Tule


This entry submitted by:
Name: _____________________________________________________________ T."-~----------

Title
Firm::__________________________________________~-----------------------------------
Address: _ _----;::-,----_______________________
Sln'ltt
-;;,===-______________
Ph"'"

City and Stile


-:;::~--------
lJp

(ADDITIONAL I::iNTRIES MA Y BE SUBM llTED ON COPIl-'..5 01' nils R)RM )


RETAIL CONSTRUCTION

Urban •
Transformation
An addition to a nearly half-century old
department store allowed the creation of a
modern urban mall
By Thomas A. Bouffard, P.E.
lthough City Place was

A originally designed in the


19405 as a Six-story, stand-
alone department store in down-
town Silver Spring, MD, by the
19905 it had been transformed into
a multi-tenant space. The project's
owner recognized that its size and
design were inadequate to compete
with suburban malls but was hin-
dered in any redevelopment plans
by restrictions governing the site's
density.
Fortunately, the developer re- •
quested and was ultimately
granted a zoning variance that al-
lowed an increase in site density.
The new plan called for a hori-
zontal addition to nearly double
the size of the existing center to
385,000 sq. ft. (35800 m 2), including
space for 70 retailers, a 10-screen
multiplex theater, and 85,000 sq. ft.
(7900 m 2) of office space. Compli-
cating the project, however, was
the need to integrate the old struc-
ture with the new construction
while also planning for a possible
future addition. And, to satisfy the
developer's financing arrange-
ments, the construction needed to
be completed in only 20 months
while occupancy on the upper two
levels of the existing building was
maintained.
"Our first goal was to assemble
consultants with a strong retail
background that could quickly
evaluate our proposed project and
begin to prepare a fast-track set of
Th~ two v;t!WS show both the existing center a"d the rrew addition _Photo by Air contract drawings," explained Ray •
SlI rvey Corp. Pod lasek, project manager with Pe-
trie Dierman Kughn, the McLean,
VA, based developer. "We also

26 1 Modern Steel Construction I April 1993



wanted to have a general contrac-
tor on board during the design
phase to assist with cost contro1."
Design Goals
" It was a challenge to create an
urban mall that had the look and
feel of a traditional regional mall
where land is more abundant," ex-
plained Tom Georgelas, a principal
with Anderson, Cooper, Georgelas,
the project's shell architect. "Since
the site was Ito bel fully utilized,
our design, necessarily, took on a
vertical layout."
But as designers have long
known, shoppers prefer horizontal
layouts. "We wanted to minimize
the verticality of the mall so we p0-
sitioned entries on multiple levels,
which gives the impression the
mall is lower than five floors," ex-
plained Bill Beitz, a principal with
James P. Ryan Architects and Plan-
ners, Farmington Hills, Ml, the
project's interior architects. "To im-
prove shopper circulation, we de-
signed a long atrium with limited
bridge crossings that encourages
• more foot traffic as people move
between levels and entries. Finally,
we placed the escalators at oppo-
site ends of the mall and the stair
and elevator off the main atrium."
Egress requirements became a
main design issue in developing
the interior layout of the building.
Factors such as a 2,300 seat theater
on the fifth floor, provisions for a
future eight-story addition above
the fifth floor, 300,000 sq. ft. (27900
m 2 ) of retail space, and exterior
grades sloping one-and-one-half
levels across the site all had to be
The desigllers chose a 30' x 30' bay size to maximize flexibility, illeludillg the possibility
accommodated in the design with-
of adding an office or hotel tower. The cotlstruction a/so included a covered, 32' -wide
out sacrificing the retail lease re-
pedestrian bridge that was framed at each side with coverplated W36x300 girders.
quirements.
The final design utilized the
lower four stories of the existing
concrete structure for retail space
and the upper two stories for office
space. The existing escalators were
removed and the openings were
infilled . The new construction con-
sisted of four levels of retail per-
fectly matching the existing floor-
to-floor heights and a fifth level
• theater. The theater is two-stories
high, so the roof line of the addi-
tion matched the roof line of the

Modern Steel Construction I Apn11993/27


existing structure.
Structural Considerations
"Steel was chosen as the struc-
tural system for the building be-
cause of the flexibility it offered the

design team," explained Wayne
Bryan, P.E., a pri ncipal with
Ehlert/Bryan, Inc., the project's
structural engineer. "The steel
structure allowed for long column-
free areas in the common mall, in
some cases spanning up to 70' (21.3
m). Steel also gave us the ability to
use a 30' x 30' (9.14 m x 9.14 m)
typical bay, which worked well for
both the retail and the future
tower."
Unshored composite construc-
tion utilizing ASTM A572 Grade 50
high strength steel combined with
a lateral bracing system of cross
The exterior of the ce"fer retains urban elements but also shares some design features with and eccentric K braces was used .
typical 5uburbtw malls. The design also was jnte"ded to stress the cenlers overall This system provided cost control
horizonta//ayout. while allowing the framing flexibil-
ity the architects would need to de-
sign a successful mall. The project
used a total of 373 tons of A36 steel

WHEN YOU BUY ST. LOUIS,


YOU BUY AMERICAN!
AND YOU GET: • FULL TRACEABILITY
• LOT CONTROL
• CERTIFICATIONS

Registered Head Markings on all Products from v.. -3. diameter include:
structural and machine bolts:

'" ffi
S)'!-
OJ "325

COUNTERSUNK
A-325 A·325
1YPe 1 'TYpe 3

SQUARE BUTTON
MACHINE HEAO

A·307· A A-«9 A-307. B

ST. LOUIS SCREW & BOLT COMPANY


6900 N. Broadway • St. Louis, MO 63147
(314) 389-7500 • 1-800-237-7059 • Fax (314) 389-7510
• and 1,441 tons of A572 Grade 50
steel.
MiU camber was used through-
out the project. The cambering
proved to be an effective method to
contTol dead load deflection and,
in tum, cost. Without camber the
eliminated the possibility of over
cambered beams that could affect
shear stud cover and the slab thick-
ness, which is critical for the floor
fire rating.
To meet the two-hour fire rating
requirements, a 3" (76 mm), 20
detail that would need to be ad-
dressed in ord er to allow substitu-
tion," stated Bryan. "First, we
needed to assure ourselves that th
pa ired stub arrangement over the
girders would not be adversely af-
fected. Second , that the erector
floor beam at 10' (3.05 m) on-center gage composite deck was initially could install the deck using stan-
in a typical 30' x 30' (9.14 m x 9.14 selected as the most economica l for da rd industry tolerance and still
m) bay would have been a W16x31 . the 10' (3.05 m) spans. However, mai ntain a good alignment be-
Cambering allowed a red uction to the general contTactor, Glen Con- tween the deck jOint a nd girder
a W16x26, representing a materials struction Co., Inc. of Gaithersburg, center line,l'
savings of 180 Ibs. (81.7 kg) per MD, showed that a 3W' (83 mm)
beam. The cost of mill cambering lightweight concrete topping over Pedestrian Bridge
was $0.02 per lb. or $15.60 per a 2" (51 mm) 19 gage, composite The project included a covered,
beam. This resulted in a net sav- deck would save $80,000 in con- 32'-wide (9.75 m), 9O'-long (27.4 m)
ings of $90 per beam or $90,000 for crete cost, which would more than pedestrian bridge that was framed
the entire project. The typical gird- make up for the added cost for a 19 at each side with cover plated
ers, d ue to their size and stiffness, gage deck. W36x300 girders on the floor and
did not require cambering. How- During the shop drawing phase, roof level. The girders were cam-
ever, many of the long span mem- the deck supplier suggested an al- bered 3" (76 mm).
bers were cambered up to 1 W' (32 ternate girder/ deck detail whereby Support for the bridge required
mm). the deck was continued over the tha t the new steel columns and
As the standard mill tolerance of girder. This eliminated cutti ng the footings be placed within the exist-
cambered beams is minus 0" plus deck in each bay as would be re- ing buildi ngs. The colu mns were
\11" (13 mm), typical cambers quired with the more tTaditional spliced at each level and separately
ranged from 50% to 75% of the im- deck detail. "Our review focused inserted through holes created in

• Production Control
mediate dead load deflection. This on the two main components of the the existing concrete floor . The end

Get unrivaled control over


every piece in your shop, llIlfIUlllllnrlTl ::.:...J~nlfllfnlfll 11111
every step of the way I-· tt
Pod
;"2-;:;
".... --
"• ." ""

How would you like to be able to punch a lew keys on your


La\jQOlt •
l et..: ..
.....
h .• t
•• . ..

' Ib,
-D

.... ,In
I~ ~" ~ M~I~ II~ I
computer and get instant. detailed tracking reports on the status
01 Individual pieces or entire jobs in your shop? Thafs exac1ly ,
what Struc1Ural Software's new Production Cootrol Tracking
System can do lor you. Shipping tickets, loading repo<1S and
other status repo<1S show what shop stations a piece passed
through 00 what date. who did the work, how many manhours
the work tool< and what still needs to be done to that piece. Bar
111111 /I
graphs, like the one shown, give the number and percentage of compkJtion on any piece mari<. sequence or job. The new tracking system
gives you the power to see exactty what shop work remains to finish a given piece mark. sequence or}ob. Sorted lists show individual piece
weights . assembly weights , even weight of all steel on a drawing. Production Control intorfaces wtth our Purchase Orders program 10
generate cutting lists that give you the addled capability of traCking material from the time ~' s ordered to the time it's cut. The cutting lists
show shopempioyees exac1lywhich pieces to pull, which pieces to cut lrom them and which pieces to scraporren.m to invento<y. Production
Control also works with our new Combining program to optimize your material cutting for Gvon more savings.

• For a free demo disk, call Structural Software


today at (800) 776-9118
M odern St(.'t'l Construction I Apnll 993/ 29
on only one side." As technology ing, including the lateral resistance
moves forward, spans tend to in- for the Phase II Tower, consisted
crease and material stiffness de- primarily of cross-bracing and
creases. These two factors can com- some concentric and eccentric K
bine to make vibration analysis all bracing. Bracing was located at the
the more critical. perimeter of the building to maxi-

For this project, semi-rigid con- mize tenant space planning op-
nections were used to add stiffness tions. The cross-bracing consisted
to the long-span members. The of A36 double angles connected to
connection consisted of the addi- gusset plates using 7A!"-diameter
tion of beams on the opposite size (22 mm) A325 high-strength slip
of the girder, bottom plates welded critical bolts.
to the girder, additional headed The K bracing was used as a re-
studs, and reinforcing bars within sult of the shell architects desire to
the slab. The beams were designed have one large window display per
to support 75% of the live load. bay on the public sides of the
The fifth noor of the new con- building. The K bracing consisted
struction has 10 individual audito- of A500 Grade 46 tube sections
riums for the cineplex. The noors slotted and field welded to the gus-
required four different slopes from set plates.
the back of the theater to the front
and the large theaters (60' wide or Renovation Work
of the bridge was designed with an 18.3 m) were required to have a Re-using the existing 1940s
invented stiffened seat made up of curved noor. The curved noor al- building required a substantial ren-
wide nange members. Full pene- lows the seating to be set on a ra- ovation. The building was a tradi-
tration moment welds between the dius improving the sightlines to tional cast-in-place concrete struc-
W36 girders and end column pro- the screen. ture framed with one-way concrete


vided the mechanism to resist the Various framing schemes were pan joists and girders. The new ar-
eccentric support. This support investigated but the tried-and-true chitectural plan called for expand-
was fixed to the column using a approach of unshored composite ing the loading dock by two bays,
traditional rocker plate pintle con- structural steel was selected. [nfill installing escalators at each level,
nection. The opposite end of the beams were placed across the adding a new freight elevator and
bridge was supported on free- width of the auditorium at the lo- adding a 4,800-sq.-ft. (446 m 2) me-
standing concrete columns with an cations of changes in the noor chanical penthouse on the existing
expansion joint at the adjoining slope. roof.
parking structure. In the smaller theaters, the noor Two bays of concrete framing
The bridge, due to its size and construction consisted of 31,4" (83 on each level were removed to
location, required a substantial mm) lightweight concrete fill over allow for the escalators and new
amount of pre-planning. Erection 2" (51 mm) metal deck. Infill beams noor framing. Structural steel was
of the bridge would require the were spaced at a maximum of 10' used to frame out each area to sup-
closing of a major downtown street (3.05 m) on center. In the large the- port the perimeter of the existing
for three days. The 6O-mile (96.6 aters with the radial seating, the concrete noor. The trickiest part of
km) travel path from the fabricator same framing scheme was used; the construction was drilling the
to the site had to be carefully se- however, the thickness of the con- existing concrete for the expansion
lected since the W36 girders were crete fill varied to maintain the bolts. Due to the age of the struc-
being shipped full length. The curved noor contours. The noor ture, the concrete was extremely
girders had to be properly oriented slopes were framed by placing the hard and difficult to drill. Standard
on the trucks to be ready for the beams at the chord of the arc of the impact rotary hammers were inef-
lifting as the street was not wide slope changes. This system proved fective in drilling the 25 mm holes.
enough to reposition the steel. to be an ideal way to solve this The erector found success by using
framing condition. A sophisticated a water-cooled, diamond-tipped
Serviceability
table of dimensions keyed to a typ- drill.
"Based on our retail experience, ical plan and elevation was devel-
we have learned that some of the oped to provide the necessary in- Thomas A. Bouffard, P.E., is a proj-
longer beam and girder spans, 50' formation to the detailer and ect engineer with Ehlert/Bryall , IIIC., a


(15.2 m) and over, can be suscepti- contractor. structural ellgineerillg firm with of-
ble to vibration problems," ex- fices in McLean, V A and Southfield,
plained Bryan. "Specifically, long Lateral Stability MI.
span beams that frame into girders The lateral stability of the build-

30 I Modern Steel Construction I April 1993


AISC ANNOUNCES
VOLUME II CONNECTIONS MANUAL
ASDjLRFD

• Volume /I Connections
is a companion and
extension to the AISC
Manual of Steel
Construction (both LRFD.
1st Edition. and ASD. 9th • Covers bolted
Edition). and welded
shear. moment.
and bracing
• Contains examples
and information on steel connections in
connections not published applications not
anywhere else. treated in either
the ASD or LRFD
Manual of steel
• Has practical and
economical examples of Construction.
complex connection
designs in both LRFD • FREE BONUSI
and ASD. An updated copy
of the AISC Code
of Standard
• Based on the latest
AISC LRFD and ASD Practice will be
specifications. sent with each
book.

704 PAGES -- ONLY $60.00 -- ORDER YOUR COPY TODAY!

YES! I must have Volume II Connections. Return to:


AISC Connectlons Offer
Send me _ _ copies at only $60 each. PO Box 806276
Name/TItle _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ Chlcago.IL 60680-4124
Company _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___

Address _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ Phone Orders


312/670-2400 X433
City/State/Zlp _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___ FAX Orders
Phone _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___ 312/670-5403
;:; Check enclosed o Charge my 0 Visa 0 MasterCord
Please enclose remittance.
Acctl _ _ _ _ _ _ _ _ _ _ _Expires _ _ No COD olders. Add S5 for UPS
25 ~. DISCOUNT
FOR AISC MEMBERS Signature chorge. Foreign olders: SID
minlnum for shipping

RETAil CONSTRUCTION

Attracting
Attention

To survive in Las Vegas, an old retail
center had to expand and create anew,
bolder image for itself
s Las Vegas has become

A glitzier, more modest retail


operations have had to up-
grade to compete for business. De-
spite its prime location across from
the Stardust Hotel on "The Strip:'
the small retail center and an adja-
cent 1950s-style motel on the Gold
Key site had faUen on hard times.
After careful consideration, the
developer opted to demolish the
motel and replace it with new re-
tail space which would be com-
bined with the existing stores to
form a new retail complex. •
"The existing retail building was
fairly old and had been tacked on
to and renovated in a piecemeal
fashion," explained Raul Anziani, a
project architect with ELS/ Elbasani
& Logan Architects, Berkeley, CA.
'1t had stucco, wood and metal fin-
ishes with no rhyme or reason to
the design- there was no unifor-
mity." Structurally, most of the ex-
isting building was steel framed
with concrete block or wood infill
for partition walls.
The new plan was to build an
addition to increase the rentable
space from about 25,000 sq. ft. to
54,000 sq. ft. (2325 m 2 - 5020 m 2)
while at the same time recladding
the old building to create a uni-
form image. And, befitting its loca-
tion, the image chosen was loud.
The en tire cen ter is clad in
multi-colored metal panels-silver,
gray, green and chrome. And even
' ,= i~~' ... though the center is essentially a
". ..
. . .
". single story, the designers chose to
extend the cladding up an addi-
Before and after: The old utller lWS run-dount and could not compete with newer LAs tional story. "When you' re doing a •
Vegas Ceuters. The tlew center IS designed to attract attention . retail project, there's always a de-
Filllshed photography by Timothy Hursley sire on the part of the client to

32 1 Modern Steel Construction I April 1993


..

make it stand out as much as possi- tends twice that height- and it
ble and to attract attention," said needed to be supported on cantile-
Donn Logan, FAIA, a principal vered W12x40 steel columns. Gen-
with ELS. "Las Vegas is a place eral contractor on the project was
where you can transcend the genre Taylor International Corp., Las
to where garishness becomes art." Vegas.


Towards that end, the panels jut "The wood diaphragm holds the
out here and there and rise up to structure together, but lateral loads
different elevations. "There's an are picked up by K braces spaced
angularity to the site itself since approximately 100' (30.5 m) apart
one of the adjacent streets is an- along the 300' (91.4 m) length of
gled," Logan said. "This design is the structure," Khoury explained.
reflective of its site and location." In addition, there is a row of steel
And topping it off is a series of beams at both the roof level and at
both free-standing and attached the top of the columns.
trellises and canopies. "Besides at- The beam line at the roof level
tracting attention, they also pro- are W14x22 wide flange sections,
vided shade, which was very im- while 6x4xV4 tube shapes were
portant in Las Vegas' climate," used at the top of the structure.
Anziani explained. As Las Vegas "We used tubes for the top beam
becomes more of a family vacation line because they are exposed in Duri"g ti,e day. the trellises a"d canop'es
destination, pedestrian traffic has SOme places," Khoury said. Clip provide shade, while at 1/;Sl1t they act as
increased, so this structure is much angles are welded to the tube and brig/It beacons to attract atteution to tlte
more pedestrian oriented than then bolted to the wide flange col- site. Both the trellises and canop'es are
older Las Vegas buildings. umns on the top and bottom. supported 011 steel members that were left
Of course, supporting all of the Several large trellises, some of exposed to create VISIIa I interest.
cladding and ancillary structures which are as much as SO' (15.2 m) Photos by Timothy Hll rslry.
effected the structural design. high, are free standing and are sup-
The new structure is steel ported on tube columns. To further
framed with a wood joist roof, ac- enhance the structure's angularity,
cording to Raymond Khoury, S.E., cut and bent wide flange sections
a structural engineer with Martin were used to support the trellises'
& Peltyn Structural Engineers, Las metal roofs. The tube columns
Vegas. "Because of the high facade, range from 5x5x:}l4 to 12x12x\lz. The


wind governed the design," he shading material at the top of the
said. While the building's roof line trellis is supported on T-shapes cut
is approximately 15' (4.57 m) high, from W2lx44.
in some places the parapet wall ex-

Modern Stt..'C1 onslructlon I April 1993/33


Australia
Rediscovers Steel

An aesthetically intricate building provided a toe-hold for
steel to penetrate a concrete stronghold
By Leonard M. Joseph and
Thomas Z. Scarangello

W
hy would engineers in
very English, very mod-
ern Australia look to the
United States for technical exper-
tise? There's a one-word answer:
Steel.
During the past few decades,
straight-sided, flat-topped concrete
towers have become nearly univer-
sal for Australian commercial con-
struction. Steel construction was
generally limited to heavy indus-
trial appHcations such as ore load-
ers or mills.
But rather than building another •
box-like building, the developer of
The Chifley Square Building in
Sydney favored a highly articu-
lated building design by architects
Kohn Pederson Fox of New York
and Travis Partners, Ltd . of Syd-
ney. And in another departure
from the "Australian-norm", the
developer had no preconceived no-
tions about structural framing sys-
tems.
Thornton-Tomasetti/ Engineers
was brought into the design pro-
cess for this new high-rise office
tower by Flack + Kurtz AustraHa
Pty. Ltd., a structural / MEP engi-
neering design firm, to study alter-
native highrise structural systems
and develop the wind resisting sys-
tem. This included the opportunity
to give steel framing another look.
Steel offered three potential advan-
tages: speedy erection, easy cabling
access, and cost savings.
Erection Speed. Based on US ex-
perience, steel frame erection at a
rate of two floors a week or better
The Chifley Sqllare BlIildillg facade is higllly articlllated to help create a trallsitioll from was anticipated, excluding start-up •
the local street front titles to the overall city grid, while also e,,}lQlIcillg views of Sydney and non-typical floors . High-rise
Harbour. concrete construction in Sydney

34 J Mooern Steel Constructio n I April 1993


'"
' '1

usually proceeds at about one floor


a week and was subject to delays
from bad weather. While some up-
• front time would be needed to fab-
ricate the first tiers of steel, that
time would be quickly made up for
on a building of this height (43
numbered floors above grade,
equivalent to about 50 stories). Al-
though financial and weather con-
ditions caused some delays on this
project, steel erection was able to
proceed whenever there was a
break in the weather. In contrast,
the rainiest winter in recent mem-
ory would have severely slowed
concrete work more, causing de-
lays at all points in the construc-
tion cycle-lathing, forming, plac-
ing and stripping.
Cabling Access. The owner en-
visioned The Chifley Square Build-
ing as home for financial and trad-
ing firms capitalizing on
Australia's Pacific Rim location The frrlll s!er truss
and western European cultural pictured alxnlf;s
background. Three or four comput- located at 0>1. of til.
ers per trader, and 50 trading sta- many setbacks It.'ith
tions or more per floor, made cable a view of tire fallled
management a critical concern. Syd>ley Opera
• On each level raised "computer HOllse alld Syd>ley
flooring" gave cabling flexibility, Harbour , The core
but adequate riser space and access colllmlls shown at
was also needed between floors. left I.."e bracillg
While cable riser space can be pro- gussets with
vided in cores of both concrete- extended boltom
framed and steel-framed buildings, plates for .ase of
access to risers differs. The "clas- erection . Note tlrat
sic" Sydney high-rise has concrete the bracmg
walls for shafts and shear resis- com,retio" plates
tance. Making post-construction stop silort of the
openings is noisy, messy, costly, coilmm face. Also,
and subject to structural limita- l10te the narrow rib
tions. However, a steel-framed deck.
core, with lateral bracing in the
form of diagonal members and
shaft walls in gypsum board, can
accommodate new openings
quickly, easily and inexpensively.

Construction Cost. Unlike the


U.S. with its multiple steel suppli-
ers, concurrent steel demand in
other sectors of the economy could
have been significant in Australia
since there is a limited pool of
labor and materials in that country .
Demand that outstrips domestic
• supply may Simply go unfilled-
an unacceptable situation for con-
struction of a building with high

Modern Steel Construction I April 1993 / 35


to cover vertical load mInImums
and maximums, and wind from all
directions. Appropriate member .
sizes were then selected from a
menu of possibilities, including
many "do-it-yourself" sections that
are a necessary part of working in
an area with limited standard sec-
tions.
Presenting member sizes and
forces on plots was straightfor-
ward, but one interesting twist was
determining the force to be trans-
ferred throllgh the core columns.
This was necessary because the col-
umns were built up of three to
eight plates, and plate prying could
be critical. The forces were deter-
mined by checking equilibrium
joint by joint for each individual
load case and combination.
As the architecture was being
refined, significant changes in
building shape and framing geom-
etry required reanalysis and rede-
carrying costs, but fortunately sion used a "virtual couple" and sign. The automated analYSiS, de-
sluggish industrial demand at the wind loads offset from the center sign and presentation process
time of design meant that such a of stiffness. For each direction, the permitted the last (lSth) redesign,
situation would not occur. contribution of each member to the for a large rooftop penthouse to ac-
point of interest was determined. commodate profitable microwave
Building Design Members were ranked by rela- transmitters, to be performed in .
The Chifley Square Building has tive efficiency (contribution per just two days.
a very compact core, T-shaped on unit volume of the member), and
lower levels and L-shaped above. the deflection for the trial member Special Considerations
This maximizes net rentable space layout was compared to the target "Down Under"
on the floors, but is too slender for deflection. If deflection was greater Australia's steel supplier, BHP
adequate lateral stiffness. than target, the helpful effect of in- Ltd., offered steel in two grades for
To improve lateral stiffness, out- creasing the most efficient member construction use-250 MPa yield
riggers at three levels engage two was considered. ote that member (equivalent to grade 36) and 3SO
outrigger columns on each build- efficiency drops as material is MPa yield (equivalent to grade SO).
ing face. This core-and-outrigger added, so efficiency was continu- As the forces and proportions of
system has two advantages: It per- ally checked and lower-rated mem- members were to be similar to
mits a highly articulated facade, bers were increased when they those in US practice, these grades
with curves, setbacks, notches and came 'lin the running." were a ppropria teo
overhangs which would have been Upper limits for member sizes Material supply also was a prob-
impractical with a perimeter tube were also established and checked. lem. Due to the relatively small
or frame system, and it uses some Since changing member sizes in an size of the Australian economy, the
of the outriggers for double duty as indeterminate structure changes limited number of potential suppli-
pickup trusses at setbacks. How- force patterns, the analyses were ers (one) and the tendency (also
ever, design of this very complex 3- automatically re-run with new trial observed in the US) to minimize
dimensional structural system re- sizes, subject to minimum sizes for stock in steel supply warehouses,
quired extra engineering effort. strength, until convergence was virtually all steel for this project
For deflection control, steel was reached . Optimization was done was mill ordered .
located at the optimum, or most ef- round-robin for the X- and Y-direc- [n addition :
ficient, locations. Relative member tions, and then for torsion . • Lower floor columns required
efficiency was determined using Once "optimized" sizes were large, thick plates which were
virtual work. For each direction of determined, a final analysis set the rolled infrequently.
interest we applied a virtual load at design forces. Member strengths, • Lead times for mill orders re-
a point of interest - usually the top as established by the Australian quired ordering before com ple- •
occupied floor - and lateral wind code, were checked against an en- tion of design .
forces over the tower height. Tor- velope of wind and gravity forces • The range of standard rolled

36 1 Modern Steel Construction I April 1993


The basement core column shawl! above is built up from sewn plates, while the split
coilimlls shown at right straddl. a sidewalk arcade below.

shapes available (wideflange, defined. umns, they can usually be made


channel, angle) is much more • "Oversizing" typical floor beams as an I or box from three or four
limited than in the US. The hand- (compared to U.S. practice) due plates of 6" to 12" thickness.
ful of standard shapes are limited to the limited range of beam Using 3.9" plates required inge-
to a series of steadily increasing sizes. For example, an unshored nuity to address the needs of fab-


sizes and weights, which may composite 45' floor beam in the rication, erection and force trans-
work for industrial use but ig- U.s. might be a W21 x44, but the fer through sections built from
nores the different needs of nearest equivalent in Australia six to eight plates.
beams and columns. was a 530 UB 82 (W24x55). This • Making base plates from 300 mm
• Plate stock is supplied as slabs, extra weight was not wasted, thick by 1800 mm square cast
and in only a few lengths and however. Additional live load ca- steel slabs. This approach had a
widths. pacity was inexpensively made material cost premium and re-
• Plate stock thicknesses vary in available by an extra bolt added quired careful quality control
large steps. to beam end connections. and assurance but was still more
• Plate is not available thicker than • Setting shipping lengths and economical than alternatives of
100 mm (3.9"). splice elevations to work with as- stacked or stiffened 100mm
Due to these limitations, some shipped slab lengths (minus mill- rolled plates.
premjums were paid to ensure ing allowances). While the result-
construction speed . Solutions in- ing splice locations may not have Slab construction
cluded : been as convenient as the usual 2' The standard deck profile is 50
• Pre-ordering stock in advance of to 4' above the deck, the wastage mm (2"), which limits spans to
the design. By ordering a selec- avoided was worth it. about 10', and has "dovetail" or
tion of plate we "mixed and • Designing plate widths to work "keystone" ribs with wide flats of
matched" during design to mini- with as- hipped slab widths maximum slab depth, requiring
mize waste. (minus trim and cutting allow- more concrete fill than a typical US
• Ordering 350 MPa stock even ances). pattern and boosting slab dead
though much of the heavier steel • Designing custom built-up sec- load from the 45-50 psf typical for
would be deflection-controlled tions for the many members be- stone concrete in the U.S. to about
and could be 250 MPa material. yond the range of available hot 65 psf. Lightweight expanded-
This simplified ordering, stock- rolled sections. This included shale aggregate was not a practical
ing and tracking material in the most tower column sections, choice.
"mix and match" process. girder sections and wind bracing
load criteria


• Determining the range of likeliest sections.
member sizes and lengths for • Building up ections from multi- u.s. office floors have 50 psf live
rolled sections, and ordering just ple 100mm plates. While built-up load, reduced to as low as 20 psf at
enough over length pieces to get sections are commonly required columns. The Australian code calls
going until the design was better in the U.s. for lower-tier core col- for a 3 kPa live load, equivalent to

Modem Steel onstruction I Apnll993/ 37


• 1

63 psi. reduced to about 31 psf at •


columns, about 55% greater than
typical U.s. practice.
Australian code wind loading
includes the innuence of wind di-
rectionality, relative probability of
occurrence in different directions
and recognition of wind tunnel
testing. In these aspects it is ahead
of the various "model codes" in the
U.s. and way ahead of the older
municipal codes.
Seismic loading was not consid-
ered in Australian codes until the
recent Newcastle earthquake. Code
provisions have since been devel-
oped.
End connections
One interesting difference in
steel detailing practice is in the ap-
proach to seated connections. In
the U.S., seated connections are
usually designed for a beam bear-
ing length sufficient to accommo-
date a plain beam end without web
crippling, plus construction toler-
ances. This gives a deep seat which
imposes some bending in the col- •
umn.
In Australia we have seen the
popularity of minimum-depth
seats which use beam end plates to
bear on seats of single plates
welded nat to columns. This ap-
proach minimizes eccentricity of
applied load and eliminates any
concern for beam crippling failure .
Beam fabrication is increased but
seat fabrication is Simpler. We be-
lieve that their approach has possi-
ble application here for heavy reac-
tion situations.
Steel construction prOVided sig-
nificant benefits in schedule, cost
and user nexibility for The Chiney
Tile nor,II view of tile tower shows the munerolls setbacks and changes i" plane 011 tire
Square Building, even in a tradi-
blll/ding's east mId ,,",st faces. tional stronghold of concrete con-
struction where limited shapes and
plate stock required the time-con-
suming design and construction of
many elaborate built-up shapes to
accommodate the needs of tall
building framing.

Leollard M. Joseph alld Thomas Z.


Scarallgel/o are sellior associates with .
TllOm/oll -Tomasetti/Ellgilleers ill New
York City.

38/ Modern Steel Construction I April 1993


~~~1~~;s A/E/C SYSTEMS®'93
on/erence June 7-10 Exhibit June 8-10 Anaheim, California US.A.
All you need to stay (omputer literate -
all in one pla(e, all at one time .

HIGHLIGHTS FOR ENGINEERS ·


• A CE spollsored cOllferellce For (omplete
011 '·Computing ill Civil information
alld Building Engilleerillg"
• Dozens of other sessions £l
(all
1-800-451-1196
-•
engineersl!!!: engineers
I-203-666-6097
• Hlmdreds of special com-
or fax to
JiJIJ~ r applicatiollsfor
_ weers I-203-666-4782
Th e show for pn·vate practice, Call today
and govemment engineers for greatest
in volved with computers. discounts

W E L 0 N G PRO 0 U C T S

(MIG), FCA W (Innershield or Out-


Welding ershield electrodes), SMAW, •
GTAW (TIG with scratch start,
Exposition K799 Hi-Freq Kit, or OC TIG
starter) and Air Carbon Cutting.

M ore than 20,ooo attendees


are expected at the 1993
AWS International Welding Expo-
For more information, request
Bulletin E390 from: The Lincoln
Electric Company, 22801 St. Clair
sition and 74th Convention sched- Ave., Cleveland, OH 44117-1199
uled for April 27-29 in Houston. (216) 481-8100.
The technical program will include
more than 25 sessions with more
than 100 technical papers. Topics
range from computer modeling to
Stud Welding
Programmed Automated Welding
Systems to welding inverter power
supplies. Highlighting the conven-
N elson studs literally anchor
other members to the basic
framework of structures. This de-
tion are industrial technology ses- sign makes for maximum strength
sions concentrating on improving since the welds are actually
productivity and applying new
technology. In addition, a session
Cutting Torch stronger than the base metal. Since
stud welding is at least three to
on ventilation will address upcom-
ing OSHA requirements. Also, a
thennal spray symposium will be
T he Henrob 2000's unique low-
pressure/ low-velocity flame
equates to dramatically reduced
four times faster than hand weld-
ing, it impressively reduces total
man hours on a job. At the same
held. gas consumption, permitting ex- time, stud welding does away with
For more information, contact: tensive use in the field with mini- all the problems associated with
American Welding Society, 550 mally sized gas bottles. Its twin-tip holes in structural members, such
N.W. Lejeune Road, P.O. box cutting design permits easy cutting as a weakening of the main frame
351040, Miami, FL 33135 (BOO) 443- of structural steel up to 1" thick and the need to seal holes to pre-
9353; Fax (305) 443-7559. with minimum kerf and clean, vent leaks. In some types of con- .
non-oxidized edges. The torch also struction-especially composite
can be used to weld difficult mate- construction-further savings re-
rials such as aluminum, stainless sult from the use of lighter and less
steel and cast iron, can braze with- costly beams that also reduce a
Welding out flux, cut thin-sheet materials
with minimum distortion and
building's height and weight.
For more information, contact:
Equipment without burning back galvanized
coatings.
TRW elson Stud Welding Divi-
sion, P.O. Box 4019, 7900 West

B urco has introduced a new


line of welding equipment
specificaJly designed for mainte-
For more information, contact:
Henrob Corporation, 3551 Voyager
St., Suite 106, Torrance, CA 90503
Ridge Road, Elyria, OH 44036 (216)
329~;Fax(216)329.Q526 .

nance and repair applications. (310) 214-4946; Fax (310) 542-5184.


These applications demand power Power
and portability. For example, the
newly introduced 130 ST weighs Power Source Supplies
only 22 Ibs. yet has a 100% duty
cycle rating at 105 amps. The com-
pany also produces a fuJI line of
plasma and MIG welders and a
T he Lincoln Electric Company
has introduced the Invertec
V300-PRO, an advanced technolog-
A new welding power supply
system from AFTEK offers all
standard constant current welding
unique AC / OC portable TIG unit, ical source for stick and wire weld- processes: SMA W (stick electrode);
as well as its standard line of arc ing. It is a 300 amp arc welding GTAW (TIG); Submerged Arc; Air
welding, stud welding, engine power source that utilizes single Arc Gouging; and GMAW (hard
drives and consumables. phase (KI349-3 only) or three wire MIG all positions) . Features
For more information, contact: phase input power to produce ei- include: 100% continuous duty
BUR 0 Welding & Cutting Prod- ther constant current or constant (400A-24 arc volts; 65OA-32 arc
ucts, Inc., Box 2115, Burlington, NC voltage outputs. It is lighter in volts; loooA-42 arc volts); adjusta-
27216 (919) 227-2737; (919) 228- weight than previous generations, ble amperage range in SA imple-
0760. making it ideal for jobs that require ments (5A-445A; 5A-745A; 5A- .
portability, such as construction. It 1245A); standard input voltages
is recommended for GMA W

40 I Modern Steel Construction I April 1993


(230 / 460 / 575 - 3PH - 60Hz; 220 1079, Appleton, WI 54912 (BOO) which also sells plasma cutting
• / 380 / 440 - 3PH - SOHz; 380 / 400 950-9353. tools, has entered into a marketing
/ 415 - 3PH - SOHz); thermostati- agreement with Kemppi to sell
cally controlled alarms on rectifier their product line of inverters in
to automatically shut-down power the U.S.
source in case of overheating; units MIG Welding For more information, contact:
can be paralleled together for PowCon Inc., 8123 Miralani Dr.,
higher amperage output; units are
stackable for maximum power in
Gun San Diego, CA 92126 (BOO) 833-
9353.
minimal space; and three year war-
ranty on power transformers, recti-
fiers, and current control resistors.
B ernard Welding Equipment
Co. has announced the avail-
ability of its new "Q" Gun Series,
For more information, contact: an advanced MIG welding gun
AFrEK, Inc., 1023 Pineville Road, with three basic models: 500 Amp
Chatanooga, T 37405 (BOO) 742- MIG gun; 3SO Amp MIG gun; and
5458. 200 Amp M1G gun. In addition to
exceeding the features included in
most other MIG guns, this new
generation of easy-to..handle,
higher performance guns will pro..
vide users with consistent, high-
quality welding performance, in-
cluding less waste, simplified
access, and easier operator han-
dling. Dramatically new "jump
liner" technology makes it possible
to reduce liner costs by as much as
65%. In addition, a new 6" long
jump liner enables the welder to re-
place the body tube liner without

Power Source
having to change the gun liner. The
series also offers seven new heavy MIG Wire
duty, two..piece, spatter resistant
B uilt for rugged use at COn-
struction sites, the Miller XMT
copper nozzles, as well as inter- Feeder
changeability with a broad range
Rack product line has been ex- M.K. Products ha introdu ed a
of EZ Feed lJ nozzles.
panded to include a second eight For a free information package, new integrated power supply and
Pak and a new four Pak model. push-pull wire feeder, with capa-
contact: Bernard Welding Equip-
While the original XMT 8 Pak Rack ment Co., P.O. box 667, Beecher, IL bilities of welding up to SO'. The
was designed for operation on 230 60401 (BOO) 323-8768; Fax (708) 946- CobraMIG 250 welding package
VAC or 460 VAC power, the new 8 includes a self-contained 2SO amp
6726.
Pak Rack operates on 460 VAC or CV, push-pull combination power
575 VAC primary power. The new supply and MIG wire feeder. The
4 Pak Rack is designed for 230 or unit comes fully assembled and,
460 VAC primary power operation.
With eight 300 amp power sup-
Inverters after unpacking, can be up and
running within 15 minutes. It has
plies and 40 amps of auxiliary
power, XMT 8 Pak Racks weight
just 1,700 Ibs. Four 300 amp power
P 0wCon's inverter welding
power sources allows up to
75% reductions in size and weight
excellent short and spray arc char-
acteristics and no spatter. It's foun-
dation is a rugged, all-steel rolling
supplies bring the weight of the of the transformer and up to 45% cart with cylinder rack. Three op-
XMT 4 Pak Rack to just BOO Ibs. All energy savings as compared to tional kits further increase flexibil-
of the models have a compact 63" SMAW or GTAW power upplies. ity: remote voltage kit with 25'
wide x 40" deep footprint and Can When combined with an engi- cable and 25' extension; digital
be easily transported from job site neered plastic hOUSing, the result is meter kit; and a stitch / timer kit.
to job site. Fork lift access is pro.. a power source that weighs only For more information, contact:
vided on all sides, as well as a cen- one-third that of a conventional M.K. Products, Inc., 16882 Arm-
• tral eye for crane movement. transformer and takes up signifi- strong Av., Lrvine, CA 92714 (714)
For free literature, contact: cantly less floor space, yet provides 863-1234; Fax (714) 474-1428.
Miller Electric Mfg. Co., P.O. box the same power output. PowCon,

Modern Stt.'Cl ConstructIon I April 1993/ 41


STEEL MARKETPLACE
STEEL SHAPING SPECIALISTS Ram Analysis Steel Design Software
WE CAN BEND STRUCTURAL STEEL: THE EASY WAY, THE Now. get SBEAM by Ram Analysis ror only $100. Full reaturc.
compofliteinon-composite single beam desi~ 8.nd analysis software (LRF
HARD WAY, IRREGULAR CURVES, OFFSETS, ELLIPTICAL or ASO). E8Sy-t.o-U8e With Windows graphIcal mterface. Full 90 day money
SHAPES, CIRCLES, SETMENTS WITH TANGENTS AND AND WE back guarantee.
CAN BEND IT TO TIGHT RADII WITH MINIMAL DISTORTION. Also available. t.he RAMSTEEL Integrated Structural Software System.
Fully integrated analysis, des ign and draning or steel beams, joi8t.8.
We also offer forging. the hOI shaping of melals and the roiling and forming of columns, and baseplates
rubing. rail and bars. Call or Fax Frank Huttsrsr for more InformatIOn. Ram Analysis
Telephone 414-355-8220 FAX 414-355-4698 5315 Avenlda EnCinas, Suite M, Carlsbad, CA 92008
MAX WEISS CO., INC. 8625 W. Bradley Rd., Milwaukee, WI 53224
Phone: 8001726-7789
Fax orders: 6191726-7789
Kelp Wanted - Structural Engineer You'll be a.m.Qed at what you can draw from our e.perlence:
CADVlSIONS hili beoen proVldlngCAD..,lutlOfll ror ttw A'EIC mdWltry'lnce 1989.
Con.ullln, [ngmeen", Finn IIHU Slnlctura1 Engtneer to eng. In C'OfICf'ete dKlgll. by offennl adya~ .oftwa", and hardware producta. IW:rvKe. IUpport and proreulonal
both mildly J't'lnforred and plfl'treued; retlponllble for llinoua pro,J«U InvolvlnK demgn trammlJ Our product.a proVIde the bHt CAD IIOlutM>na ror an:h,l.«Ui, enlJlnC'ers.
or multl-.tory relfl(o~ concrete and 1t.eeI.lructUl'ft; delLgn poal·U!.n'loned nat plate fabncators and df'lallers
'lructun; loed Leal. repair and .tre:ngthemng of mulu ..tory pMl.teMlOfIed tl8t plate
.tturtun.; poIIl-tenllOnC'd foundatIOn dl!llJgn; "",norm .Iab analy.i. by finite element •• .. •••• .. • ..... •• ...... • .. •••• .. ·Authon~ dealers ror:····· .. •••• .. •••• .. • .... •••••••
Software Platten
method, u.t MICAS and ETABS to J)l!rfonn ,lJIllC and dynamiC Ilructural.naJYSII and AutoCAD tA utode.k. ) NovaJET
dC!llgn and ADAYr to deelgn p~treued contl'Me .lructure._ RequlN' bachelor of AuloDetllgn (SAT ) ProTRACER
ICIt'nce dejp'H In cIvIl or structural engmeenng Re<tulre one yea r expenence In job Dellgn Companion (Woodbourne ) OJlJltlle... ·
offered or one yur I!Itpenence in related ooropatlon In .trud.ural detllgnfconltruelion. Storephm (Gra phIC BY'lema) GTCO Uhlma
IWqUlroe one rradua~ OOW"8e Ul reinforcement COncn!~ repalr ....d .trength and one Softdetlk !.truct.ural, mech. , an:h .• civill GTCO RoII·U.,.
gnduate OOUnte In Itabih ty oratructUJ"N. $31,197.05 per ~ar, rorty hour work week. Power 486 Worbt./ltlon. OenCADD ProduC1.l
trquallfi~.lIpply at the Texa. Employment Commltllion, Dalltl •• Teu •• J .O. ~7876 -rREE DEMO DlSKAVAILABLE UPON REQUEST-
or send roe.ume to the Texaa Employment Co mrnlMlon, TEC BUilding. AUitin. TeJ:aa CADVIS IONS
78778. JO '667876. Ad paid by an equal emp1c)yment opportunity employer 2200 N t..lNlr, SUite 104, Dall... Tex.u 76202
(214)720-2023, FAX (214) 720-0617

Help Wanted - Structurel Engineer


!'ilruduW EIlIJUIeenJ\fC Service. FInn _It. St..rurtural EI1FOHr 14 ~rfonn It:ructurai
lIlnt.ntt olpt.u and Itrudurn mvoIYlll'~.IlePI ....d muonryconltturtloo;
pertK:lptlt~ In plannUl,. dellign aod ~ or pi ..... ror e~on of Itructurn re<Julnn, Advertiser's Index
.treN anal)'lll'; utlh", oomputer BIIlated I'ngUlMn"IJ and dealgfl dOC"tlmenti Ullng
ETABS. SAl-'E. SAPOO. E!\'ERCALC and other frame and fimte element computer
IUftwan pl'O(famt; ukulat.e a:.u ....d det.ernune fe_b,hly of pro)K't.l bMed on A/ E/ CSystems ..................................................... 39
.....1,.11 of 1'01Ien.ed data appl)'!n, knowledp and lft'hnlqUM of OYlI engln~nIJ and
~v8flC:'@d matham&hCB. Reqwre M..~r d~ 10 ~vlll'ngUleenna JUoqulre.1.II monu.. AISC Connections Manual .................................. 31
e.penen<'t'ln the JOb offered or IllI month. expenenCt! in the reillte-d OttUplltlon or
leachmlJ UlI.tant. CIvil engrneenng JUoqUlre advanct' course in po.t·tenllion tendons . AISCSoftware .................................................... CII I
• trurtural.y"tem. and rontmuum meehanK"' &31.876.30 per .nnum; rorty hour work


w...
Apply at the Te.aa Employment Commililon, Dallu. Te..... J.O . • 6681881 or send
resume to the Texal Employment Commllllion. TEC BUilding. Austm. Texaa 78778, J .O. Nicholas J. Bouras ............................................... C II
6687881 . Ad pIIld by Itn eqU1l1 employment opportunity employe r

Chaparral Steel ........................................................ 3


Free Software Catalog
For Structural Steel Detailers & Fabricators Computers & Structures, Inc............................ ClV
Quality· Affordable - PC Sotl.ware
Steel Detailing Wllh or w/out a CAD )nterface, 10 integrated calculator
rograms designed for detailers & checkers, Job est.imates, bills of materials, Design Data .............................................................. 7
r.
ength culbng lists. shipping lists & nesllng. residential and light
oommemalstructural detllgn, analYSIS Ofoonlmuous beams {steel, wood or
concrete}, finite elementanalysi8. project management. accounting MDX........................................................................ 15
NES, Inc., P.O. 80x 2014, EI Segundo, CA 90245
800-637-16n (phone) - 310-546-7158 (fax)
Nucor Fastener ... ,........... ,...................... ,................. 8

Engineering Journal Omnitech ................................................................ 17


The only technical magazine in the United Stale8 devoted exclu-
sively to the design of steel structures, the AISC Engineering RISA Technologies ................................................ 15
Journal provides structural engi neers, architects, fabricators and
educators with the latest information on steel dC8ign , research , Researc h Engineers .................................... ,............ 5
and construction.
For a one-year, U.S. subscri ption, send $15 to: SI. Louis Screw & Bolt .......................................... 28
American Institute of Steel Constructlon,lnc. (312) 670-2400
P.O. Box 806276 Steel Bridge Awards ........................................ 24-25
Chicago,lL 60680-4124 Steel Joist Institute ................................................. 11
Structural Software Co ......................................... 29
CLASSIFIED ADS
Whilefab ................................................................. 17
Reach 35.000 engineers, fabricators, architects, contractors,
bridge officials and building owners inexpensively with a
classified advertisemcnt in Modern Steel onstruction. It's fast Vuleraft .............................................................. 22-23
and easy-we'll even do the typesetting for you at no charge.

For rate and placement information, call:


Greg Poland at (708) 679-1100.
Or (ax him a note at (708) 679·5926.

42 1 Modern Steel Construction I April 1993



....
.{)
STRUCTURAL STEEL DESIGN
SOFTWARE 7900

FROM AISC
61 10

11 2
F.ctored Moment Envelope

CONXPRT ELRFD
A knowledge-based. menu.<Jri- A new sophisticated program
ven PC software system for for interactively checking
the design of comections in structural steel building
steel framed buildings. All components for compliance
strength limit states are with AISC specification.
checked and expert advice Checks whether member
from long-time fabricator engi- satisfies all limit states and
neers is used to augment the limitauon requirements set by
design rules. the LRFD Specification and
• Generates cope sizes. allows reports which sections are
bolt stagger and permits satisfied or violated.
diNerent bolt diameters for • Review in detail the formulas
shop and field Use and rules used in the
• Designs can be stored on evaluation and interactively
disk, allowing electroric WEBOPEN assess any mathematical
communication between Designed to enable engineers expression on the screen.
design parties.
• Generates complete reports
to quickly and economically
design beam web openings. lIIOITJ • Fully interactive MS Windows·
based user intertace.
showing details and strength Uses state of the art criteria • Disk includes ELRFD
for each limit state checked. and features a clear and logi-
cal data entry system with
1110 il ChecklBrowser, AISC
Structural Shapes Database
3- fl2" or 5·114" disk
MODULE I:
SHEAR CONNECTIONS
easy-to·use color coded input
windows. Wrinen by practicing
engineers for engineers, incor·
8Iorn and sample problems
• User Guide and Reference
1st edition LRFD
Version 1.02
9th ediuon ASD
$300 porating expert design checks
and warning messages which
enhance the application of the
BPIOITJ Manual.
3-112" disk only $495

Version 2.0
MODULE II:
MOMENT CONNECTIONS
$400
AISC Design Guide-Steel
and Composite aeams with
c[00 AISC
ASD format only $400 Web Openings-to specific
design problems.
3-112" or 5-114" disk. Includes
IIc[oD DATABASE
Contains the properties and
STEMFIRE AISC Design Guide $495.00 dimensions of structural steel
Determines safe and economi· shapes, corresponding to data
cal fire protection for steel
beams, columns and trusses. AISC FOR published in the most recent
LRFD and ASD Manuals of
Based on rational procedures
developed by AISI which ex- '<. ;"....y r1 1- / >/OOv
/-
AUTOCAD Steel Construction. Presented
in the ASCII format for W, S,
Saves time doing detail draw-
tend the published UL fire M, HP and other common
resistive designs to other
possible rolled structural
,- -i- - _.n
ings of structural steel shapes
in AutoCAD. Usts properties
corresponding to data in the
shapes and chamels.
Available in U.S. customary
shapes and common protec- units or metric units. May be
tion material requirements.
Two 5-114" disks
Irl or
![ Irl' ""~ most recent LRFD and ASD
manuals. Parametrically draws
to scale the end, elevation and
converted to Lotus 1-2-3 PRN
format.
& users manual $96 3-112" or 5·114' disk $60
plan views of common shapes.
(sorry, no 3-112"
3-112" or 5-114" disk $120

ORDER YOUR AISC SOFTWARE PACKAGES TODAY


VISA MASTERCARD
CALL (312) 670-2400
FOR FASTER SERVICE FAX YOUR ORDER (312) 670-5403
OR SEND MAIL ORDERS TO: AI SC SOFTWARE, P.O . BOX 806276, CHICAGO, IL 60680- 4124.
A LLOW 2 -3 WEEKS FOR MAIL ORDER S; 7 - 10 DAYS ON PHON E, FAX ORDERS.
CREDIT C ARD S ONLY ON PHONE, FAX ORD ERS

You might also like